21-090-01

OLD SCHOOLHOUSE

400 C STREET

BEAVER, ALASKA

LIMITED HAZARDOUS BUILDING MATERIALS INVENTORY

AUGUST 2022

Submitted to: Theresa Clark

Tasha Mockta Yukon River Inter-Tribal Watershed Council 725 Christensen Drive Suite 3 Anchorage, AK 99501

Submitted by: BGES, INC.

1042 East 6th Avenue Anchorage, Alaska 99501 Phone: (907) 644-2900

WWW.BGESINC.COM

BGES, Inc.

Beaver Old Schoolhouse Page i 21-090-01 Beaver, AK; Limited HBMI

TABLE OF CONTENTS

1.0 INTRODUCTION

2.0 SITE DESCRIPTION AND SAMPLING TECHNIQUES

3.0 ACBM AND LBP SAMPLING AND ASSESSMENT

3.1 Description of Assessment

3.2 PLM and XRF Analytical Techniques

4.0 RESULTS

4.1 XRF Analysis Results

4.2 PLM Analytical Results

5.0 APPLICABLE REGULATIONS AND GUIDELINES

5.1 Lead-Based Paint For Federally Owned Or Assisted Housing (Sections 1012 & 1013)

5.2 U.S. EPA’s Renovation, Repair, & Painting (RRP) Rule (40 CFR 745 Subpart E)

5.3 US EPA NESHAP Regulations

5.4 OSHA Regulations CFR 1910 And 1926

6.0 CONCLUSIONS AND RECOMMENDATIONS

LIST OF TABLES (at end of report)

TABLE 1 Positive XRF Readings and Locations

TABLE 2 “Positive” ACM Sample Locations and Results

LIST OF FIGURES (at end of report)

FIGURE 1 PACBM and Positive XRF Reading Locations (1st Floor)

FIGURE 2 PACBM and Positive XRF Reading Locations (2nd Floor)

FIGURE 3 PACBM and Positive XRF Reading Locations (Outbuildings and Sheds)

LIST OF APPENDICES

APPENDIX A Site Photographs

APPENDIX B XRF & PLM Analytical Data

APPENDIX C BGES’ Personnel Certifications

Beaver Old Schoolhouse Page 1 of 8 21-090-01 Beaver, AK; Limited HBMI

1.0 INTRODUCTION

BGES, Inc. (BGES) was retained by the Yukon River Inter-Tribal Watershed Council (YRITWC) to conduct a limited Hazardous Building Materials Inventory (HBMI) of the buildings located at 400 C Street in Beaver, Alaska (hereafter referred to as the “subject property”). The purpose of this assessment was to evaluate the potential presence of hazardous building materials, such as lead-based paint (LBP) and asbestos-containing building materials (ACBM), within the buildings on the subject property.

Photographs of the subject property, and selected sampling/testing locations at the subject property, are included in Appendix A.

This report presents the results of our findings. The presence of LBP was evaluated using an x-ray fluorescence (XRF) field screening instrument, and asbestos was evaluated by collecting samples of potential ACBM (PACBM) and submitting this material to an accredited laboratory for analysis. LBP data and asbestos laboratory results are included in Appendix B.

The limited HBMI was performed during May of 2022. The inspections were performed by Carson Kent, Environmental Scientist II of BGES. Mr. Kent is an AHERA-Certified Building Inspector (Certificate #

TBI24-220-13779) and a United States (U.S.) Environmental Protection Agency (EPA)-Certified Risk

Assessor (Cerificate # LBP-R-I219617-1). Copies of BGES’ certificates are included in Appendix C.

A total of 195 XRF readings were taken from all identified different testing combinations in the inspected areas of the buildings on the subject property from interior and exterior portions of the structures. Testing combinations are comprised of rooms (or room equivalents), building components, and substrates. Thirty-two of the readings, taken from walls and ceilings; porch components; window components within one bedroom, the outbuildings, and within the attic; and exterior doors located on the south side of the building and on the outbuildings, exceeded the EPA regulatory limit of 1.0 milligram (mg) of lead per square centimeter (cm2), or 1.0 mg/cm2.

