2023_Farragut_McFee_Park_Dog_Park_and_Restroom_Construction__Preliminary_Component_Plan.pdf

PDF 1 MB Posted

Attached to
RFP#2025-14 McFee Park Prefabricated Public Restoom
Solicitation number
2025-14
Issued by
Knox County, Tennessee

About this file

The document is a Preliminary Component Plan for the 2023 Farragut Mayor Bob Leonard Park Athletic Field Renovations and ADA Access and McFee Park Dog Park and Restroom Construction, prepared by the Town of Farragut, Tennessee. The project encompasses multiple components, including a 1.2-acre dog park, an 11' x 10' ADA-compliant dog park, two ADA-compliant parking spaces, and an ADA-compliant restroom facility. The site plan details the construction of a prefabricated restroom building, accessible paths with a maximum 5% running slope, and specific grading and storm water management considerations. Phase 4 of the project is in the planning stage, with construction scheduled to begin in 2023.

The project is funded through the Tennessee Department of Environment and Conservation (TDEC) Local Parks & Recreation Fund (LPRF), with the Town of Farragut seeking pricing on two potential restroom structure options: a one-bathroom and a two-bathroom facility. The conceptual site plan shows detailed topographical information, including elevation markers, storm water management infrastructure, and precise measurements for various park elements. The design emphasizes accessibility, with ADA-compliant features throughout the park area, including paths, parking, and the dog park entrance. The restroom facility is designed as a prefabricated structure with specific architectural considerations to integrate with the park's landscape and meet accessibility requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

McFee Park Conceptual Site Plan

Project Title: 2023 Farragut Mayor Bob Leonard Park Field Renovation and McFee Park Dog Park Date: 1/26/2023 Time: 3:16:49 PM

PAVILION

HANDRAIL

CANVAS CANOPY

CONCRETE PAD W/

BASEMENT

RESIDENCE W/ FINISHED

1 STORY STONE & SIDING

GARAGE

DRIVEWAY

ASPHALT

R C

P

R C P

RCP

P

15" RCP

P

15" RCP

P

15" RCP

P

P

R C P

15"

RCP

DRAIN

AREA

DETENTION

POND

POND

CO

N C.

S

ID

EW

ALK

76'-5"

24'-10"

37'-1"

12'-2 2

1'

27.

30'

6'

STORM SEWER

RIM 922.69

BENCHMARK

920.0

FLOOR ELEVATION

925.1

FLOOR ELEVATION

925.1

FLOOR ELEVATION

918.6

DROP INLET

RAP

RIP-

RIP-RAP

RIP-RAP

RIP-RAP

TOP OF WATER

895.6

TC 915.6

TC 918.4

D

STORM SEWER

RIM 920.41

TC 921.0

D

TC 923.5

PB

TC 925.0

SEWER VALVE

SEWER VALVE

PB

H

Y D

3 9

MISC_AC UNIT

TC 926.3

D

STORM SEWER

RIM 926.71

PB

TC 927.3

PB

927.4

FLOOR ELEVATION

927.5

FLOOR ELEVATION

H

Y

D

PB

TC 933.2

H

IG

H

L

IN

E

TC 938.1

PB

PB

PB

H

Y

D

PB

FLOOR ELEVATION

942.5

942.5

FLOOR ELEVATION

942.6

FLOOR ELEVATION

PB

N

1-B

CB

1-C

CB

1-D

CB

1-E

CB

1-F

CB

1-6

CB

1-A

DI

NO. 1

STORM LINE

NO. 1

STORM LINE

NO. 1

STORM LINE

NO. 1

STORM LINE

NO. 1

STORM LINE

NO. 2

STORM LINE

NO. 2

STORM LINE

NO. 3

STORM LINE

NO. 3

STORM LINE

NO. 4

STORM LINE

NO. 4

STORM LINE

NO. 4

STORM LINE

NO. 4

STORM LINE NO. 5

STORM LINE

3-A

CB

3-B

CB

2-A

CB

2-B

CB

4-A

CB

4-B

CB

4-D

CB

4-C

CB

5-A

CB

CONSTRUCTION NOTES:

1.) SEE SHEETS C1.1 THRU C1.2 FOR DETAILED STORM WATER

DESIGN PLANS.

2.) SEE L SHEETS FOR HARDSCAPE AND GRADING.

NO. 6

STORM LINE NO. 6

STORM LINE

6-A

DI

6-B

DI

NO. 6

STORM LINE

NO. 6

STORM LINE

7-A

DI

NO. 6

STORM LINE

6-C

DI

6-D

DI

0 30 60 90

Dog Park Area (1.2 Acres)

Phase 4 Area is in the planning stage with construction beginning in 2023.

11' x 10'

ADA Dog Park Restrooms

ADA

Compliant

Access Area lcox Text Box S I T E L E G E N D

ADA COMPLIANT DOG PARK ACCESS AREA (CONSTRUCTION OF A 5,145 sq. ft. ADA ACCESSIBLE CONCRETE PAD ENTRANCE TO DOG PARK WITH ACCESSIBLE 8'W PATHS (<5% running slope, <2% cross slope) (FROM EACH ADA PARKING AREA)

DOG PARK (CONSTRUCTION OF 1.2 ACRES OF FENCED DOG PARK AREA )

ADA RESTROOM FACILITY (CONSTRUCTION AND INSTALLATION OF AN ADA COMPLIANT 11'4" x 10'8" PREFABRICATED RESTROOM BUILDING) lcox Ellipse lcox Ellipse lcox Ellipse lcox Text Box lcox Ellipse lcox Text Box lcox Text Box lcox Ellipse lcox Ellipse lcox Text Box lcox Text Box lcox Text Box lcox Ellipse lcox Text Box lcox Text Box lcox Text Box Preliminary Component Plan lcox Text Box Project Title: 2023 Farragut Mayor Bob Leonard Park Athletic Field Renovations and ADA Access and McFee Park Dog Park and Restroom Construction lcox Line lcox Line lcox Line lcox Line lcox Rectangle lcox Text Box 40'l x 8'w (<5% running slope, <2% cross slope)ADA Complaint Paths from parking area to Dog Park lcox Rectangle lcox Text Box 40'l x 8'w (<5% running slope, <2% cross slope)ADA Complaint Paths from parking area to Dog Park lcox Line lcox Line lcox Rectangle lcox Text Box 2 ADA Complaint Parking Spaces lcox Line lcox Rectangle lcox Text Box 2 ADA Complaint Parking Spaces

File details come from the government source that posted it. Updated .