2023502 pay item worksheet.pdf

PDF 85 KB Posted

Attached to
Kirk Road Over LWDD L-11 Canal - Culvert Replacement
Solicitation number
IFB 360 2023502 1
Issued by
Palm Beach County, Florida

About this file

This is a pay item worksheet for a construction project managed by Palm Beach County, Florida, in partnership with the Village of Palm Springs, for the Kirk Road over LWDD L-11 Canal Culvert Replacement project under Annual Structural Contract R2016-0308 (PBC Project #2023502). The project encompasses roadway reconstruction, utility infrastructure work, and contingency items across multiple construction phases. Roadway work includes mobilization, maintenance of traffic, clearing and grubbing, excavation of approximately 1,592 cubic yards of canal material, embankment placement of 540 cubic yards, asphalt milling and repaving totaling over 400 square yards, concrete work including culverts and sidewalks, riprap installation of 718 tons, guardrail installation of 138 linear feet, and sod placement of 2,255 square yards. Utility work involves the removal and replacement of water mains totaling 305 linear feet of ductile iron pipe in various sizes, installation of gate valves, hydrant assemblies, and associated fittings, plus an aerial canal crossing structure. Contingency items include flowable fill, variable message signs, traffic control officers, and storm sewer cleaning.

The worksheet functions as a blank bid proposal form with no unit prices or amounts populated, allowing contractors to submit their pricing for each line item. Special provisions and footnotes indicate that costs for mobilization, maintenance of traffic, clearing and grubbing, dewatering, and bypass pumping are to be included within unit prices or considered incidental to related bid items. Approximately 50 percent of charges for certain aerial work items correspond to Village of Palm Springs participation in the project. The contractor is responsible for all associated work including site preparation, material handling, disposal of unsuitable materials, and final restoration. The document contains FDOT pay item numbers corresponding to Florida Department of Transportation standards, with quantities specified in various units including lump sum, linear feet, cubic yards, tons, square yards, and each. All costs for furnishing and installing materials and equipment are to be included in submitted unit prices unless explicitly noted otherwise.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROPOSAL FORM

# FDOT PAY

ITEM NUMBER ITEM DESCRIPTION QTY UNITS UNIT PRICE AMOUNT

ROADWAY ITEMS

1 0101 1 Mobilization (7%) 1 LS $ 2 0102 1 Maintenance of Traffic (incl. Pedestrian MOT) (7%) 1 LS $ 3 0104 11 Floating Turbidity Barrier 28 LF $ 4 0110 1 1 Clearing and Grubbing 1 LS $ 5 0120 1 Regular Excavation 24 CY $ 6 0120 5 Canal Excavation (Channel excavation) 1,592 CY $ 7 0120 6 Embankment (Compacted in Place) 3 CY $ 8 N/A Canal Embankment (Compacted in Place) 537 CY $ 9 0160 4 Type B Stabilization (LBR 40) (12") 223 SY $ 10 0285706 Optional Base Group 6 (8" Thick Coquina) 116 SY $ 11 0285707 Optional Base Group 7 111 SY $ 12 0285708 Optional Base Group 8 108 SY $ 13 0327 70 1 Milling Existing Asphalt Pavement, 1" Avg. Depth 402 SY $ 14 0334 1 53 Superpave Asphalt Concrete (Traffic Level C) 19 TN $ 15 0337 7 82 Asphalt Concrete Friction Course (FC-9.5) Rubber 30 TN $ 16 0339 1 Miscellaneous Asphalt Pavement 5 TN $ 17 0400 4 1 Class IV Concrete (Culverts/Endwalls) 84 CY $ 18 0415 1 8 Reinforcing Steel - Roadway 6,000 LB $ 19 0425 2 72 Manholes, J-7, Partial 2 EA $ 20 430175136 Pipe Culvert, Optional Material, Round, 36" 71 LF $ 21 N/A Precast Concrete Box Culvert (6'Hx10'W) 137 LF $ 22 0522 2 Concrete Sidewalk, 6" Thick 30 SY $ 23 0527 2 Detectable Warnings 36 SF $ 24 0530 3 3 Riprap, Rubble, F&I, Bank & Shore 718 TN $ 25 0530 74 Bedding Stone 420 TN $ 26 0536 1 0 Guardrail - Roadway, General/Low Speed TL-2 138 LF $ 27 0536 85 20 Guardrail End Treatment - Trailing Achorage 1 EA $ 28 0570 1 2 Performance Turf, Sod 2,255 SY $

SUBTOTAL (ROADWAY) $

UTILITY ITEMS

29 1644900 Removal of Existing Water Main & Fire Hydrant Assembly 110 LF $ 30 1050 51212 12" Flanged (FL) DIP Water Main 40 LF $ 31 1050 51212 12" Mechanical Joint (MJ) DIP Water Main (Restrained Joint) 245 LF $ 32 1050 51206 6" Mechanical Joint (MJ) DIP Water Main (Restrained Joint) 10 LF $ 33 1644300 Fire Hydrant Assembly 1 EA $ 34 1080 24106 6" Gate Valve 1 EA $ 35 1080 24112 12" Gate Valve 2 EA $ 36 1080 24112 12" Insert Valve 1 EA $ 37 1080 32112 Sample Point 4 EA $ 38 1080 22101 Fill and Flush Assembly 2 EA $ 39 1080 26102 2" Air Release Valve 1 EA $