A total of 92 bulk samples (39 samples with 53 additional layers) were collected from PACBM identified in the inspected areas/locations at the property. The samples were sent to an accredited laboratory and were analyzed using Polarized Light Microscopy (PLM), in accordance with EPA Method 600/R-93/116.

According to the National Emissions Standard for Hazardous Air Pollutants (NESHAP), Asbestos-

Containing Materials (ACMs) are defined as containing at least 1 percent asbestos including, but not limited to, chrysotile, amosite, tremolite, actinolite, and crocidolite asbestos. Samples were collected from wall material, insulation, ceiling material, resilient flooring material, carpet mastic, joint compound, and cove base molding and mastic. Twenty-one of the sample layers collected in the buildings on the subject

Beaver Old Schoolhouse Page 2 of 8 21-090-01 Beaver, AK; Limited HBMI property, from linoleum located within the foyer, hallway, kitchen, bathroom, classrooms, housing kitchen, and bedroom closet; from mastic located on the foyer floor, hallway transition strip, hallway floor, and kitchen cabinets; and from joint compound used throughout the building were found to be “asbestos-containing” according to the NESHAP definition, and the remaining samples were not found to be

“asbestos-containing” according to the NESHAP definition.

Applicable regulations regarding the abatement and disposal of ACM and LBP are described in Section 5.

XRF data and laboratory analytical data pertaining to the PACBM samples are included in Appendix B.

2.0 SITE DESCRIPTION AND SAMPLING TECHNIQUES

The subject property contains a two-story building, currently not in use but used historically as a schoolhouse and as a elder center, which totals approximately 6,000 square feet in size. The building, containing two classrooms, a kitchen, an office, a shower room, a restroom, and several closets as well as an attic and a living space comprising of two bedrooms, a dedicated bathroom, and a combined kitchen/living room was inspected for the presence of LBP and asbestos. Lead sampling was performed by utilizing a Heuresis Pb200i XRF Lead Analyzer to test for the presence of lead in selected painted surfaces. This was accomplished in general accordance with established Department of Housing and

Urban Development (HUD) & EPA guidelines. Sampling of building materials for asbestos content analysis was conducted by removing a small sample of the suspected material, including all associated substrates, with a hammer and chisel. The samples were then placed into sealable plastic bags and sealed for shipment to the laboratory. Samples for laboratory analysis were clearly labeled and submitted to the laboratory under chain of custody protocol.

3.0 ACBM AND LBP SAMPLING AND ASSESSMENT

3.1 Description of Assessment

The LBP and PACBM assessments were conducted on May 11, 2022. The walkthrough assessment included a visual inspection of the buildings and collection of LBP data and PACBM samples. This inspection included the collection of building materials such as wall material, insulation, ceiling material, resilient flooring material, carpet mastic, joint compound, cove base molding and mastic.

3.2 PLM and XRF Analytical Techniques

Painted surfaces were analyzed using a Heuresis Pb200i XRF Lead Analyzer. For a complete description of the XRF testing method, please refer to the 1997 HUD Inspection Protocol.

Beaver Old Schoolhouse Page 3 of 8 21-090-01 Beaver, AK; Limited HBMI

PACBM representative bulk samples collected during our inspection activities were analyzed for asbestos content by EMSL Analytical, Inc., a laboratory accredited by the National Institute of Standards and

Technology (NIST), and approved by the National Voluntary Laboratory Accreditation Program

(NVLAP). For a complete description of the PLM method, please refer to EPA Method 600/R-93/116 and

Title 40 Code of Federal Regulations (CFR) Part 763 Appendix A to Subpart E, Section 1.

4.0 RESULTS

The results of the XRF analyses of painted surfaces and PLM analyses of PACBMs are listed below.

4.1 XRF Analysis Results

A total of 195 XRF readings were taken from all identified different testing combinations in the inspected areas of the buildings on the subject property from interior and exterior portions of the structures. Testing combinations are comprised of rooms (or room equivalents), building components, and substrates. Thirty-two of the readings, taken from walls and ceilings; porch components; window components within one bedroom, the outbuildings, and within the attic; and exterior doors located on the south side of the building and on the outbuildings (Photographs 1 through 32 in Appendix A), exceeded the EPA regulatory limit of

1.0 mg/cm2.

