2023200011_A2_Addendum_2.pdf
PDF 86 KB Posted
- Attached to
- RFQ 2023200011 Grit Channel Repairs
- Solicitation number
- S-KE0010-00004225
- Issued by
- Lane County, Oregon
About this file
This document is an Addendum #2 to the City of Eugene's Request for Quote (RFQ) #2023200011 for Grit Channel Repairs. The work involves concrete and expansion joint repairs to two grit channels at the City of Eugene Wastewater Treatment Plant. The addendum addresses questions and clarifications raised during the mandatory pre-bid meeting, including treatment of rebar repair, use of rust inhibitor, and the extent of epoxy coating repair. The addendum also provides a list of attendees from the mandatory pre-bid meeting.
The RFQ is for the State of Oregon, specifically the jurisdictions of Lane County and the City of Eugene. Interested bidders must submit proposals by the due date, and the successful contractor will be awarded the contract for the project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2023200011_E1_Response_Log_and_Abstract.xlsx | XLSX spreadsheet | |
| 2023200011_A2_Addendum_3.pdf | ||
| 2023200011_D1_PreClosing_Meeting.pdf | ||
| GSA Notice Draft Final~1.pdf | ||
| 2023200011_G3_Notice of Award.pdf | ||
| 2023200011_A1_Grit Channel Repairs_Updated.pdf | ||
| 2023200011_A2_Addendum_1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date: September 12, 2022
To: All Potential Offerors
From: Dori Palmer, Purchasing Analyst
Subject: City of Eugene Request for Quote #2023200011, Grit Channel Repairs
ADDENDUM #2
The solicitation referenced above is clarified/amended as follows:
1. Questions/clarifications from mandatory pre-bid meeting.
Q. For the rebar repair/concrete repair, since the rebar is so close to the surface, are we to build out the new patching mortar as to cover and give some depth for the new concrete repair?
A. No
Q. Should the repair be treated with a penetrating sealer/rust inhibitor?
A. Yes, treat repair with FerroGard 908
Q. What is the full extent of the epoxy coating repair.
A. For the alternate bid of Grit Channel #3.
Removal, repair and proper disposal of separating/failing coating approximately 240’ x 16” at the water line. Contractor to verify area and priced by the square foot. Repair with Duralkote 500 or approved equal that meets or exceeds per manufacturers recommendations.
Q. Would you accept like products of a substitution?
A. Yes, with prior approval. Products that meets or exceeds and approved for submersed applications
2. Provide list of attendees at Mandatory Pre-close Conference held on Thursday, September 8, 2022 at 10:00am.
Contact Person Business Name Phone E-mail
Dori Palmer
City of Eugene
541-682-8643 dpalmer@eugene-or.us
Mike McKay
541-682-8639 mmckay@eugene-or.gov
Barry Owen
541-682-8634 bowen@eugene-or.gov
Dan Flicker
Sawtooth
503-560-8559 dan@sawtoothcaulking.com mailto:dpalmer@eugene-or.us mailto:mmckay@eugene-or.gov mailto:bowen@eugene-or.gov mailto:dan@sawtoothcaulking.com
Wyatt Craig
Pacific Excavation
541-844-8681 wcraig@pacificexc.com
Mark Orr
Orr Inc.
503-743-1000
Bids@orrinc.us
Blaine Sanchez
Pullman Services
504-421-1229 bssanchez@pullman-services.com
Joel Diedrich
Contech Services Inc.
971-404-8168 j.diedrich@contechserviceswa.com
Questions regarding this Addendum or solicitation should be emailed to Dori Palmer, dpalmer@eugene-or.gov cc: Mike McKay RFQ File mailto:wcraig@pacificexc.com mailto:Bids@orrinc.us mailto:bssanchez@pullman-services.com mailto:j.diedrich@contechserviceswa.com mailto:dpalmer@eugene-or.gov
File details come from the government source that posted it. Updated .