2024-03-14_S0989.1_Bid_Tab_(Phase_I).xlsx
XLSX spreadsheet 48 KB Posted
- Attached to
- Lake Monroe Trail Loop - Phase 1
- Solicitation number
- CC-4508-24
- Issued by
- Seminole County, Florida
About this file
This is a Bid Tab and Engineers Opinion of Probable Cost document for Seminole County's Lake Monroe Trail Loop - Phase I construction project in Florida. The project encompasses the construction of concrete multi-use paths: an 8-foot wide concrete trail along Mellonville Avenue from E. Seminole Boulevard to Celery Avenue and a 12-foot wide concrete trail along Celery Avenue from Elliot Street to 343 feet east of Sipes Avenue. The scope of work includes all labor, materials, equipment, transportation, and coordination necessary for trail construction. The project timeline requires substantial completion within 255 calendar days from the Notice to Proceed, with final completion required 30 calendar days thereafter. A pre-bid meeting is scheduled for July 10, 2024, at 9:00 AM via Teams, and bids are due on July 31, 2024, at 2:00 PM. Bidders must be fully licensed and certified contractors in the State of Florida.
The Engineer's estimated project cost is $3,827,394.21, establishing the benchmark for this procurement. The bid tab itemizes multiple pay items including mobilization (ranging from 7.6% to 13.2%), maintenance of traffic (2.2% to 6.5%), sediment and erosion control measures, clearing and grubbing (3.7 acres at $3,453.00 per acre), removal of existing concrete (5,316 square yards), regular excavation (2,194 cubic yards), embankment work (815 cubic yards), and stabilization work (1,100 square yards). Bid security of 5% is required, with bids remaining firm for 90 days after opening. The procurement encourages participation from Minority and Women-owned Business Enterprises, though no specific set-aside percentages are designated. The contract will be awarded to the lowest responsive, responsible bidder by the Seminole County Board of County Commissioners based on qualifications, experience, and past performance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2024-03-14_S0989.1_Bid_Tab_(Phase_I).xlsx | XLSX spreadsheet | |
| Bid_Plans_2024-05-09_S0989.1_LMTL_(S&S).pdf | ||
| Bid_Plans_2024-05-09_S0989.1_LMTL_(S&S).pdf | ||
| CC-4508-24_pk.pdf | ||
| CC-4508-24_pka.pdf | ||
| CC-4508-24_pk.pdf | ||
| CC-4508-24_pka.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary of Pay Items
| Seminole County - Lake Monroe Loop Trail - Phase I |