Positive XRF reading locations are depicted on Figures 1, 2, and 3 and XRF analytical data are summarized in Table 1.

4.2 PLM Analytical Results

A total of 92 bulk samples (39 samples with 53 additional layers) were collected from PACBM identified in the inspected portions of the buildings on the subject property. Each sample was analyzed by EPA

Method 600/R-93/116. As described above, according to the NESHAP, ACMs are defined as containing at least 1 percent asbestos. Samples were collected from wall material, insulation, ceiling material, resilient flooring material, carpet mastic, joint compound, cove base molding, and mastic. Twenty-one of the sample layers collected in the buildings on the subject property were found to be “asbestos-containing” according to the NESHAP definition, and the remaining samples were not found to be “asbestos-containing” according to the NESHAP definition.

The 21 samples found to be “asbestos-containing” according to the NESHAP definition were from linoleum located within the foyer, hallway, kitchen, bathroom, classrooms, housing kitchen, and bedroom closet; from mastic located on the foyer floor, hallway transition strip, hallway floor, and kitchen cabinets;

and from joint compound used throughout the building (Photographs 33 through 51 in Appendix A).

Beaver Old Schoolhouse Page 4 of 8 21-090-01 Beaver, AK; Limited HBMI

PACBM sample locations are depicted on Figures 1, 2, and 3 and PLM analytical data are summarized in

Table 2.

5.0 APPLICABLE REGULATIONS AND GUIDELINES

5.1 Lead-Based Paint For Federally Owned Or Assisted Housing (Sections 1012 & 1013)

On September 15, 1999, HUD published final regulations to implement Sections 1012 & 1013 of Title X, which set forth specific policies on LBP hazard reduction in federally assisted and federally owned housing

(24 CFR Part 35 — Requirement for Notification, Evaluation and Reduction of Lead-Based Paint Hazard in Housing Receiving Federal Assistance). This rule is a comprehensive amendment of previous federal housing LBP regulations and consolidates HUD LBP requirements into one part of the CFR. HUD guidelines are applicable for a dwelling that contains LBP at 1.0 mg/cm2 or more. In most cases, HUD guidelines also require disclosure of the presence of LBP in building materials to any future tenants or owners of the property.

5.2 U.S. EPA’s Renovation, Repair, & Painting (RRP) Rule (40 CFR 745 Subpart E)

Between 2008 and 2013, the U.S. EPA promulgated the RRP guidelines pertaining to renovation, repair, and painting projects that disturb lead-based paint in homes, child care facilities and pre-schools built before 1978, and it requires contractors to have their firm certified by EPA (or an EPA-authorized state), use certified renovators who are trained by EPA-approved training providers and follow lead-safe work practices.

5.3 US EPA NESHAP Regulations

According to the NESHAP standards, before general demolition or renovation activities within buildings containing asbestos can occur, identified friable and some categories of non-friable ACBMs must be properly encapsulated or abated, as prescribed by NESHAP regulations. NESHAP categorizes ACM analyzed by the PLM method into two main types, friable and non-friable ACM. Friable ACM is a material that when dry, can be crumbled, pulverized, or reduced to powder by hand pressure. Non-friable ACM is further delineated by two different Categories, Category I and Category II non-friable ACM. Category I non-friable ACM is defined as asbestos-containing packing, gaskets, resilient floor covering, and asphalt roofing product. Category II non-friable ACM is any material, excluding Category I non-friable ACM that when dry cannot be crumbled, pulverized, or reduced to powder by hand pressure. NESHAP considers friable ACM, Category I non-friable ACM, and Category II non-friable ACM that is exposed to certain conditions (discussed below), to be Regulated Asbestos Containing Material (RACM). Notification to the

Beaver Old Schoolhouse Page 5 of 8 21-090-01 Beaver, AK; Limited HBMI

U.S. EPA or the state is required before a building containing RACM is demolished or renovated. A material is considered RACM if it fits these criteria:

• Friable ACM.

