2024-107_Wray Facility Renovation Project Manual.pdf

PDF 6 MB Posted

Attached to
2024-107 Wray Facility Renovation
Solicitation number
2024-107
Issued by
Ouray County, Weston CDP, Colorado

About this file

This government solicitation document is a construction project manual issued by the State of Colorado's State Buildings and Real Estate Programs for Morgan Community College, specifically for the Wray Facility Renovation Project #2024-107. The project involves renovating and finishing approximately 3,000 square feet of a former gas station located at 300 Dexter Street in Wray, Colorado, which has been vacant for 15-20 years. The renovation will transform the space into educational facilities, including classrooms, a computer lab, conference room, offices, and restrooms. Exterior work includes removing an existing canopy, assessing the parking lot condition, and refreshing the building's exterior. The project is scheduled with key dates including a mandatory pre-bid meeting on April 3rd, 2025, email questions due by April 10th, sealed bids due on April 24th, and an anticipated construction start in May 2025, with completion projected for December 2025.

The project has specific bidder qualification requirements, including demonstrating at least two general contracting projects over $500,000 in the past three years, providing evidence of bonding capacity up to $500,000, and complying with Colorado labor regulations requiring 80% of labor to be from Colorado residents. The estimated construction cost is $605,000, and bidders must adhere to prevailing wage requirements and the Buy Clean Colorado Act, which mandates environmental product declarations for certain materials. The solicitation indicates that preference will be given to Colorado resident bidders, and contractors must use the LCPTracker cloud-based labor compliance system. Bidders must submit two hard copies of sealed bids to Morgan Community College and are subject to various technical, safety, and documentation requirements detailed in the comprehensive project manual.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Wray Facility Renovation

Project # 2024-107

STATE OF COLORADO

STATE BUILDINGS AND REAL ESTATE PROGRAMS

100% Construction Documents Specifications

December 05, 2024

Architect:

Architectural Workshop, LLC

2 Kalamath Street Denver, CO 80223

PH: 303.788.1717

OFFICE OF THE STATE ARCHITECT

STATE BUILDINGS PROGRAM

INDEX FOR PROJECT MANUAL ‐ BIDDING

This information should be included in the Project Manual or uploaded with the Solicitation if no Project Manual is provided.

1. Consultant Project Manual Cover

2. Advertisement for Bids

3. Information for Bidders (SBP-6.12)

4. Prevailing Wage Determinations

5. Bid Form (SBP-6.13)*

6. Bid Alt Form (SBP-6.131)

7. Specimen of Bid Bond (SBP-6.14)*

8. Specimen of Notice of Award (SBP-6.15) *

9. Contractor’s Agreement or SBP Purchase Order

10. General Conditions of the Contract

11. Supplementary General Conditions (NA)

12. Specimen of Performance Bond (SC-6.22) *

13. Specimen of Labor and Material Bond (SC-6.221) *

14. Specimen of Notice to Proceed (SBP-6.26) *

15. Specimen of Notice of Substantial Completion (SBP-07) *

16. Specimen of Notice of Occupancy/Use (SBP-01) *

17. Specimen of Notice of Acceptance (SBP-6.27) *

18. Specimen of Notice of Contractor's Settlement (SBP-7.3) *

19. A/E Consultants Specifications

Items in Bold are included in the electronic solicitation and attached to the Project Manual.

*These documents may be referenced, examined and downloaded from the Office of the State Architect Website under State Buildings/Project Management Policies & Guidelines in lieu of including the document in the Project Manual/Solicitation.

SBP-BidIndex Rev. 8/2023

OSA-AFB-1 pg. 1

REV 1/2024

ADVERTISEMENT FOR BIDS

Design/Bid/Build State of Colorado

Morgan Community College Notice Number: 2025000185

Project No:2024-107

Project Title: Wray Facility Renovation

Estimated Construction Cost: $605,000

Settlement Notice For all projects with a total dollar value above $150,000 Notice of Final Settlement is required by C.R.S. §38-26-107(1). Final Settlement, if required, will be advertised in the same location as the original solicitation.

Project Description

Renovation and finish of property located at 300 Dexter Street Wray, CO.

Renovation and finish of approximately 3,000 square feet of a building last used as a gas station which has been vacant for the last 15-20 years. Renovation and finish will consist of classroom, computer lab space, conference room, offices, and restrooms. Exterior work will consist of the removal of a canopy, assess the condition of the parking lot, and refresh of the building exterior.

Contractor shall assist MCC in compliance with prevailing wage requirements.

Scope of Services

The contractor is responsible for managing and completing all demolition and new work as noted in the drawings titled 2024-107_Morgan CC Wray Campus T.I. Addendum #1 – Code Review dated 02/24/2025 and the specification manual titled Wray Facility Renovation Project # 2024-107 100% Construction Documents Specifications dated December 05, 2024 plus addendum #2 dated March 25, 2025.

Minimum Requirements

Notice is hereby given to all interested parties that all firms will be required to meet all minimum requirements to be considered for this project. Interested bidders should be prepared to show evidence of the following to be considered as qualified, as a minimum:

1. Provided General Contracting services within the last three (3) years for at least two (2) projects

OSA-AFB-1 pg. 2 each in excess of $500,000 (hard costs), utilizing the expertise present in their Colorado Office;

and

2. Demonstrated specific General Contracting experience in projects of similar scope and complexity; and

3. Demonstrated bonding capability up to $500,000 for an individual project coincidentally with current and anticipated workloads; provide letter from surety that affirms this capacity.

