2023-05-04_I5 MP 234 Grind and Pave Ramps_Signed.pdf

PDF 3 MB Posted

Attached to
R2 Paving RFB - I5 MP 234 Grind and Pave Ramps
Solicitation number
S-73000-00007571
Issued by
Lake County, Albany City, Oregon

About this file

This document is the technical specifications and plans for the "I5 MP 234 Grind and Pave Ramps" project, which is being managed by the Oregon Department of Transportation (ODOT). The project involves grinding and repaving the on and off ramps at Interstate 5 milepost 234 in Linn County, Oregon. The work includes 11,830 square yards of grinding, 1,670 tons of asphalt concrete paving, and 12,400 linear feet of striping. The paving limits are constrained by the existing concrete and asphalt joints. Temporary lane markings will be installed immediately after paving until the final striping is completed.

The related state and local contract opportunity is a request for bids under the On-Call Region 2 Paving Price Agreement series, which is open only to current price agreement holders in the jurisdictions of Marion County and the City of Salem, Oregon. No other pricing or funding details are provided.

View the file

Other files

File Type Posted
00007571_RFB.xlsx XLSX spreadsheet
35693 City of Rockaway Beach Path Mini_RFP Posted.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THIS IS THE FILENAME LOCATION: \\WPDOTFILL20\R_VMP13_USERS\HWYR20G\_PROJECTS\D4\PAVING\I5 MP 234 GRIND AND PAVE RAMPS\_CAD\I5 MP 234 GRIND AND PAVE RAMPS_PLANS.DWG 2-May-2023 13:40 HWYR20G

OREGON DEPARTMENT

OF TRANSPORTATION

Checker:Drafter:

Designer:

SHEET NO.

COUNTY Reviewer:

FINAL ELECTRONIC DOCUMENT

AVAILABLE UPON REQUEST

I5 MP 234 GRIND AND PAVE RAMPS

PACIFIC HIGHWAY

LINN COUNTYHWY:

M.P.:

DATE

234.25

LINN

05/23 A01

Mike Metz

Mike Metz

Cody Stone

Cody Stone

O R

EG

ON

DE PAR TMEN

T

O F

T

RAN S P OR T A T I ON

OREGON

EXPIRES: 06-30-2024

99533PERE

GISTERED PROFESSIONALENGINEER

MARCH 08, 2022CODY G. STONE

PROJECT OVERVIEW

2 12 INCH CPPR (TYP)

2 12 INCHES OF LEVEL 3, 12" DENSE ACP

(TYP)

EXISTING STRIPING COLOR, WIDTH, AND LAYOUT

TO BE DOCUMENTED BY THE CONTRACTOR

BEFORE GRINDING AND PAVING WORK BEGINS.

ONCE PAVING IS COMPLETE, THE CONTRACTOR

SHALL REPRODUCE THE EXISTING STRIPING (TYP)

INTERSTATE 5 NB

INTERSTATE 5 SB

NB ON RAMP EXIT 234

SB OFF RAMP EXIT 234

ESTIMATED QUANTITIES:

11,830 TOTAL SQYD OF GRINDING

1,670 TONS ACP

12,400 LF OF STRIPING

PAVING BOUNDARY IS

EXISTING ACP JOINT

PAVING BOUNDARY IS

EXISTING ACP JOINT

PAVING BOUNDARIE TO BE NEWLY

CREATED PAVEMENT JOINT FROM

ADJACENT PROJECT OR PAINTED IN

THE FIELD BY ODOT

KN

O

X

BU

TT

E

R D

. E

ALBANY

PAVING LIMITS ARE ONE FOOT

OUTSIDE OF PAINT (TYP)

WHEN PAVING ALONG

CENTERLINE, LIMITS ARE

JUST OUTSIDE THE PAINT

PAVING LIMITS ARE

CONSTRAINED BY

CONCRETE/ACP JOINT

PAVING LIMITS ARE

CONSTRAINED BY

CONCRETE/ACP JOINT

HWYR20G

Text Box

HWYR20G

Text Box

BOUNDARY

HWYR20G

Text Box TEMPORARY LANE MARKINGS TO BE IN PLACE IMMEDIATLY AFTER PAVING UNTIL PAINTING IS INSTALLED (TYP) https://secure.na3.documents.adobe.com/verifier?tx=CBJCHBCAABAAkkdCyyXpYtHqYPajt5DFmaCl_OxZCivW

Sheets and Views
1 VIEW (22x34)