• Category I non-friable ACM that has been or will be exposed to forces during demolition or removal that may disturb the material and cause it to become friable. This includes, but is not limited to, grinding, cutting, sanding, and abrading.

• Category II non-friable ACM that has been or will be exposed to forces during demolition or renovation that may disturb the material, causing it to become crumbled, pulverized, or reduced to a powdered form.

According to NESHAP regulations, RACM need not be removed before demolition or renovation if it meets the following criteria:

• It is Category I non-friable ACM that is in good condition.

• It is enclosed in concrete or other similarly hard material and is adequately wet when it is exposed during demolition or renovation.

• The RACM was discovered after demolition or renovation began and it cannot be safely removed.

• It is Category II non-friable ACM and there is a low probability that the material will become disturbed during demolition or renovation.

5.4 OSHA Regulations CFR 1910 And 1926

OSHA’s permissible exposure limit (PEL) is 0.1 fiber per cubic centimeter (f/cc) of air as an 8-hour time-weighted average (TWA). The Excursion Limit is 1.0 f/cc averaged over a 30-minute period.

With the exception of agricultural activities, OSHA’s general industry standard regulates all activities related to asbestos that are not covered by the construction and shipyard employment standards. This standard requires employers to provide awareness training to employees who perform maintenance or housekeeping duties where ACM or presumed ACM is located. This includes a mandatory participation-training program for all employees who are exposed to airborne asbestos at or above the PEL and or

Excursion Limit. The program should be instituted and carried out before the employee’s initial exposure to the area and a refresher course must be offered annually.

Under OSHA’s construction standard, OSHA classifies construction activity according to descending degree of risk, with Class I work presenting the greatest potential risk and class IV the lowest.

Beaver Old Schoolhouse Page 6 of 8 21-090-01 Beaver, AK; Limited HBMI

• Class I work involves the removal of Thermal System Insulation (TSI) and surfacing ACM or PACM.

• Class II work involves removal of any other ACM that is not TSI or surfacing ACM.

• Class III work includes repair and maintenance activities where employees are likely to disturb ACM.

• Class IV work is defined as maintenance and custodial activities during which employees contact

ACM or PACM, including waste and debris cleanup.

Employers must institute a training program for all workers who install asbestos-containing products and all workers who perform Class I, II, III, or IV work. Medical surveillance is required for all workers who engage in class I, II, or III work for a combined total of 30 days or more per year. Medical surveillance is also required for those who are exposed above the PEL or the excursion limit of 1.0 f/cc. Employers and building owners must communicate the hazard to employees and the contractors when ACM or PACM is present in their facilities or if their employees will work with ACM.

OSHA requires a competent person to be designated by the employer. The competent person must have qualifications and the authority for ensuring worker health and safety. This includes identifying existing asbestos hazards in the workplace and selecting the appropriate control strategy to reduce asbestos exposure with the authority to take prompt corrective action. Class I and Class II construction work requires the USEPA’s Model Accreditation Plan (40 CFR 763) training or its equivalent for the project designer or supervisor. Class III and Class IV construction work requires completion of a 24-hour

Operation and Maintenance (O&M) course developed by the U.S. EPA (40 CFR 763.93) or its equivalent.

The duties of the competent person include regular inspections of the job site, equipment, and materials as part of the required safety and health program.

6.0 CONCLUSIONS AND RECOMMENDATIONS

A total of 195 XRF readings were taken from all identified different testing combinations in the inspected areas of the buildings on the subject property from interior and exterior portions of the structures. Testing combinations are comprised of rooms (or room equivalents), building components, and substrates. Thirty-two of the readings, taken from walls and ceilings; porch components; window components within one bedroom, the outbuildings, and within the attic; and exterior doors located on the south side of the schoolhouse building and on the outbuildings, exceeded the EPA regulatory limit of 1.0 mg/cm2.

