About this file

This is a pay item worksheet for a construction project involving Palm Beach County and the Village of Palm Springs. The project, designated as Kirk Road Over LWDD L-11 Canal Culvert Replacement (PBC Project #2023502), is an annual structural contract (R2016-0308) that encompasses roadway reconstruction, utility infrastructure upgrades, and associated site work. The scope includes mobilization and maintenance of traffic, clearing and grubbing operations, extensive excavation and embankment work totaling approximately 2,132 cubic yards, asphalt milling and placement, concrete work including culvert installation and endwalls, riprap and bedding stone placement, guardrail installation, and performance turf installation. Utility work includes removal and replacement of water main infrastructure totaling approximately 305 linear feet of various diameter ductile iron pipe, installation of gate valves, fire hydrant assembly, and associated fittings. The project also incorporates contingency items for flowable fill, variable message signage, traffic control, storm sewer cleaning, and signage.

The pay item worksheet is presented in a blank bid proposal format with all unit prices and amounts currently shown as zero dollars, indicating this is a template for bidders to complete. The worksheet notes that the county does not guarantee accuracy of formulas and extensions, and that quantities listed shall govern over plans. Significant cost allocations for mobilization and maintenance of traffic are to be distributed across pay items rather than bid separately. Approximately 555 square yards of sod work, 35 square yards of base group work, and 3 tons of asphalt correspond to Village of Palm Springs aerial work. The project includes multiple special provisions requirements, including bypass pumping and dewatering costs, FDOT cast-in-place headwall shop drawings, and sod installation requirements per Section 575 of general provisions. Contingency items are subject to engineer authorization for increase, decrease, or deletion.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pay Item Worksheet