4) Per C.R.S. §24-92-Part 2, a public construction project in the amount of five hundred thousand dollars or more shall be subject to the State prevailing wage rate, of the regular, holiday, and overtime wages paid and the general prevailing payments on behalf of employees to lawful welfare, pension, vacation, apprentice training, and educational funds in the State, for each employee needed to execute the contract. Payments to the funds must constitute an ordinary business expense deduction for federal income tax purposes by contractors and subcontractors.

Contractors are required to pay their employees at weekly intervals and shall comply with the enforcement provisions of C.R.S. §24-92-209. Contractors awarded a project of this size will be required to utilize the LCPTracker cloud-based labor compliance and certified payroll application.

Per C.R.S. §24-92-117, a public construction project in the amount of five hundred thousand dollars or more shall be subject to the Buy Clean Colorado (BCCO) Act program requirements.

The BCCO Act requires the Office of the State Architect to establish a maximum acceptable global warming potential (GWP) limit for each category of eligible materials, which include asphalt and asphalt mixtures, cement and concrete mixtures, glass, post-tension steel, reinforcing steel, structural steel, and wood structural elements. For any solicitation for a contract for the design of an eligible project, a State Agency or institution shall require the designer who is awarded the contract to include, in project specifications when final construction documents are released, a current Environmental Product Declaration (EPD) that meets the maximum acceptable GWP limits for each eligible material specified for the project. A contractor that is awarded a contract for an eligible project shall not install any eligible materials on the project until the contractor submits an EPD for each eligible material procured for the project.

Firms meeting the minimum requirements may obtain the bidding documents on the website accompanying this advertisement.

Bid documents can be located on Morgan Community College’s BidNet site at:

www.bidnetdirect.com//mcc

Other Information

Preference shall be given to Colorado resident bidders and for Colorado labor, as provided by law.

Per C.R.S. §24-105-201 If the construction value is $50,000 or greater a Bid Bond and Power of Attorney or Proposal Guaranty is required in an amount not less than 5% of the total Bid.

Pre-Bid Meeting

A mandatory Pre-Bid Meeting will be held at:

OSA-AFB-1 pg. 3

Address: 300 Dexter Street Wray, CO Date/Time: Thursday, April 3rd at 10:00am MST

Schedule/Submission Details

1. The schedule of events for the AFB process and an outline of the schedule for the balance of the project is as follows:

Advertisement 3/27/2025

Mandatory Pre-Bid Conference and Tour 4/3/2025 at 10:00am

Date Email Questions Due 4/10/2025 by EOD

Date Email Answers Issued 4/17/2025 by EOD

Sealed Bids Due/Public Bid Opening 4/24/2025 3:00P

Negotiation of General Contractor Contract 4/28/2025 by EOD

Contract Approval (projected) 5/4/2025 by EOD

Anticipated Design Start NA

Anticipated General Contractor Start 5/4/2025 by EOD

Anticipated Construction Start/Finish December 2025

2. Two (2) hard copies of the sealed bid are due Thursday, April 24th, 2025 and shall be received no later than 3:00 PM (MD/ST), and shall be submitted/accepted via mail or hand delivery at the following address:

Agency: Morgan Community College

Contact Name: Chloe Hirschfeld

Address: 920 Barlow Road

Fort Morgan, CO 80701

Comments: Late sealed bids will be rejected without consideration. Morgan Community College and the State of Colorado assume no responsibility for costs related to the preparation of submittals.

3. The above schedule is tentative. Responding firms shall be notified of revisions in a timely manner by email or posted on ColoradoVSS website. Respondents may elect to verify times and dates by email, but no earlier than 36 hours before the scheduled date and time.

Point of Contact/Clarification

Name: Chloe Hirschfeld Agency: Morgan Community College

Phone: 970-542-3126

Email: Chloe.hirschfeld@morgancc.edu

OSA-AFB-1 pg. 4

This Notice is also available on the web at:

https://prd.co.cgiadvantage.com/PRDVSS1X1/Advantage4

Media of Publication(s): Colorado VSS & BidNet Publication Dates: 3/28/2025 https://urldefense.proofpoint.com/v2/url?u=https-3A__prd.co.cgiadvantage.com_PRDVSS1X1_Advantage4&d=DwMFaQ&c=sdnEM9SRGFuMt5z5w3AhsPNahmNicq64TgF1JwNR0cs&r=y4NXvnZF0G_9xm7aCiy1k6-L5VGt1prk6Qj29OyMbU4&m=XYGsrAm2M8IsNsNe-WcdpMj3apPedKHjHxjn8EIHyqLltAHS8LvemwLVLAWu8Xve&s=-_IU0MUTu1OZimhYDWCuIsetKBxrWGY8XtUXL3vte6s&e=

SBP-6.12 Page 1 of 2 Rev. 05/2024

STATE OF COLORADO

OFFICE OF THE STATE ARCHITECT

STATE BUILDINGS PROGRAMS

INFORMATION FOR BIDDERS

Institution or Agency: Morgan Community College

Project No./Name: 2024-107/Wray Facility Renovation

1. BID FORM: Bidders are required to use the Bid form attached to the bidding documents. Each bidder is required to bid on all alternates and indicate the time from the date of the Notice to Proceed to Substantial Completion in calendar days, and in addition, the bidder is required to indicate the period of time to finally complete the project from Substantial Completion to Final Acceptance, also in calendar days. Bids indicating times for Substantial Completion and Final Acceptance in excess of the number of days indicated in the Advertisement for Bids for completion of the entire Project may be found non-responsive and may be rejected. The bid shall not be modified or conditioned in any manner. Bids and applicable bid security shall be submitted according to the following instructions:

2. INCONSISTENCIES AND OMISSIONS: Bidders may request clarification of any seeming inconsistencies, or matters seeming to require explanation, in the bidding documents at least three (3) business days prior to the time set for the opening of Bids. Decisions of major importance on such matters will be issued in the form of addendum.