A total of 92 bulk samples (39 samples with 53 additional layers) were collected from PACBM identified in the inspected portions of the buildings on the subject property. Twenty-one of the sample layers were found to be “asbestos-containing” according to the NESHAP definition. Linoleum located within the

Beaver Old Schoolhouse Page 7 of 8 21-090-01 Beaver, AK; Limited HBMI foyer, hallway, kitchen, bathroom, classrooms, housing kitchen, and bedroom closet was found to contain between 3 percent and 20 percent chysotile asbestos; mastic located on the foyer floor, hallway transition strip, hallway floor, and kitchen cabinets was found to contain between 5 percent and 7 percent chrysotile asbestos; and joint compound used throughout the building was found to contain between 2 percent and 3 percent chrysotile asbestos.

The linoleum flooring materials in the foyer, hallway, kitchen, bathroom, classrooms, housing kitchen, and bedroom closet and the mastics on the foyer floor, hallway transition strip, hallway floor, and kitchen cabinets should be considered Category II non-friable ACMs. The joint compound present in the walls and ceilings throughout the building, as represented by these samples, should be considered to be friable

ACM, and is therefore RACM, as defined by NESHAP.

While an industry and regulatory-accepted method, use of the PLM method without a point count (for example the 400 or 1,000 point count) may result in estimated asbestos concentrations that are higher or lower than the material’s actual asbestos content. Other analytical procedures (for example, cleanup of the sample via gravimetric reduction) may also improve the accuracy of the laboratory results.

The conclusions and recommendations presented in this report are based on prevailing site conditions during the sample collection period. The inspector did not demolish walls, chases, or any other building spaces while performing this assessment. Consequently, ACMs and LBP may be present in other areas that were not inspected during this survey.

This report was prepared for our client, YRITWC. The scope of work was defined in our written proposal dated September 27, 2021. It is not intended for third parties to rely on the information provided in this report, except at their own risk. This report presents facts, observations, and inferences based on conditions observed during the period of our project activities, and only those conditions that were evaluated as part of our scope of work. Changes to site conditions may have occurred since we completed our initial project activities. These changes may be from the actions of man or nature. Changes in regulations may also impact the interpretation of site conditions. BGES will not disclose our findings to any parties other than our client as listed above, except as directed by our client, or as required by law.

The limited asbestos and lead inspections were conducted by Carson Kent. Mr. Kent is an Environmental

Scientist II of BGES, an AHERA-Certified Building Inspector (Certificate # TBI24-220-13779) and an

EPA-Certified Risk Assessor (Certificate # LBP-R-I219617-1). The report was reviewed by Rose Pollock, Senior Environmental Scientist of BGES. Ms. Pollock has over 8 years of environmental consulting

Beaver Old Schoolhouse Page 8 of 8 21-090-01 Beaver, AK; Limited HBMI experience and has managed or performed dozens of HBMIs including lead and asbestos inspections at sites throughout Alaska.

Conducted & Prepared by: Reviewed by:

Carson Kent Rose Pollock Environmental Scientist II Senior Environmental Scientist

TABLE 1

POSITIVE XRF READINGS AND LOCATIONS

XRF ID # Reading Location Building Component Approximate Area

(estimated total room)

1,2 Arctic Entry Interior Walls 120 Square Feet

5 Arctic Entry Ceiling 32 Square Feet

6 Arctic Entry Floor 32 Square Feet

10 Foyer Front Door Riser 3 Linear Feet

72 Classroom 2 Cabinets 120 Square Feet

106-111 Bedroom 2 Window Components 28 Linear Feet

150 Attic Window Components 14 Linear Feet

155,166,169, 170, 176

Exterior Walls 2,600 Square Feet

171 Living Room Exterior Door 20 Square Feet

174 Exterior Porch Components 20 Square Feet

177,178 Exterior Roof Eave 600 Square Feet

179,181 Shed 1 Exterior Walls 600 Square Feet

182 Shed 1 Door 20 Square Feet

183 Shed 1 Door Jamb 16 Linear Feet

187 Shed 2 Exterior Walls 1,280 Square Feet

188,193 Shed 2 Window Components 14 Square Feet

189 Shed 2 Door 16 Square Feet

194 Shed 3 Exteror Walls 140 Square Feet

195 Shed 3 Door 12 Square Feet

TABLE 2

“POSITIVE” ACM SAMPLE LOCATIONS AND RESULTS

Note: Due to the pleurality of positive results within samples of joint compounds, it should be assumed that all joint compound used in wall systems within the building is asbestos containing material. Estimates of approximate areas for wall and ceiling systems listed above are for the entire building rather than for individual sample areas.