BID PROPOSAL
KIRK ROAD OVER LWDD L-11 CANAL CULVERT REPLACEMENT
ANNUAL STRUCTURAL CONTRACT R2016-0308
PBC PROJECT #2023502
#FDOT PAY ITEM NUMBERITEM DESCRIPTIONQTYUNITSUNIT PRICEAMOUNT
ROADWAY ITEMS
10101 1Mobilization (7%)1LS$ - 0
20102 1Maintenance of Traffic (incl. Pedestrian MOT) (7%)1LS$ - 0
30104 11Floating Turbidity Barrier28LF$ - 0
40110 1 1Clearing and Grubbing1LS$ - 0
50120 1Regular Excavation24CY$ - 0
60120 5Canal Excavation (Channel excavation)1,592CY$ - 0
70120 6Embankment (Compacted in Place)3CY$ - 0
8N/ACanal Embankment (Compacted in Place)537CY$ - 0
90160 4Type B Stabilization (LBR 40) (12")223SY$ - 0
100285706Optional Base Group 6 (8" Thick Coquina)116SY$ - 0
110285707Optional Base Group 7111SY$ - 0
120285708Optional Base Group 8108SY$ - 0
130327 70 1Milling Existing Asphalt Pavement, 1" Avg. Depth402SY$ - 0
140334 1 53Superpave Asphalt Concrete (Traffic Level C)19TN$ - 0
150337 7 82Asphalt Concrete Friction Course (FC-9.5) Rubber30TN$ - 0
160339 1Miscellaneous Asphalt Pavement5TN$ - 0
170400 4 1Class IV Concrete (Culverts/Endwalls)84CY$ - 0
180415 1 8Reinforcing Steel - Roadway6,000LB$ - 0
190425 2 72Manholes, J-7, Partial2EA$ - 0
20430175136Pipe Culvert, Optional Material, Round, 36"71LF$ - 0
21N/APrecast Concrete Box Culvert (6'Hx10'W)137LF$ - 0
220522 2Concrete Sidewalk, 6" Thick30SY$ - 0
230527 2Detectable Warnings36SF$ - 0
240530 3 3Riprap, Rubble, F&I, Bank & Shore718TN$ - 0
250530 74Bedding Stone420TN$ - 0
260536 1 0Guardrail - Roadway, General/Low Speed TL-2138LF$ - 0
270536 85 20Guardrail End Treatment - Trailing Achorage1EA$ - 0
280570 1 2Performance Turf, Sod2,255SY$ - 0
SUBTOTAL (ROADWAY)$ - 0
UTILITY ITEMS
291644900Removal of Existing Water Main & Fire Hydrant Assembly110LF$ - 0
301050 5121212" Flanged (FL) DIP Water Main40LF$ - 0
311050 5121212" Mechanical Joint (MJ) DIP Water Main (Restrained Joint)245LF$ - 0
321050 512066" Mechanical Joint (MJ) DIP Water Main (Restrained Joint)10LF$ - 0
331644300Fire Hydrant Assembly1EA$ - 0
341080 241066" Gate Valve1EA$ - 0
351080 2411212" Gate Valve2EA$ - 0
361080 2411212" Insert Valve1EA$ - 0
371080 32112Sample Point4EA$ - 0
381080 22101Fill and Flush Assembly2EA$ - 0
391080 261022" Air Release Valve1EA$ - 0
UTILITY FITTINGS, DUCTILE IRON FITTINGS$ - 0
401055 51108Utility Fittings, ductile iron/cast iron, furnish & install elbow, 6"1EA$ - 0
411055 51112Utility Fittings, ductile iron/cast iron, furnish & install elbow, 12"12EA$ - 0
421055 51912Utility Fittings, ductile iron/cast iron, furnish & install solid sleeve, 12"2EA$ - 0
431055 51308Utility Fittings, ductile iron/cast iron, furnish & install reducer, 8"x6"1EA$ - 0
441056 51312Utility Fittings, ductile iron/cast iron, furnish & install reducer, 12"x8"1EA$ - 0
451055 51212Utility Fittings, ductile iron/cast iron, furnish & install tee, 12"1EA$ - 0
461055 51512Utility Fittings, ductile iron/cast iron, furnish & install cap/plug, 12"1EA$ - 0
47N/AAerial Canal Crossing Piles, Cap, Fan Guard & rip-rap1LS$ - 0
SUBTOTAL (UTILITY)$ - 0
CONTINGENCY ITEMS
480121 70Flowable Fill100.00CY$ - 0
490922102 2Variable Message Sign (Non-MOT)10.00DAYS$ - 0
500102 14Traffic Control Officer (Non-MOT)24.00HR$ - 0
51N/AStorm Sewer Cleaning (Exist.) (>24" to 48")100.00LF$ - 0
520700 1 11Single Post Sign, F&I Ground Mount, Up to 12 SF2AS$ - 0
SUBTOTAL (CONTINGENCY)$ - 0
TOTAL BID$ - 0
THE COUNTY DOES NOT GUARANTEE THE ACCURACY OF THE FORMULAS AND EXTENSIONS USED IN THIS SPREADSHEET.
THE ITEMS AND QUANTITIES ABOVE, SHALL GOVERN OVER THE PLANS.
PAY ITEM FOOTNOTES IN CONSTRUCTION PLANS SHALL ALSO BE INCLUDED IN ITEM UNIT PRICE.
Item #FDOT Pay Item #PAY ITEM FOOTNOTES
All.AllAll items shall include cost to furnish and install unless otherwise noted.
All.AllCosts for bypass pumping and dewatering shall be in accordance with the special provisions provided by Palm Beach County.
1-2.see above.All costs for Maintenance of Traffic (MOT) and Mobilization shall be considered incidental to, and shall be included in, unit prices for pay items. 50% of the charges correspond to Village of Palm Springs aerial work
4.0110 1 1Costs for clearing and grubbing to include sawcut of existing asphalt or concrete designated for removal per the plans; the removal of existing pavement and sidewalk; the removal and relocation of privately owned systems such as irrigation, fencing, etc.; the removal/obliteration of any existing striping; the removal and relocation of any posts, signs, or trees; the removal of any storm structures or piping; the removal and disposal in suitable areas of excess and unsuitable material that may be encountered during excavation as directed by Palm Beach County; and the cutting, capping and removal of the FPL abandoned conduit.
5-8.see above.Berm/swale construction, re-grading of roadways, driveways, canal sections and all other rough & finish earthwork shall be considered incidental to the bid items "excavation" and "embankment".
90160 435 SY correspond to Village of Palm Springs aerial work
1228570835 SY correspond to Village of Palm Springs aerial work
13-16.see above.Sawcut & butt joint cost shall be incidental to asphalt item.
140334 1 533 TN correspond to Village of Palm Springs aerial work
13-16., 21.see above.Prime and tack coats are considered incidental to roadway and sidewalk construction.
17-18see above.FDOT cast-in-place headwall data table (index 400-289) must be completed by a delegate shop drawing engineer. See special provisions provided by Palm Beach County.
17-20.see above.Excavation and backfill for structures including cost of any select bedding material that may be necessary for a satisfactory installation as directed by Palm Beach County is considered incidental to the cost of the structures.
17-20.see above.The cost of breaking into existing structures is incidental to cost of pipe.
280570 1 2Sodding shall be in accordance with Section 575 of the General Provisions of this specification and shall include the costs for fertilizer and water until final acceptance. 555 SY of sod correspond to Village of Palm Spings aerial work
48-52N/AContingency items may be increased, decreased or deleted as directed by the engineer.