3. APPLICABLE LAWS AND REGULATIONS: The bidder’s attention is called to the fact that all work under this Contract shall comply with the provisions of all state and local laws, approved state building codes, ordinances and regulations which might in any manner affect the work to be done or those to be employed in or about the work. Labor for work shall be governed by the provisions of Colorado law which are hereinafter set forth in Articles 27 and 52 of the General Conditions. This includes the requirements for apprenticeship and prevailing wage on Public Projects. The bidder should be aware that reporting of embodied carbon emissions of eligible materials shall be governed by the provisions of Colorado State Law. This includes the requirements for Environmental Product Declarations (EPDs) that meet the maximum acceptable Global Warming Potential (GWP) limits as established by the Office of the State Architect.

4. BID SECURITY: A bid security of not less than 5% of the bid price is required when the price is estimated to be $50,000 or more. The security shall be a bond by a surety company, the equivalent in cash, or otherwise supplied in a form satisfactory for the State. Noncompliance requires the bid to be rejected as nonresponsive.

5. TAXES: The bidder’s attention is called to the fact that the Bid submitted shall exclude all applicable federal excise or manufacturers’ taxes and all state sales and use taxes as hereinafter set forth in Article 9.3 of the

GENERAL CONDITIONS.

6. OR EQUAL: The words “OR EQUAL” are applicable to all specifications and drawings relating to materials or equipment specified. Any material or equipment that will fully perform the duties specified, will be considered “equal”, provided the bid submits proof that such material or equipment is of equivalent substance and function and is approved, in writing. Requests for the approval of “or equal” shall be made in writing at least five (5) business days prior to bid opening. During the bidding period, all approvals shall be issued by the Architect/Engineer in the form of addenda at least two (2) business days prior to the bid opening date.

7. ADDENDA: Owner/architect initiated addenda shall not be issued later than two (2) business days prior to bid opening date. All addenda shall become part of the Contract Documents and receipt must be acknowledged on the Bid form.

8. METHOD OF AWARD - LOWEST RESPONSIBLE BIDDER: If the bidding documents for this project require alternate prices, additive and/or deductible alternates shall be listed on the alternates bid form provided by the Principal Representative. Bidders should note the Method of Award is applicable to this Bid as stated below.

A. DEDUCTIBLE ALTERNATES: The lowest responsible Bid, taking into account the Colorado resident bidder preference provision of Colorado law, will be determined by and the contract will be awarded on the

SBP-6.12 Page 2 of 2 Rev. 05/2024 base bid combined with deductible alternates, deducted in numerical order in which they are listed in the alternates bid form provided by the Principal Representative. The subtraction of alternates shall result in a sum total within available funds. If this bid exceeds such amount, the right is reserved to reject all bids. An equal number of alternates shall be subtracted from the base bid of each bidder within funds available for purposes of determining the lowest responsible bidder.

B. ADDITIVE ALTERNATES: The lowest responsible Bid, taking into account the Colorado resident bidder preference provision of Colorado law, will be determined by and the contract will be awarded on the base bid plus all additive alternates added in the numerical order in which they are listed in the alternates bid form provided by the Principal Representative. The addition of alternates shall result in a sum total within available funds. If this bid exceeds such amount, the right is reserved to reject all bids. An equal number of alternates shall be added to the base bid of each bidder within funds available for purposes of determining the lowest responsible bidder.

C. DEDUCTIBLE AND ADDITIVE ALTERNATES: Additive alternates will not be used if deductible alternates are used and deductible alternates will not be used if additive alternates are used.

10. NOTICE OF CONTRACTOR’S SETTLEMENT – Agencies/institutions must indicate in the initial Solicitation

(Advertisement for Bids, Documented Quotes, or Requests for Proposals) whether settlement will be advertised in newspapers or electronic media.

"General Decision Number: CO20240001 11/22/2024

Superseded General Decision Number: CO20230001

State: Colorado

Construction Type: Building

Counties: Alamosa, Archuleta, Baca, Bent, Chaffee, Cheyenne, Conejos, Costilla, Crowley, Custer, Delta, Dolores, Eagle, Fremont, Garfield, Grand, Gunnison, Hinsdale, Huerfano, Jackson, Kiowa, Kit Carson, La Plata, Lake, Las Animas, Lincoln, Logan, Mineral, Moffat, Montezuma, Montrose, Morgan, Otero, Ouray, Phillips, Pitkin, Prowers, Rio Blanco, Rio Grande, Routt, Saguache, San Juan, San Miguel, Sedgwick, Summit, Washington and Yuma Counties in Colorado.

BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2024. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.90 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2024. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

12/26/24, 9:42 AM SAM.gov https://sam.gov/wage-determination/CO20240001/11 1/9

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/05/2024 1 02/23/2024 2 05/31/2024 3 07/05/2024 4 07/19/2024 5 09/06/2024 6 09/13/2024 7 09/20/2024 8 10/11/2024 9 11/01/2024 10 11/08/2024 11 11/22/2024

ASBE0028-004 07/01/2024

ALL COUNTIES EXCEPT ARCHULETA, CONEJOS, COSTILLA, LA PLATA AND

MONTEZUMA

Rates Fringes

Asbestos Workers/Insulator (Includes application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems.....................$ 34.98 16.47

ASBE0076-002 01/01/2023

ARCHULETA, CONEJOS, COSTILLA, LA PLATA AND MONTEZUMA

Rates Fringes

Asbestos Workers/Insulator (Includes application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems)....................$ 35.76 11.73

BRCO0007-003 05/01/2024

ALAMOSA, ARCHULETA, BACA, BENT, CHAFFEE, CHEYENNE, CONEJOS,

COSTILLA, CROWLEY, CUSTER, DOLORES, FREMONT, HINSDALE,

HUERFANO, KIOWA, KIT CARSON, LA PLATA, LAS ANIMAS, LINCOLN,

MINERAL, MONTEZUMA, PROWERS, SAGUACHE & SAN JUAN COUNTIES

Rates Fringes

BRICKLAYER.......................$ 32.93 14.29

BRCO0007-009 05/01/2024

DELTA, GARFIELD, GRAND, GUNNISON, JACKSON, LAKE, LOGAN, MOFFAT,

https://sam.gov/wage-determination/CO20240001/11 2/9

MONTROSE, MORGAN, OTERO, OURAY, PHILLIPS, RIO BLANCO, RIO

GRANDE, SAN MIGUEL, SEDGWICK, WASHINGTON & YUMA COUNTIES

Rates Fringes

BRICKLAYER.......................$ 32.93 14.29

BRCO0007-010 01/01/2024

EAGLE, PITKIN, ROUTT & SUMMIT COUNTIES

Rates Fringes

BRICKLAYER.......................$ 42.37 15.21

CARP9901-006 05/01/2024

Baca, Bent, Chaffee, Cheyenne, Clear Creek, Crowley, Custer, Delta, Eagle, Elbert, Fremont, Garfield, Gilpin, Grand, Gunnison, Huerfano, Jackson, Kiowa, Kit Carson, Lake, Las Animas, Lincoln, Logan, Moffat, Montrose, Morgan, Otero, Ouray, Park, Phillips, Pitkin, Prowers, Rio Blanco, Routt, Saguache, Sedgwick, Summit, Teller, Washington and Yuma Counties, Colorado

Rates Fringes

Carpenters:

Formbuilding/Formsetting, Drywall Hanging/Framing and Metal Stud Work.........$ 33.11 12.17

CARP9901-007 05/01/2024

Rates Fringes

CARPENTER

Formbuilding/Formsetting, Drywall Hanging/Framing and Metal Stud Work.........$ 33.11 12.17

ELEC0012-010 09/01/2024

ALAMOSA, ARCHULETA, BACA, BENT, CHAFFEE, CONEJOS, COSTILLA,

CROWLEY, CUSTER, FREMONT, HUERFANO, KIOWA, LAS ANIMAS, MINERAL,

OTERO, PROWERS, RIO GRANDE AND SAGUACHE COUNTIES

Rates Fringes

Electricians:....................$ 33.55 15.71

ELEC0068-007 06/01/2024

EAGLE, GRAND, JACKSON, LAKE, LOGAN, MORGAN, PHILLIPS, SEDGWICK,

SUMMIT, WASHINGTON AND YUMA COUNTIES

Rates Fringes

ELECTRICIAN......................$ 44.95 19.08

(Including low voltage wiring and installation of fire alarms, telephones, computers and temperature controls https://sam.gov/wage-determination/CO20240001/11 3/9

ELEC0111-006 01/01/2024

DOLORES, GARFIELD, GUNNISON, HINSDALE, LA PLATA, MOFFAT,

MONTEZUMA, RIO BLANCO, AND ROUTT COUNTIES

Rates Fringes

ELECTRICIAN......................$ 30.00 12.70

(Including low voltage wiring and installation of fire alarms, telephones, computers and temperature controls)

ELEC0111-009 01/01/2024

OURAY, PITKIN, SAN JUAN AND SAN MIGUEL COUNTIES

Rates Fringes

ELECTRICIAN......................$ 35.20 13.86

(Including low voltage wiring and installation of fire alarms, telephones, computers and temperature controls)

ELEC0111-013 01/01/2024

DELTA AND MONTROSE COUNTIES

Rates Fringes

ELECTRICIAN......................$ 30.00 12.70

(Including low voltage wiring and installation of fire alarms, telephones, computers and temperature controls)

ELEC0113-003 06/01/2024

CHEYENNE, KIT CARSON & LINCOLN COUNTIES

Rates Fringes

ELECTRICIAN (Including low voltage wiring and installation of fire alarms, telephones, computers and temperature controls)............$ 38.20 18.10

ELEV0025-002 01/01/2024

Rates Fringes

ELEVATOR MECHANIC................$ 54.20 37.885+a+b

FOOTNOTE:

a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.

b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.