ACM ID # Testing Location Building

Component Result

Approximate Area (estimated total for unit/common area)

AS-02

Foyer – Linoleum

Flooring Linoleum 4% Chrysotile 40 Square Feet

AS-02

Foyer – Linoleum

Flooring Mastic 6% Chrysotile 40 Square Feet

AS-03

Foyer – Wall Corner

A/B Joint Compound 2% Chrysotile

6,400 Square Feet (Cumulative)

AS-04 Foyer – Ceiling Joint Compound 2% Chrysotile 4,000 Square Feet

(Cumulative)

AS-06

Hallway – Transition

Strip Mastic 5% Chrysotile 1Square Foot

AS-07

Hallway – Linoleum

Flooring Linoleum 3% Chrysotile 390 Square Feet

AS-07

Hallway – Linoleum

Flooring Mastic 5% Chrysotile 390 Square Feet

AS-09

Hallway – Wall Corner

B/C Joint Compound 2% Chrysotile

6,400 Square Feet (Cumulative)

AS-10 Hallway – Ceiling Joint Compound 2% Chrysotile 4,000 Square Feet

(Cumulative)

AS-11

Kitchen/Bathroom – Linoleum Flooring

Linoleum 20% Chrysotile 288 Square Feet

AS-15

Classroom 1 – Linoleum

Flooring Linoleum 3% Chrysotile 1,600 Square Feet

AS-22

Housing Kitchen – Linoleum Flooring

Linoleum 20% Chrysotile 224 Square Feet

AS-23

Housing Kitchen –

Cabinets Mastic 7% Chrysotile 20 Square Feet

AS-24

Living Room – Wall

Corner C/D Joint Compound 3% Chrysotile

6,400 Square Feet (Cumulative)

AS-25 Living Room – Ceiling Joint Compound 2% Chrysotile 4,000 Square Feet

(Cumulative)

AS-26

Bedroom 1 – Wall

Corner D/A Joint Compound 2% Chrysotile

6,400 Square Feet (Cumulative)

AS-27 Bedroom 2 – Ceiling Joint Compound 2% Chrysotile 4,000 Square Feet

(Cumulative)

AS-28

Bedroom Closet – Linoleum Flooring

Linoleum 20% Chrysotile 8 Square Feet

AS-29 Shower – Wall B Joint Compound 2% Chrysotile 6,400 Square Feet

(Cumulative)

AS-37 Attic – Wall Corner B/C Joint Compound 3% Chrysotile 6,400 Square Feet

(Cumulative)

AS-38 Attic – Ceiling Joint Compound 3% Chrysotile 4,000 Square Feet

(Cumulative)

Beaver Old Schoolhouse Beaver, Alaska

PACBM and Positive XRF Reading Locations – First Floor

August 2022 Figure 1

Key

Positive XRF Reading Location

Asbestos Sample Location (< 1 percent asbestos)

Asbestos Sample Location (> 1 percent asbestos)

XRF = X-Ray Fluorescence; PACBM = Potential Asbestos Containing Building Material

Sketch map, not to scale

Wall “D”

W al l “ A

Wall “B”

W all “C

Living Room

Fo ye r

Closet

Kitchen

Classroom 1

H al lw ay

Restroom

Kitchen

Pantry

Office

Shower Bathroom

Bedroom 2

A rc tic E nt ry

Classroom 2

Bedroom 1

C lo se t

Closet Closet

Closet

Closet

Boiler Room

AS-01

AS-02

AS-03

AS-04

AS-05

AS-06 AS-07

AS-08

AS-09

AS-10

AS-14

AS-13

AS-12

AS-11

AS-16

AS-15

AS-18

AS-17

AS-19

AS-27

AS-26

AS-25

AS-24

AS-23

AS-21

AS-22

AS-20 AS-29

AS-28

XRF-1

AS-33

AS-32

AS-31

AS-30

XRF-2

XRF-155

XRF-166

XRF-169

XRF-170

XRF-110/111

XRF-106-109

XRF-72

XRF-10

XRF-6

XRF-5

Rear Entry

XRF-178

XRF-177

XRF-176

XRF-174

XRF-171

August 2022

Beaver, Alaska

PACBM and Positive XRF Reading Locations – Second Floor

Figure 2

Asbestos Sample Location (< 1 percent asbestos)

