About this file

This document contains responses to questions from vendors regarding a solicitation for the installation of high mast lighting. The International Boundary and Water Commission is seeking proposals to install high mast lighting at the American Dam Field Office in El Paso, Texas in accordance with the attached Statement of Work. Vendors asked questions about requirements for lights on poles, bollards, surveying pole locations, lightning protection, fencing removal, light specifications, 3-phase power systems, contractor/photocell requirements, and design specifications. The contracting officer provided responses to clarify that poles must provide 250 feet of illumination coverage, adjustments can be made to pole locations if needed, fencing may need to be removed and replaced on the west side of the dam, and vendors are responsible for meeting the illumination criteria and removing materials from the work site. No changes will be made to vendor recommendations after award. Proposals are still due by the original due date.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

A00002

Carmella L. Speer, Contracting Officer

The purpose of amendment A00002 is to provide responses to RFIs:

The due date of proposals remains unchanged.

US Section, International Boundary and Water Commission 4191 N. Mesa Street El Paso, TX 79902

20224361034

20224361034

1 3

02/24/2022

02/07/2022

Responses to RFIs

Question: Will there be a red light on top of each pole?

Response: Unknown, however, it is believed that it would be required but dependent upon the height of the poles.

Question: On the road with the lights, will bollards be required around them? Please provide info.

Response: Yes.

Question: Can a more accurate survey be completed for the pole location? We are afraid of putting a pole in a spot and being 50ft or so off from what imagined.

Response: Adjustments can be made if necessary and this shouldn’t be an issue.

Question: Will the poles require lighting protection?

Response: I assume you meant lightening and they should be grounded to prevent damage from a lightning strike.

Question: There is a slight issue when removing the existing fence, it will be a bit defenseless. ACG thinks that completing this work in sections within the day would be the best solution.

Is this acceptable?

Response: You shouldn’t have to move any fencing to install the poles on the island. The only location that MAY require the removal and reinstallation of fencing is on the west side of the dam structure.

Question: There are no specs on the lights or the height of the pole. Can this be provided? ACG can propose what could be a solution but would not want this recommendation to be changed after awarded.

Response: We specified the area to be covered (250’) for each of the poles. We did not provide the specs for the lighting because it is up to the vendor to ensure the lights installed meet the requirements we have stated.

Question: A 3-phase system will save money on the utility bill but may cost more upfront. Is this acceptable?

Response: Maybe provide the difference in cost in your proposal.

Question: Do the lights require contractor/photocell?

Response: Yes.

Question: Who will be in charge of removing all the material on that dirt path during construction?

Response: This is the responsibility of the vendor.

Question: Is there a bases of design to reference?

Response: We did not provide the design specifications because the criteria is stated in Paragraph VIII A 4 of the SOW. It is up to the vendor to ensure their installation meets the stated requirement below. 250” covers the area we want illuminated.

Question: Would you happen to know the High Mast lighting fixture specifications for this project?

Response: Each new installed lighting system must be able to provide light across a minimum of 250’ around the installation point. The poles must be high enough to meet the minimum illumination distance from the installation point.