IRON0024-002 11/01/2024

Rates Fringes

Ironworker, reinforcing and structural.......................$ 39.21 12.50 https://sam.gov/wage-determination/CO20240001/11 4/9

LABO0720-003 05/01/2021

Rates Fringes

LABORER

Concrete/Mason Tenders......$ 21.10 7.89

PAIN0930-001 07/01/2024

Rates Fringes

GLAZIER..........................$ 35.51 12.65

PLAS0577-001 05/01/2024

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 33.73 14.00

PLUM0003-006 06/01/2024

GRAND, JACKSON, LAKE, LOGAN, MORGAN, PHILLIPS, SEDGWICK,

SUMMIT, WASHINGTON, AND YUMA. PARTS OF ELBERT, EAGLE, KIT

CARSON & LINCOLN COUNTIES

Rates Fringes

PLUMBER

(Including HVAC Work).......$ 45.43 20.15

PLUM0058-009 07/01/2024

ALAMOSA, BACA, BENT, CHAFFEE, CHEYENNE, CONEJOS, COSTILLA,

CROWLEY, CUSTER, FREMONT, HUERFANO, KIOWA, KIT CARSON

(Including towns of Dfalgler, Seibert, Vona, Stratton and Bethune), LAS ANIMAS, LINCOLN (Including towns of Geona and Arriba in the southern portion of the county), MINERAL, OTERO, PROWERS, RIO GRANDE, AND SAGUACHE COUNTIES

Rates Fringes

PLUMBER/PIPEFITTER

(Plumbers include HVAC work) (Pipefitters exclude HVAC work).......................$ 41.40 17.17

PLUM0145-001 07/01/2024

ARCHULETA, DELTA, DOLORES, EAGLE (Eagle County is divided from where Pitkin and Lake Counties join on the north, and in a straight line to and including the town of Edwards and northerly to the south east corner of Routt County), GARFIELD, GUNNISON, HINSDALE, LA PLATA, MOFFAT, MONTEZUMA, MONTROSE, OURAY, PITKIN, RIO BLANCO, ROUTT, SAN JUAN AND SAN MIGUEL

COUNTIES

Rates Fringes

PLUMBER/PIPEFITTER

PLUMBERS (Including HVAC https://sam.gov/wage-determination/CO20240001/11 5/9 work) & PIPEFITTERS (Excluding HVAC work).......$ 38.67 15.08

PLUM0208-005 06/01/2024

CLEAR CREEK, GILPIN, GRAND, JACKSON, LAKE, LOGAN, MORGAN,

PHILLIPS, SEDGWICK, SUMMIT, WASHINGTON, YUMA. PARTS OF ELBERT,

EAGLE, KIT CARSON, LINCOLN, AND PARK COUNTIES

Rates Fringes

PIPEFITTER

(Excluding HVAC pipe).......$ 44.15 22.43 (Excluding HVAC work).......$ 43.40 21.10

ROOF0058-001 05/01/2024

Rates Fringes

ROOFER...........................$ 32.55 5.97

* SHEE0009-001 07/01/2024

Rates Fringes

Sheet metal worker (Includes HVAC duct and installation of HVAC systems)....................$ 39.47 21.78

* SUCO2001-008 12/20/2001

Rates Fringes

Carpenters:

Acoustical..................$ 15.69 ** 3.15 All other Work..............$ 15.94 ** 3.41

Drywall Finisher/Taper...........$ 14.44 ** 2.19

Laborer, common..................$ 9.75 **

PAINTER..........................$ 15.19 **

(Excluding drywall finishing/taping) Brush, Roller, Spray

Power equipment operators:.......$ 13.41 ** Backhoe

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($17.20) or 13658 ($12.90). Please see the Note at the top of the wage determination for more information. Please also note that the minimum wage requirements of Executive Order 14026 are not currently being enforced as to any contract or subcontract to which the states of Texas, Louisiana, or Mississippi, including their agencies, are a party.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave https://sam.gov/wage-determination/CO20240001/11 6/9 for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates https://sam.gov/wage-determination/CO20240001/11 7/9 the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

State Adopted Rate Identifiers

Classifications listed under the ""SA"" identifier indicate that the prevailing wage rate set by a state (or local) government was adopted under 29 C.F.R �1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.

01/03/2024 reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

https://sam.gov/wage-determination/CO20240001/11 8/9

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

https://sam.gov/wage-determination/CO20240001/11 9/9

State Form SBP-6.13 Rev 07/2022

STATE BUILDINGS PROGRAMS

BID

Institution/Agency: Morgan Community College

Project No./Name: 2024-107/Wray Facility Renovation

Bidder Acknowledges Receipt of Addenda Numbers:

Bidder Anticipates Services outside the United States or Colorado:* No ☐ Yes ☐ If Yes see 3A below

Bidder will comply with 80% Colorado Labor on project above $500,000: Yes☐ No ☐ If No see 3B below

Bidder is a Service-Disabled Veteran Owned Small Business:* No ☐ Yes ☐ If Yes see 3C below

Base Bid $

(Refer to Bid Alternate Form SC-6.13.1 Attached, If Applicable)

Bidder’s Time of Completion

a. Time Period from Notice to Proceed to Substantial Completion:

b. Time Period from Substantial Completion to Final Acceptance:

c. Total Time of Completion of Entire Project (a + b):

1. BID: Pursuant to the advertisement by the State of Colorado dated 3/28/2025 the undersigned bidder hereby proposes to furnish all the labor and materials and to perform all the work required for the complete and prompt execution of everything described or shown in or reasonably implied from the Bidding Documents, including the Drawings and Specifications, for the work and for the base bid indicated above. Bidders should include all taxes that are applicable.

2. EXAMINATION OF DOCUMENTS AND SITE: The bidder has carefully examined the Bidding Documents, including the Drawings and Specifications, and has examined the site of the Work, so as to make certain of the conditions at the site and to gain a clear understanding of the work to be done.

3. PARTIES INTERESTED IN BID: The bidder hereby certifies that the only persons or parties interested in this Bid are those named herein, and that no other bidder or prospective bidder has given any information concerning this Bid.