Asbestos Sample Location (> 1 percent asbestos)

XRF = X-Ray Fluorescence; PACBM = Potential Asbestos Containing Building Material

Sketch map, not to scale

Wall “D”

W al l “ A

Wall “B”

W all “C

Unfinished Attic

No Second Floor Space

Attic Storage

XRF-150

AS-34

AS-35

AS-38

AS-37

AS-36

Beaver, Alaska

PACBM and Positive XRF Reading Locations – Outbuildings and Sheds

Figure 3

Asbestos Sample Location (< 1 percent asbestos)

Asbestos Sample Location (> 1 percent asbestos)

XRF = X-Ray Fluorescence; PACBM = Potential Asbestos Containing Building Material

Sketch map, not to scale

Wall “D”

W al l “ A

Wall “B”

W all “C

Old Schoolhouse

Storage

XRF-193

AS-39

Storage

Storage

XRF-183

XRF-182

XRF-181

XRF-179

XRF-195

XRF-189

XRF-188

XRF-187

XRF-194

APPENDIX A

SITE PHOTOGRAPHS

A–1

Site Photographs

Photo 3: LBP 5 – White Wood Ceiling, Entryway

Photo 2: LBP 2 – White Wood Wall, Entryway Photo 1: LBP 1 – Teal Wood Wall, Entryway

Photo 4: LBP 6 – Grey Wood Floor, Entryway

Photo 5: LBP 10 – Grey Wood Doorway Riser, Entryway Photo 6: LBP 72 – Mint Wood Cabinets, Classroom 2

A–2

Photo 9: LBP 108 – White Wood Window Jamb, Bedroom 2 Photo 10: LBP 109 – White Wood Window Frame, Bedroom 2

Photo 8: LBP 107 – White Wood Window Sill, Bedroom 2 Photo 7: LBP 106 – White Wood Window Sash, Bedroom 2

Photo 11: LBP 110 – White Wood Window Frame, Bedroom 2 Photo 12: LBP 111 – White Wood Window Sash, Bedroom 2

A–3

Photo 15: LBP 166 – White Wood Exterior Wall Photo 16: LBP 169 – White Wood Exterior Wall

Photo 14: LBP 155 – White Wood Exterior Wall Photo 13: LBP 150 – White Wood Window Frame, Attic

Photo 17: LBP 170 – White Wood Exterior Wall Photo 18: LBP 171 – White Wood Exterior Door

A–4

Photo 21: LBP 177 – White Wood Exterior Ceiling Photo 22: LBP 178 – White Wood Exterior Wall

Photo 20: LBP 176 – White Wood Exterior Wall Photo 19: LBP 174 – Green Wood Exterior Stair Stringer

Photo 23: LBP 179 – White Wood Exterior Shed Wall Photo 24: LBP 181 – Green Wood Exterior Shed Door

A–5

Photo 27: LBP 187 – White Wood Exterior Shed Wall Photo 28: LBP 188 – Green Wood Shed Exterior Window Casing

Photo 26: LBP 183 – Green Wood Shed Door Jamb Photo 25: LBP 182 – Black Wood Shed Door

Photo 29: LBP 189 – Green Wood Shed Door Photo 30: LBP 193 – Green Wood Shed Exterior Window Casing

A–6

Photo 33: AS-02 – Linoleum and Mastic, Foyer Floor Photo 34: AS-03 – Joint Compound, Foyer Wall Corner A/B

Photo 32: LBP 195 – White Wood Exterior Shed Wall Photo 31: LBP 194 – White Wood Exterior Shed Wall

