About this file
This document is the technical specifications and plans for the "I5 MP 234 Grind and Pave Ramps" project, which is being managed by the Oregon Department of Transportation (ODOT). The project involves grinding and repaving the on and off ramps at Interstate 5 milepost 234 in Linn County, Oregon. The work includes 11,830 square yards of grinding, 1,670 tons of asphalt concrete paving, and 12,400 linear feet of striping. The paving limits are constrained by the existing concrete and asphalt joints. Temporary lane markings will be installed immediately after paving until the final striping is completed.
The related state and local contract opportunity is a request for bids under the On-Call Region 2 Paving Price Agreement series, which is open only to current price agreement holders in the jurisdictions of Marion County and the City of Salem, Oregon. No other pricing or funding details are provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00007571_RFB.xlsx | XLSX spreadsheet | |
| 35693 City of Rockaway Beach Path Mini_RFP Posted.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THIS IS THE FILENAME LOCATION: \\WPDOTFILL20\R_VMP13_USERS\HWYR20G\_PROJECTS\D4\PAVING\I5 MP 234 GRIND AND PAVE RAMPS\_CAD\I5 MP 234 GRIND AND PAVE RAMPS_PLANS.DWG 2-May-2023 13:40 HWYR20G
OREGON DEPARTMENT
OF TRANSPORTATION
Checker:Drafter:
Designer:
SHEET NO.
COUNTY Reviewer:
FINAL ELECTRONIC DOCUMENT
AVAILABLE UPON REQUEST
I5 MP 234 GRIND AND PAVE RAMPS
PACIFIC HIGHWAY
LINN COUNTYHWY:
M.P.:
DATE
234.25
LINN
05/23 A01
Mike Metz
Mike Metz
Cody Stone
Cody Stone
O R
EG
ON
DE PAR TMEN
T
O F
T
RAN S P OR T A T I ON
OREGON
EXPIRES: 06-30-2024
99533PERE
GISTERED PROFESSIONALENGINEER
MARCH 08, 2022CODY G. STONE
PROJECT OVERVIEW
2 12 INCH CPPR (TYP)
2 12 INCHES OF LEVEL 3, 12" DENSE ACP
(TYP)
EXISTING STRIPING COLOR, WIDTH, AND LAYOUT
TO BE DOCUMENTED BY THE CONTRACTOR
BEFORE GRINDING AND PAVING WORK BEGINS.
ONCE PAVING IS COMPLETE, THE CONTRACTOR
SHALL REPRODUCE THE EXISTING STRIPING (TYP)
INTERSTATE 5 NB
INTERSTATE 5 SB
NB ON RAMP EXIT 234
SB OFF RAMP EXIT 234
ESTIMATED QUANTITIES:
11,830 TOTAL SQYD OF GRINDING
1,670 TONS ACP
12,400 LF OF STRIPING
PAVING BOUNDARY IS
EXISTING ACP JOINT
PAVING BOUNDARY IS
EXISTING ACP JOINT
PAVING BOUNDARIE TO BE NEWLY
CREATED PAVEMENT JOINT FROM
ADJACENT PROJECT OR PAINTED IN
THE FIELD BY ODOT
KN
O
X
BU
TT
E
R D
. E
ALBANY
PAVING LIMITS ARE ONE FOOT
OUTSIDE OF PAINT (TYP)
WHEN PAVING ALONG
CENTERLINE, LIMITS ARE
JUST OUTSIDE THE PAINT
PAVING LIMITS ARE
CONSTRAINED BY
CONCRETE/ACP JOINT
PAVING LIMITS ARE
CONSTRAINED BY
CONCRETE/ACP JOINT
HWYR20G
Text Box
HWYR20G
Text Box
BOUNDARY
HWYR20G
Text Box TEMPORARY LANE MARKINGS TO BE IN PLACE IMMEDIATLY AFTER PAVING UNTIL PAINTING IS INSTALLED (TYP) https://secure.na3.documents.adobe.com/verifier?tx=CBJCHBCAABAAkkdCyyXpYtHqYPajt5DFmaCl_OxZCivW
| Sheets and Views |
| 1 VIEW (22x34) |
| 2023-07-12T13:22:04-0700 | |
| Agreement certified by Adobe Acrobat Sign |