A. If the bidder anticipates services under the contract or any subcontracts will be performed outside the United States or Colorado, the bidder shall provide in a written statement which must include, but need not be limited to the type of services that will be performed at a location outside the United States or Colorado and the reason why it is necessary or advantageous to go outside the United States or Colorado to perform such services. (Does not apply to any project that receives federal moneys) *

B. For State Public Works projects per C.R.S. 8-17-101, Colorado labor shall be employed to perform at least 80% of the work. Colorado Labor means any person who is a resident of the state of Colorado at the time of the Public Works project. Bidders indicating that their bid proposal will not comply with the 80% Colorado Labor requirement are required to submit written justification along with the bid submission. (Does not apply to any project that receives federal moneys) *

C. A Service-Disabled Veteran Owned Small Business (SDVOSB) per C.R.S. 24-103-211, means a business that is incorporated or organized in Colorado or maintains a place of business or has an office in Colorado and is officially registered and verified by the Center for Veteran Enterprise within the U.S. Department of Veteran Affairs. Attach proof of certification along with the bid submission. *

D. Projects estimated to be $1 million or more that do not receive federal funds are required to comply with the State Apprenticeship Utilization requirements C.R.S. 24-92-115

E. Projects estimated to be $500,000 or more that do not receive federal funds are required to comply with the State Prevailing Wage requirements C.R.S. 24-92-201 through 210.

4. BID GUARANTEE: This Bid is accompanied by the required Bid Guarantee. Per C.R.S. §24-105-201 If the construction value is $50,000 or greater a Bid Bond and Power of Attorney or Proposal Guaranty is required in an amount not less than 5% of the total Bid. You are authorized to hold said Bid Guarantee for a period of not more than thirty (30) days after the opening of the Bids for the work above indicated, unless the undersigned bidder is awarded the Contract, within said period, in which event the Office of the State Architect, may retain said Bid Guarantee, until the undersigned bidder

State Form SBP-6.13 Rev 07/2022 has executed the required Agreement and furnished the required Performance Bond, Labor and Material Payment Bond, and Insurance Policy.

5. TIME OF COMPLETION: The bidder agrees to achieve Substantial Completion of the Project from the date of the Notice to Proceed within the number of calendar days entered above, and in addition, further agrees that the period between Substantial Completion and Final Acceptance of the Project will not exceed the number of calendar days noted above.

If awarded the Work, the bidder agrees to begin performance within ten (10) days from the date of the Notice to Proceed subject to Article 46, Time of Completion and Liquidated Damages of the General Conditions of the Contract, and agrees to prosecute the Work with due diligence to completion. The bidder represents that Article 7D of the Contractor’s Agreement (SC-6.21) has been reviewed to determine the type and amount of any liquidated damages that may be specified for this contract.

6. EXECUTION OF DOCUMENTS: The bidder understands that if this Bid is accepted, bidder must execute the required Agreement and furnish the required Performance Bond, Labor and Material Payment Bond, Insurance Policy and Certificates of Insurance within ten (10) days from the date of the Notice of Award, and that the bidder will be required to sign to acknowledge and accept the Contract Documents, including the Drawings and Specifications.

7. ALTERNATES: Refer to the Information for Bidders (SC-6.12) for Method of Award for Alternates and use State Form SBP-6.13.1 Bid Alternates form to be submitted with this bid form if alternates are requested by the institution/agency in the solicitation documents.

8. Submit wage rates (direct labor costs) for prime contractor and subcontractor as requested by the institution/agency in the solicitation documents.

9. The right is reserved to waive informalities and to reject any and all Bids.

*Does not apply to projects for Institutions of Higher Education that have opted out of the State Procurement Code.

SIGNATURES: If the Bid is being submitted by a Corporation, the Bid shall be signed by an officer, i.e., President or Vice-President. If a sole proprietorship or a partnership is submitting the Bid, the Bid shall so indicate and be properly signed.

Dated this Day of , 20

THE BIDDER:

Company Name Address (including city, state and zip)

Phone number:

Name (Print) and Title Signature

SBP –6.131

Issued 8/2023

STATE BUILDINGS PROGRAM

BID ALTERNATES FORM

Additive alternates will not be used if deductible alternates are used and deductible alternates will not be used if additive alternates are used.

Additive Alternates (If Applicable) Refer to specification section 01 03 00 for descriptions of add alternates. If the add alternates are accepted, the base bid would be modified by the amount entered by the bidder.

A.A. No. 1 Add $

A.A. No. 2 Add $

A.A. No. 3 Add $

A.A. No. 4 Add $

A.A. No. 5 Add $

A.A. No. 6 Add $

A.A. No. 7 Add $

A.A. No. 8 Add $

A.A. No. 9 Add $

A.A. No. 10 Add $

Deductive Alternates (If Applicable)

Refer to specification section for descriptions of the deductive alternates. If the deductive alternates are accepted, the base bid would be modified by the amount entered by the bidder.

D.A. No. 1 Deduct $

D.A. No. 2 Deduct $

D.A. No. 3 Deduct $

D.A. No. 4 Deduct $

D.A. No. 5 Deduct $

D.A. No. 6 Deduct $

D.A. No. 7 Deduct $

D.A. No. 8 Deduct $

D.A. No. 9 Deduct $

D.A. No. 10 Deduct $

THE BIDDER:

Company Name

Signature Date

SBP-6.14

Rev. 7/2022

STATE BUILDINGS PROGRAM

BID BOND

KNOW ALL MEN BY THESE PRESENTS:

WHEREAS, hereinafter called the “PRINCIPAL”, is submitting a PROPOSAL for the above described project, to the STATE OF COLORADO, hereinafter called the “OBLIGEE”.