UTILITY FITTINGS, DUCTILE IRON FITTINGS $

40 1055 51108 Utility Fittings, ductile iron/cast iron, furnish & install elbow, 6" 1 EA $ 41 1055 51112 Utility Fittings, ductile iron/cast iron, furnish & install elbow, 12" 12 EA $ 42 1055 51912 Utility Fittings, ductile iron/cast iron, furnish & install solid sleeve, 12" 2 EA $ 43 1055 51308 Utility Fittings, ductile iron/cast iron, furnish & install reducer, 8"x6" 1 EA $ 44 1056 51312 Utility Fittings, ductile iron/cast iron, furnish & install reducer, 12"x8" 1 EA $ 45 1055 51212 Utility Fittings, ductile iron/cast iron, furnish & install tee, 12" 1 EA $ 46 1055 51512 Utility Fittings, ductile iron/cast iron, furnish & install cap/plug, 12" 1 EA $ 47 N/A Aerial Canal Crossing Piles, Cap, Fan Guard & rip-rap 1 LS $

SUBTOTAL (UTILITY) $

CONTINGENCY ITEMS

48 0121 70 Flowable Fill 100.00 CY $ 49 0922102 2 Variable Message Sign (Non-MOT) 10.00 DAYS $ 50 0102 14 Traffic Control Officer (Non-MOT) 24.00 HR $ 51 N/A Storm Sewer Cleaning (Exist.) (>24" to 48") 100.00 LF $ 52 0700 1 11 Single Post Sign, F&I Ground Mount, Up to 12 SF 2 AS $

SUBTOTAL (CONTINGENCY) $

TOTAL BID $

BID PROPOSAL

KIRK ROAD OVER LWDD L-11 CANAL CULVERT REPLACEMENT

ANNUAL STRUCTURAL CONTRACT R2016-0308

PBC PROJECT #2023502

P-2

PROPOSAL FORM

# FDOT PAY

ITEM NUMBER ITEM DESCRIPTION QTY UNITS UNIT PRICE AMOUNT

BID PROPOSAL

KIRK ROAD OVER LWDD L-11 CANAL CULVERT REPLACEMENT

ANNUAL STRUCTURAL CONTRACT R2016-0308

PBC PROJECT #2023502

Item # FDOT Pay Item # All. All All. All

1-2. see above.

4. 0110 1 1

5-8. see above.

9 0160 4 35 SY correspond to Village of Palm Springs aerial work 12 285708 35 SY correspond to Village of Palm Springs aerial work

13-16. see above.

14 0334 1 53 3 TN correspond to Village of Palm Springs aerial work

13-16., 21. see above.

17-18 see above.

17-20. see above.

17-20. see above.

28 0570 1 2

48-52 N/A

THE COUNTY DOES NOT GUARANTEE THE ACCURACY OF THE FORMULAS AND EXTENSIONS USED IN THIS SPREADSHEET.

THE ITEMS AND QUANTITIES ABOVE, SHALL GOVERN OVER THE PLANS.

Contingency items may be increased, decreased or deleted as directed by the engineer.

Berm/swale construction, re-grading of roadways, driveways, canal sections and all other rough & finish earthwork shall be considered incidental to the bid items "excavation" and "embankment".

Sawcut & butt joint cost shall be incidental to asphalt item.

Prime and tack coats are considered incidental to roadway and sidewalk construction.

Costs for clearing and grubbing to include sawcut of existing asphalt or concrete designated for removal per the plans; the removal of existing pavement and sidewalk; the removal and relocation of privately owned systems such as irrigation, fencing, etc.; the removal/obliteration of any existing striping; the removal and relocation of any posts, signs, or trees; the removal of any storm structures or piping; the removal and disposal in suitable areas of excess and unsuitable material that may be encountered during excavation as directed by Palm Beach County; and the cutting, capping and removal of the FPL abandoned conduit.

Excavation and backfill for structures including cost of any select bedding material that may be necessary for a satisfactory installation as directed by Palm Beach County is considered incidental to the cost of the structures.

All costs for Maintenance of Traffic (MOT) and Mobilization shall be considered incidental to, and shall be included in, unit prices for pay items. 50% of the charges correspond to Village of Palm Springs aerial work

The cost of breaking into existing structures is incidental to cost of pipe.

Sodding shall be in accordance with Section 575 of the General Provisions of this specification and shall include the costs for fertilizer and water until final acceptance.

555 SY of sod correspond to Village of Palm Spings aerial work

PAY ITEM FOOTNOTES IN CONSTRUCTION PLANS SHALL ALSO BE INCLUDED IN ITEM UNIT PRICE.

PAY ITEM FOOTNOTES

All items shall include cost to furnish and install unless otherwise noted.

Costs for bypass pumping and dewatering shall be in accordance with the special provisions provided by Palm Beach County.

FDOT cast-in-place headwall data table (index 400-289) must be completed by a delegate shop drawing engineer. See special provisions provided by Palm Beach County.