2022604.5 Pay Item Worksheet_06_04_2026.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- Jupiter Plantation Ditch Pipe Replacement
- Solicitation number
- IFB 360 2022604 1
- Issued by
- Palm Beach County, Florida
About this file
This is a Pay Item Worksheet for the Jupiter Plantation Ditch Pipe Replacement project (PBC Project #2022604) in Florida, serving as the bid proposal documentation for the construction contract. The project encompasses roadway items, structural pay items, and contingency items totaling approximately 29 line items. Roadway work includes mobilization, maintenance of traffic, clearing and grubbing, regular excavation (50 cubic yards), pipe culvert installation (196 linear feet of 48" RCP), rip-rap placement, fencing installation (60 linear feet), performance turf sodding (771 square yards), and storm sewer pumping operations. Structural pay items include settlement and vibration monitoring of existing structures, reinforced steel installation for retaining walls (1,062 pounds), auger grouted piles (265 linear feet of 18" diameter), concrete work across multiple classes totaling 30 cubic yards, riprap rubble ditch lining (110 tons), bedding stone (21 tons), duck bill check valves, and manatee grates. Contingency items provide flexibility for additional excavation (200 cubic yards), flowable fill (15 cubic yards), miscellaneous concrete (10 cubic yards), fence resetting (200 linear feet), storm sewer cleaning, and tree/palm relocation work.
The worksheet presents all pay items with quantities and unit pricing fields, though specific unit prices and contract amounts are listed as zero dollars on this template document, indicating this is a blank bid form awaiting contractor pricing submissions. No specific response dates, due dates, site visit requirements, or bidders' conference information is detailed in this particular worksheet. The document serves as the standardized pricing schedule that bidders must complete and submit as part of their formal bid proposals for the Jupiter Plantation Ditch Pipe Replacement project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2022604.500
| BID PROPOSAL | ||||||
| JUPITER PLANTATION DITCH PIPE REPLACEMENT | ||||||
| CONTRACT | ||||||
| PBC PROJECT # 2022604 | ||||||
| # | FDOT ITEM NUMBER | ITEM DESCRIPTION | QTY. | UNITS | UNIT PRICE | AMOUNT |
| ROADWAY ITEMS | ||||||
| 1 | 101-1 | MOBILIZATION | 1 | LS | $ - 0 | |
| 2 | 102-1 | MAINTENANCE OF TRAFFIC(INCL. PEDESTRIAN MOT) | 1 | LS | $ - 0 | |
| 3 | 104-11 | FLOATING TURBIDITY BARRIER | 152 | LF | $ - 0 | |
| 4 | 110-11-1 | CLEARING AND GRUBBING | 1 | LS | $ - 0 | |
| 5 | 120-1 | REGULAR EXCAVATION | 50 | CY | $ - 0 | |
| 6 | 120-6 | EMBANKMENT (COMPACTED IN PLACE) | 12 | CY | $ - 0 | |
| 7 | N/A | PIPE CULVERT (48" RCP) | 196 | LF | $ - 0 | |
| 8 | 530-1100 | RIP-RAP, SAND-CEMENT BAGS | 15 | CY | $ - 0 | |
| 9 | 550-10220 | FENCING, TYPE B, STANDARD (6' HIGH) | 60 | LF | $ - 0 | |
| 10 | 570-1-2 | PERFORMANCE TURF, SOD | 771 | SY | $ - 0 | |
| 11 | 0430-94-3 | STORM SEWER PUMPING (EXIST)(>24' TO 48")(SEE SP'S) | 8 | LF | $ - 0 | |
| SUBTOTAL (ROADWAY) | $ - 0 |
| STRUCTURAL PAY ITEMS | |||||
| 12 | 108-1 | MONITORING EXISTING STRUCTURE-SETTLEMENT MONITORING | 1 | LS | $ - 0 |
| 13 | 108-2 | MONITORING EXISTING STRUCTURE-VIBRATION MONITORING | 1 | LS | $ - 0 |
| 14 | 415-1-3 | REINF STEEL, RETAINING WALL | 1062 | LB | $ - 0 |
| 15 | 455-112-18 | AUGER GROUTED PILE 18" DIAMETER | 265 | LF | $ - 0 |
| 16 | 400-1-30 | CONCRTE CLASS I, SEAL | 10 | CY | $ - 0 |
| 17 | 120-72 | GRAVEL FILL | 17 | CY | $ - 0 |
| 18 | 530-3-4 | RIPRAP RUBBLE DITCH LINING | 110 | TN | $ - 0 |
| 19 | 530-74 | BEDDING STONE | 21 | TN | $ - 0 |
| 20 | 400-4-11 | CONCRETE CLASS IV RETAINING WALL | 10 | CY | $ - 0 |
| 21 | 430-880-48 | DUCK BILL CHECK VALVE | 1 | EA | $ - 0 |
| 22 | 430-886-48 | MANATEE GRATE, FIXED, NON-HINGED, INSIDE PIPE | 1 | EA | $ - 0 |
| 23 | 120-5 | EXCAVATION FOR RIP-RAP AND ENDWALL | 125 | CY | $ - 0 |
| SUBTOTAL (ROADWAY) | $ - 0 |
| CONTINGENCY ITEMS | |||||
| 24 | 120-1 | REGULAR EXCAVATION | 200 | CY | $ - 0 |
| 25 | 121-70 | FLOWABLE FILL | 15 | CY | $ - 0 |
| 26 | 400-1-15 | CLASS 1 CONCRETE (MISCELLANEOUS) | 10 | CY | $ - 0 |
| 27 | N/A | RESETTING FENCE (SEE SP'S) | 200 | LF | $ - 0 |
| 28 | 0430-94-3 | STORM SEWER CLEANING (EXIST)(>24" TO 48")(SEE SP'S) | 8 | LF | $ - 0 |
| 29 | 0581-1-7 | RELOCATE TREES, PALMS, <14' OF CLEAR TRUNK, SABAL PALM ONLY | 2 | EA | $ - 0 |
| 30 | 0522-1 | 4" CONCRETE SIDEWALK AND DRIVEWAYS | 40 | SY | $ - 0 |
| 31 | 570-1-2 | PERFORMANCE TURF, SOD | 3500 | SY | $ - 0 |
| SUBTOTAL (CONTINGENCY ITEMS) | $ - 0 | ||||
| TOTAL BID | $ - 0 |
| THE COUNTY DOES NOT GUARANTEE THE ACCURACY OF THE FORMULAS AND EXTENSIONS USED IN THIS SPREADSHEET. | ||
| THE ITEMS AND QUANTITIES ABOVE, SHALL GOVERN OVER THE PLANS. | ||
| PAY ITEM FOOTNOTES IN CONSTRUCTION PLANS SHALL ALSO BE INCLUDED IN ITEM UNIT PRICE. | ||
| Note # | FDOT Item # | PAY ITEM FOOTNOTES |
| 1 | All | All items shall include cost to furnish and install unless otherwise noted. |
| 2 | All | FDOT Item numbers are for use in determining eligibility for price adjustment per General Provision 9-2 only. |
| 3 | All | All pay items to adhere to the FDOT Standard Plans (FY 2024 - 2025) and Palm Beach County construction standards. See project technical specifications for further measurement and payment provisions. |
&"Times New Roman,Bold"&12PROPOSAL FORM
&"Times New Roman,Bold"&12P-&P