WHEREAS, the Advertisement for Bids has required as a condition of receiving the Proposals that the Principal submit with the PROPOSAL GUARANTY in an amount not less than five per cent (5%) of the Proposal, which sum it is specifically agreed is to be forfeited as Liquidated Damages in the event that the Principal defaults in his obligation as hereinafter specified, and, in pursuance of which Requirement, this Bid is made, executed and delivered.

NOW THEREFORE, the Principal and a corporation of the State of , duly authorized to transact business in Colorado, as Surety, are held and firmly bound unto the Obligee, in the sum of five per cent (5%) of the Principal’s total bid price, lawful money of the United States for the payment of which sum, well and truly to be made to the Obligee, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

FURTHER THAT, a condition of the obligation that the Principal shall maintain his Proposal in full force and effect for thirty (30) days after the opening of the proposals for the project, or, if the Principal’s Proposal is accepted, the Principal shall, within the prescribed time, execute the required Agreement, furnish the required Performance Bond, Labor and Material Payment Bond, Insurance Policy, and Certificates of Insurance, then this obligation shall be null and void, otherwise it shall remain in full force and effect, and subject to forfeiture upon demand as Liquidated Damages.

IN WITNESS WHEREOF said Principal and Surety have executed this Bond, this day of , A.D., 20 .

(Corporate Seal) THE PRINCIPAL

Company Name

ATTEST

Address (including city, state and zip)

Secretary Phone number:

Name (Print) Signature

Name (Print) and Title

SIGNATURES If the “Principal” is doing business as a Corporation, the Bid Bond shall be signed by an officer, i.e., President or Vice President. The signature of the officer shall be attested to by the Secretary and properly sealed.

If the “Principal” is an individual or a partnership, the Bid Bond shall so indicate and be properly signed.

(Corporate Seal) THE SURETY

By __________________________________________

Secretary Attorney-in-Fact

THIS BOND MUST BE ACCOMPANIED BY POWER OF ATTORNEY, EFFECTIVELY DATED.

FAILURE TO PROVIDE A PROPERLY EXECUTED BID BOND WITH A PROPERLY EXECUTED POWER OF ATTORNEY

WILL RESULT IN THE BIDDER’S PROPOSAL BEING DEEMED NON-RESPONSIVE.

SBP-6.15

Rev. 7/2022

STATE BUILDINGS PROGRAM

NOTICE OF AWARD

(Design/Bid/Build and Design/Build Lump Sum Agreements)

Date of Notice:

Date to be inserted by the Agency/Institution

Agency/Institution: Morgan Community College

TO: [Legal name of Contractor]

The State of Colorado, represented by the undersigned, has considered the Proposals submitted for the above described work.

Your Proposal, deemed to be in the best interest of the State of Colorado, in the amount of DOLLARS AND NO/100* ($ *) is hereby accepted, pending final execution of the Agreement.

You are required to execute the approved Agreement and to furnish the Performance Bond, Labor and Material Payment Bond, Insurance Policy and Certificates of Insurance, Apprenticeship Utilization Certification(s) (if applicable) and Labor Overhead (Direct Labor Burdens) for Work performed by Contractor and major Subcontractors within ten

(10) days from the date of this Notice.

If you fail to execute said Agreement and to furnish said Performance Bond, Labor and Material Payment Bond, Insurance Policy, Certificates of Insurance, and Labor Overhead (Direct Labor Burdens) as described above within ten

(10) days from the date of this Notice, the State Controller is entitled to retain the amount of the Proposal Guaranty submitted with your Proposal as Liquidated Damages. In this event, the right is reserved to consider all of your rights arising out of the acceptance of your Proposal as abandoned and to award the work covered by your Proposal to another, or to re-advertise the Project, or otherwise dispose thereof.

By ________________________________________ By ________________________________________

State Buildings Program Date Principal Representative Date

(or Authorized Delegate) (Agency/Institution)

When completely executed, this form is to be sent by certified mail to the Contractor by the Principal Representative or delivered by any other means to which the parties agree.

SC-6.21

Rev. 01/2024

STATE OF COLORADO

STATE BUILDINGS PROGRAM

CONTRACTOR'S AGREEMENT

DESIGN/BID/BUILD (D/B/B)

(STATE FORM SC-6.21)

STATE AGENCY: Morgan Community College

DEPARTMENT ID: GJG

CONTRACT ID #: Insert CMS Number & Encumbrance Number

PROJECT #: 2024-107

PROJECT NAME: Wray Facility Renovation

VENDOR NAME: Insert Contractor's full Legal Name including "Inc.", "LLC" etc.