| ENGINEERS OPINION OF PROBABLE COST |
| CPH Job No. S0989 - Construction Estimate For 100% Plans |
| FINANCIAL PROJECT ID: 444628-1-58-01 & 444628-2-62-01 - FPN: D522 084 B |
| MULTI-USE PATH | $0.00 | Close Comparative Pay Item Cost Reflected | ||||
| P.I. LINE NO. | FDOT PAY ITEM NO. | PAY ITEM DESCRIPTION | UNIT | QUANTITY |
| PLAN | FINAL | T5801 | T5814 | T5806 | ||||||||||
| 1 | 101 | 1 | MOBILIZATION (MATERIAL AND WORKMANSHIP BOND)(NFAP) | LS | 1 | 11.9% | 13.2% | 7.6% | ||||||
| 2 | 101 | 1 | MOBILIZATION (EXCLUDING MATERIAL AND WORKMANSHIP BOND) | LS | 1 | 11.9% | 13.2% | 7.6% | ||||||
| 3 | 102 | 1 | MAINTENANCE OF TRAFFIC | LS | 1 | 2.2% | 6.5% | 4.9% | ||||||
| 4 | 102 | 99 | PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY | ED | 150 | 0102 | 99 | 0102 99 | $10.00 | $10.00 | $10.50 | |||
| 5 | 104 | 10 | 3 | SEDIMENT BARRIER | LF | 9,727 | 0104 | 10 | 3 | 0104 10 3 | $1.50 | $24.65 | $10.25 | |
| 6 | 104 | 11 | FLOATING TURBIDITY BARRIER | LF | 100 | 0104 | 11 | 0104 11 | $5.00 | |||||
| 7 | 104 | 18 | INLET PROTECTION SYSTEM | EA | 25 | 0104 | 18 | 0104 18 | $125.00 | $168.96 | $175.00 | |||
| 8 | 110 | 1 | 1 | CLEARING & GRUBBING | AC | 3.7 | 0110 | 1 | 1 | 0110 1 1 | $3,453.00 | $71,724.00 | ||
| 9 | 110 | 4 | 10 | REMOVAL OF EXISTING CONCRETE | SY | 5,316 | 0110 | 4 | 10 | 0110 4 10 | $37.50 | $76.36 | $40.10 | |
| 10 | 110 | 7 | 1 | MAILBOX, F&I SINGLE | EA | 7 | 0110 | 7 | 1 | 0110 7 1 | ||||
| 11 | 120 | 1 | REGULAR EXCAVATION | CY | 2,194 | 0120 | 1 | 0120 1 | $50.00 | $439.77 | ||||
| 12 | 120 | 6 | EMBANKMENT | CY | 815 | 0120 | 6 | 0120 6 | $40.00 | $950.39 | ||||
| 13 | 160 | 4 | TYPE B STABILIZATION | SY | 1,100 | 0160 | 4 | 0160 4 | $18.50 | $41.45 | ||||
| 14 | 425 | 1 | 421 | INLETS, CURB, TYPE J-2, <10' | EA | 1 | 0425 | 1 | 421 | 0425 1 421 | ||||
| 15 | 425 | 1 | 521 | INLETS, DT BOT, TYPE C,<10' | EA | 2 | 0425 | 1 | 521 | 0425 1 521 | ||||
| 16 | 425 | 1 | 523 | INLETS, DT BOT, TYPE C, J-BOT, <10' | EA | 2 | 0425 | 1 | 523 | 0425 1 523 | ||||
| 17 | 425 | 1 | 525 | INLETS, DT BOT, TYPE C, PARTIAL | EA | 1 | 0425 | 1 | 525 | 0425 1 525 | ||||
| 18 | 425 | 2 | 71 | MANHOLES, J-7, <10' | EA | 1 | 0425 | 2 | 71 | 0425 2 71 | $16,500.00 | |||
| 19 | 425 | 2 | 91 | MANHOLES, J-8, <10' | EA | 2 | 0425 | 2 | 91 | 0425 2 91 | ||||
| 20 | 425 | 5 | 1 | MANHOLE, ADJUST, UTILITIES | EA | 6 | 0425 | 5 | 1 | 0425 5 1 | ||||
| 21 | 430 | 174 | 115 | PIPE CULVERT, OPTIONAL MATERIAL, ROUND, 15"SD | LF | 16 | 0430 | 174 | 115 | 0430174 115 | ||||
