2024-08-30 Construct PT Sidewalk Addendum 2 write-up.pdf

PDF 83 KB Posted

Attached to
511/24376. CAK; Camp Grayling - Construct PT Sidewalk
Solicitation number
RFQ 171 240000000648 4
Issued by
Crawford County, Michigan

About this file

This is an addendum to bidding documents for the Department of Military Veterans Affairs (DMVA) sidewalk construction project at Camp Grayling Annual Training Site in Grayling, Michigan (Project #26B1524611). Addendum No. 2, issued on August 30, 2024, by Paradigm Design, modifies the original bidding documents dated August 9, 2024. Prospective bidders are required to acknowledge receipt of this addendum on the bid form, with failure to do so potentially resulting in bidder disqualification. The addendum consists of one page and includes revised drawing Sheet C-102, also dated August 30, 2024.

The primary change outlined in this addendum involves drawing modifications to Sheet C-102, which adds bench options that were previously introduced in Addendum No. 1. Bidders must incorporate these revised specifications into their proposals and submissions. No pricing terms, contract duration, or award information is specified in this addendum document, as it serves solely to clarify and modify the technical specifications and design requirements for the sidewalk construction project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. 2, August 30, 2024

RE: DMVA Construct PT Sidewalk Camp Grayling Annual Training Site, Grayling, MI Project #26B1524611

FROM: Paradigm Design 415 Leonard St. NW, Suite 200 Grand Rapids, MI 49504 Ph: (616) 785-5656 Fax: (616) 785-5657

TO: Prospective Bidders

This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents dated 08-09-2024, as noted below. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject Bidder to disqualification.

This Addendum consists of one page and the attached drawings, Sheet C-102 with the revised date of 08-30-2024.

CHANGES TO DRAWINGS:

1. Sheet C-102 – Added the options for the benches added in Addendum 1.

END OF ADDENDUM

Copies: ☒ File ☒ Bidding Contractors ☐ Additional Plan Holders

☒ Owner ☐ Bid File ☐ Plan Rooms

File details come from the government source that posted it. Updated .