ATTACHMENT 1: The General Conditions of the Contractor’s Design/Bid/Build (D/B/B) Agreement (SC- 6.23)

Rev. 01/2024 TOC

STATE OF COLORADO

OFFICE OF THE STATE ARCHITECT

STATE BUILDINGS PROGRAM

CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT

(STATE FORM SC-6.21)

TABLE OF CONTENTS… ................................................................................................................. Page Table of Contents for the entire Agreement is located in THE GENERAL CONDITIONS OF THE

CONTRACTOR’S DESIGN/BID/BUILD (D/B/B) AGREEMENT (SC-6.23)

SIGNATURE PAGE

RECITALS:

1 ARTICLE 1 PERFORMANCE OF THE WORK

2 ARTICLE 2 PROVISIONS OF THE CONTRACT DOCUMENTS

3 ARTICLE 3 TIME OF COMPLETION

4 ARTICLE 4 ESSENTIAL CONDITION

5 ARTICLE 5 CONTRACT SUM

6 ARTICLE 6 CONTRACT DOCUMENTS

7 ARTICLE 7 OPTIONAL PROVISIONS AND ELECTIONS

7.1 MODIFICATION OF ARTICLE 2: Execution, Correlation, Intent of Documents, Communication and Cooperation

7.2 MODIFICATION 1 OF ARTICLE 27: Labor and Wages

7.3 MODIFICATION 2 OF ARTICLE 27: Labor and Wages

7.4 MODIFICATION OF ARTICLE 39: Non-Binding Dispute Resolution – Facilitated Negotiations

7.5 MODIFICATION OF ARTICLE 45: Guarantee Inspections After Completion

7.6 MODIFICATION OF ARTICLE 46: Time of Completion and Liquidated Damages

8 ARTICLE 8 NOTICE IDENTIFICATION

EXHIBIT A: CONTRACTORS BID ..................................................................................................... A

EXHIBIT B: PERFORMANCE BOND ................................................................................................. B

EXHIBIT C: LABOR AND MATERIAL PAYMENT BOND ..................................................................... C

EXHIBIT D: INSURANCE CERTIFICATE(S) ......................................................................................... D

EXHIBIT E: BUILDING CODE COMPLIANCE POLICY .......................................................................... E

EXHIBIT F: STATE SALES AND USE TAX FORM ................................................................................. F

EXHIBIT G: APPLICABLE PREVAILING WAGE DETERMINATIONS AND APPRENTICESHIP

CONTRIBUTION RATES ................................................................................................................ G

EXHIBIT H: APPRENTICESHIP UTILIZATION CERTIFICATIONS ........................................................... H

SUPPLEMENTARY GENERAL CONDITIONS: FEDERAL PROVISIONS

Rev. 1/2024 1

SIGNATURE PAGE

THE PARTIES HERETO HAVE EXECUTED THIS CONTRACT

Each person signing this Agreement represents and warrants that the signer is duly authorized to execute this Agreement and to bind the Party authorizing such signature.

*Persons signing for Contractor hereby swear and affirm that they are authorized to act on Contractor’s behalf and acknowledge that the State is relying on their representations to that effect. Principal is not a recognized title and will not be accepted.

Project Number/Name: Insert OSC Project Number followed by Project Name

CMS Contract ID No.: Insert CMS Number & Encumbrance Number

CONTRACTOR

INSERT-Legal Name of Contractor

By: Name & Title of Person Signing for Contractor

Date: _________________________

Jared S. Polis, Governor

INSERT-Name of Agency or IHE INSERT-Name & Title of Head of Agency or IHE

By: Name & Title of Person Signing for Agency or IHE

DEPARTMENT OF PERSONNEL & ADMINISTRATION

STATE BUILDINGS PROGRAM State Architect

(or authorized delegate)

By: Name & Title of SBP Delegate

In accordance with §24-30-202, C.R.S., this Contract is not valid until signed and dated below by the State Controller (or an authorized delegate) or the Title of IHE CFO per the Fiscal Rules of the individual Institution of Higher Education

STATE CONTROLLER

Robert Jaros, CPA, MBA, JD

By:___________________________________________ Name of Agency or IHE Delegate-Please delete if contract will be routed to OSC for approval

Effective Date:_____________________

Rev. 01/2024 2

STATE OF COLORADO

OFFICE OF THE STATE ARCHITECT

STATE BUILDINGS PROGRAM

CONTRACTOR'S DESIGN/BID/BUILD (D/B/B) AGREEMENT

Department ID: Insert Dept. Code Contract ID #: Insert Contract ID Project #: insert Project #

1. PARTIES. THIS AGREEMENT is entered into by and between the STATE OF COLORADO, acting by and through the Insert Department's or IHE's Full Legal Name hereinafter referred to as the State or Principal Representative, and Insert Contractor's full Legal Name including "Inc.", "LLC" etc. having its offices at Street address, City, State and Zip Code hereinafter referred to as the Contractor.

2. EFFECTIVE DATE AND NOTICE OF NONLIABILITY. This Agreement shall not be effective or enforceable until it is approved and signed by the State Controller or its designee (hereinafter called the “Effective Date”), but shall be effective and enforceable thereafter in accordance with its provisions. The State shall not be bound by any provision of this Contract before the Effective Date, and shall have no obligation to pay Contractor for any Work performed or expense incurred before the Effective Date.

RECITALS:

WHEREAS, the Principal Representative intends to engage the services of a Contractor for the Insert Project Name as provided by the State Controller's Office hereinafter called the Project; and

WHEREAS, authority exists in the Law and Funds have been budgeted, appropriated, and otherwise made available, and a sufficient unencumbered balance thereof remains available for payment.

WHEREAS, the State has Appropriated and the Principal Representative has been authorized to expend the total sum of Insert Dollar Value in Written Words Dollars ($ ) for this project including all professional services, construction/improvements, project contingencies, furnishings, movable equipment, reimbursable expenses and miscellaneous expenses; and

WITNESSETH, that the State of Colorado and the Contractor agree as follows:

1 ARTICLE 1 PERFORMANCE OF THE WORK

The Contractor shall perform all of the Work required for the complete and prompt execution of everything described or shown in, or reasonably implied from the Contract…