| 22 | 430 | 174 | 118 | PIPE CULVERT, OPTIONAL MATERIAL, ROUND, 18"SD | LF | 246 | 0430 | 174 | 118 | 0430174 118 | $210.00 | |||
| 23 | 430 | 174 | 124 | PIPE CULVERT, OPTIONAL MATERIAL, ROUND, 24"SD | LF | 29 | 0430 | 174 | 124 | 0430174 124 | $265.00 | |||
| 24 | 430 | 174 | 130 | PIPE CULVERT, OPTIONAL MATERIAL, ROUND, 30"SD | LF | 26 | 0430 | 174 | 130 | 0430174 130 | $306.00 | |||
| 25 | 430 | 175 | 215 | PIPE CULVERT, OPTIONAL MATERIAL, OTHER SHAPE - ELLIP/ARCH, 15"CD | LF | 100 | 0430 | 175 | 215 | 0430175 215 | $210.00 | |||
| 26 | 430 | 175 | 230 | PIPE CULVERT, OPTIONAL MATERIAL, OTHER SHAPE - ELLIP/ARCH, 30"SD | LF | 51 | 0430 | 175 | 230 | 0430175 230 | ||||
| 27 | 430 | 524 | 100 | STRAIGHT CONCRETE ENDWALLS, 24", SINGLE, 0 DEGREES, ROUND | EA | 1 | 0430 | 524 | 100 | 0430524 100 | ||||
| 28 | 430 | 530 | 100 | STRAIGHT CONCRETE ENDWALLS, 30", SINGLE, 0 DEGREES, ROUND | EA | 1 | 0430 | 530 | 100 | 0430530 100 | ||||
| 29 | 430 | 530 | 202 | STRAIGHT CONCRETE ENDWALLS, 30" EQUIV., DOUBLE, 0 DEGREES, ELLIPTICAL | EA | 1 | 0430 | 530 | 202 | 0430530 202 | ||||
| 30 | 515 | 1 | 2 | PIPE HANDRAIL - GUIDERAIL, ALUMINUM, 42" | LF | 189 | 0515 | 1 | 2 | 0515 1 2 | ||||
| 31 | 520 | 1 | 10 | CONCRETE CURB & GUTTER, TYPE F | LF | 2,696 | 0520 | 1 | 10 | 0520 1 10 | $49.50 | $58.60 | $46.00 | |
| 32 | 520 | 2 | 2 | CONCRETE CURB, TYPE B | LF | 1,078 | 0520 | 2 | 2 | 0520 2 2 | $45.00 | $57.77 | ||
| 33 | 520 | 3 | VALLEY GUTTER- CONCRETE | LF | 60 | 0520 | 3 | 0520 3 | ||||||
| 34 | 522 | 1 | CONCRETE, SIDEWALK AND TRAIL, 4" THICK | SY | 11,887 | 0522 | 1 | 0522 1 | $45.00 | $98.00 | ||||
| 35 | 522 | 1 | 1 | CONCRETE SIDEWALK & DRIVEWAYS, 4" THICK, FULL DEPTH RED DYE, STAMPED BRICK PATTERN | SY | 271 | 0522 | 1 | 1 | 0522 1 1 | ||||
| 36 | 522 | 2 | CONCRETE SIDEWALK & DRIVEWAYS, 6" THICK | SY | 3,792 | 0522 | 2 | 0522 2 | $65.00 | $141.90 | $127.00 | |||
| 37 | 522 | 5 | CONCRETE, 8"-12" THICK, REINFORCED (RAISED CROSSWALKS) | SY | 251 | 0522 | 5 | 0522 5 | ||||||
| 38 | 527 | 2 | DETECTABLE WARNINGS | SF | 724 | 0527 | 2 | 0527 2 | $35.00 | $33.33 | $52.00 | |||
| 39 | 530 | 74 | BEDDING STONE (VARIABLE THICKNESS, NO. 57 STONE) | TN | 22.6 | 0530 | 74 | 0530 74 | ||||||
| 40 | 570 | 1 | 2 | PERFORMANCE TURF, SOD | SY | 6,090 | 0570 | 1 | 2 | 0570 1 2 | $4.00 | $26.78 | $20.50 | |
| 41 | 635 | 2 | 30 | PULL & SPLICE BOX, INSTALL | EA | 10 | 0635 | 2 | 30 | 0635 2 30 | ||||
| 42 | 700 | 1 | 11 | SINGLE POST SIGN, F&I, GM, <12 SF | AS | 39 | 0700 | 1 | 11 | 0700 1 11 | $418.35 | $415.58 | $516.00 | |
| 43 | 700 | 1 | 50 | SINGLE POST SIGN, RELOCATE | AS | 27 | 0700 | 1 | $274.02 | $285.47 | $172.00 | |||
| 44 | 700 | 1 | 60 | SINGLE POST SIGN, REMOVE | AS | 2 | 0700 | 1 | 60 | 0700 1 60 | $31.54 | $45.54 | $34.50 | |
| 45 | 706 | 1 | 3 | RAISED PAVEMENT MARKERS | EA | 64 | 0706 | 1 | 3 | 0706 1 3 | $5.00 | $3.75 | $5.20 | |
| 46 | 710 | 90 | PAINTED PAVEMENT MARKINGS FINAL SURFACE | LS | 1 | 0710 | 90 | 0710 90 | - | - | ||||
| 710 | 11 | 170 | PAINTED PAVEMENT MARKINGS, STD, WHITE, ARROWS | EA | 24 | 0710 | 11 | 170 | 0710 11 170 | $50.00 | $26.00 | |||
| 710 | 11 | 200 | PAINTED PAVEMENT MARKINGS, STANDARD, YELLOW, SOLID, 4" | GM | 0.890 | 0710 | 11 | 200 | 0710 11 200 | $1,000.00 | $1,050.00 | |||
| 710 | 11 | 224 | PAINTED PAVEMENT MARKINGS, STANDARD, YELLOW, SOLID FOR DIAGONAL OR CHEVRON, 18" | LF | 90 | 0710 | 11 | 224 | 0710 11 224 | $1.20 | ||||
| 47 | 711 | 11 | 123 | THERMOPLASTIC, STANDARD, WHITE, SOLID, 12" FOR CROSSWALK AND ROUNDABOUT | LF | 365 | 0711 | 11 | 123 | 0711 11 123 | $3.50 | $2.99 | $4.65 | |
| 48 | 711 | 11 | 125 | THERMOPLASTIC, STANDARD, WHITE, SOLID, 24" FOR STOP LINE AND CROSSWALK | LF | 156 | 0711 | 11 | 125 | 0711 11 125 | $4.50 | $5.98 | $6.90 | |
| 49 | 711 | 11 | 170 | THERMOPLASTIC, STANDARD, WHITE, ARROW | EA | 2 | 0711 | 11 | 170 | 0711 11 170 | $85.00 | $69.00 | ||
| 50 | 711 | 11 | 224 | THERMOPLASTIC, STANDARD, YELLOW, SOLID, 18" FOR DIAGONAL OR CHEVRON | LF | 10 | 0711 | 11 | 224 | 0711 11 224 | $4.50 | $5.80 | ||
| 51 | 711 | 14 | 123 | THERMOPLASTIC, PREFORMED, WHITE, SOLID, 12" FOR CROSSWALK AND ROUNDABOUT | LF | 1,937 | 0711 | 14 | 123 | 0711 14 123 | ||||
| 52 | 711 | 14 | 125 | THERMOPLASTIC, PREFORMED, WHITE, SOLID, 24" FOR STOP LINE AND CROSSWALK | LF | 36 | 0711 | 14 | 125 | 0711 14 125 | $13.00 | $16.20 | ||
| 53 | 711 | 15 | 101 | THERMOPLASTIC, STANDARD-OPEN GRADED ASPHALT SURFACES WHITE, SOLID, 6" | GM | 0.143 | 0711 | 15 | 101 | 0711 15 101 | $5,700.00 | |||
| 54 | 711 | 15 | 201 | THERMOPLASTIC, STANDARD-OPEN GRADED ASPHALT SURFACES, YELLOW, SOLID, 6" | GM | 0.145 | 0711 | 15 | 201 | 0711 15 201 | $5,700.00 | |||
| 55 | 1080 | 21 | 106 | UTILITY FIXTURE, VALVE/METER BOX, FURNISH & INSTALL, 6" | EA | 14 | 1080 | 21 | 106 | 1080 21 106 | ||||
| 56 | 1080 | 21 | 500 | UTILITY FIXTURE, VALVE/METER BOX, ADJUST | EA | 33 | 1080 | 21 | 500 | 1080 21 500 | $1,000.00 |
&F Printed on &D at &T image1.jpeg
File details come from the government source that posted it. Updated .