Photo 35: AS-04 – Joint Compound, Foyer Ceiling

Photo 36: AS-06 – Transition Strip Mastic, Hallway

A–7

Photo 39: AS-10 – Joint Compound, Hallway Ceiling Photo 40: AS-11 – Linoleum, Kitchen and Bathroom Floors

Photo 38: AS-09 – Joint Compound, Hallway Wall Corner B/C

Photo 37: AS-07 – Linoleum and Mastic, Hallway

Photo 41: AS-15 – Linoleum, Classroom 1 Floor

Photo 42: AS-22 – Linoleum, Kitchen Floor

A–8

Photo 45: AS-25 – Joint Compound, Living Room Ceiling Photo 46: AS-26 – Joint Compound, Bedroom 1 Wall Corner D/A

Photo 44: AS-24 – Joint Compound, Living Room Wall Corner C/D

Photo 43: AS-23 – Mastic, Kitchen Cabinet

Photo 47: AS-27 – Joint Compound, Bedroom 1 Ceiling

Photo 48: AS-28 – Linoleum, Closet Floor

A–9

Photo 51: AS-38 – Joint Compound, Attic Ceiling

Photo 50: AS-37 – Joint Compound, Attic Wall Corner B/C Photo 49: AS-29 – Joint Compound, Shower Wall

APPENDIX B

XRF & PLM ANALYTICAL DATA

XRF Readings BGES, Inc.

No. Job Room Structure Member Substrate Wall Result Units Pos/Neg Time Date ‐ Beaver Old Schoolhouse Calibration --- --- --- --- 1.2 mg/cm2 Positive 9:15:29 5/11/2022 ‐ Beaver Old Schoolhouse Calibration --- --- --- --- 1 mg/cm2 Positive 9:16:03 5/11/2022 ‐ Beaver Old Schoolhouse Calibration --- --- --- --- 1 mg/cm2 Positive 9:16:34 5/11/2022 ‐ Beaver Old Schoolhouse Calibration --- --- --- --- 0.1 mg/cm2 Negative 9:17:07 5/11/2022 ‐ Beaver Old Schoolhouse Calibration --- --- --- --- 0.1 mg/cm2 Negative 9:17:22 5/11/2022 ‐ Beaver Old Schoolhouse Calibration --- --- --- --- 0 mg/cm2 Negative 9:17:37 5/11/2022 1 Beaver Old Schoolhouse Arctic Entry Room Wall Wood D 8.7 mg/cm2 Positive 9:22:27 5/11/2022 2 Beaver Old Schoolhouse Arctic Entry Room Wall Wood B 8.2 mg/cm2 Positive 9:23:22 5/11/2022 3 Beaver Old Schoolhouse Arctic Entry Room Chair Rail Wood B 0.1 mg/cm2 Negative 9:24:11 5/11/2022 4 Beaver Old Schoolhouse Arctic Entry Room Chair Rail Wood B 0 mg/cm2 Negative 9:24:39 5/11/2022 5 Beaver Old Schoolhouse Arctic Entry Room Ceiling Wood --- 5.8 mg/cm2 Positive 9:25:09 5/11/2022 6 Beaver Old Schoolhouse Arctic Entry Room Floor Wood --- 2.6 mg/cm2 Positive 9:26:40 5/11/2022 7 Beaver Old Schoolhouse Foyer Door --- Metal A 0 mg/cm2 Negative 9:27:35 5/11/2022 8 Beaver Old Schoolhouse Foyer Door Jamb Wood A ‐0.2 mg/cm2 Negative 9:28:23 5/11/2022 9 Beaver Old Schoolhouse Foyer Door Jamb Wood A 0 mg/cm2 Negative 9:28:38 5/11/2022 10 Beaver Old Schoolhouse Foyer Door Riser Wood A 5.4 mg/cm2 Positive 9:29:14 5/11/2022 11 Beaver Old Schoolhouse Foyer Door Frame Wood A ‐0.1 mg/cm2 Negative 9:30:01 5/11/2022 12 Beaver Old Schoolhouse Foyer Door Frame Wood A 0 mg/cm2 Negative 9:30:20 5/11/2022 13 Beaver Old Schoolhouse Foyer Room Wall Drywall D 0.1 mg/cm2 Negative 9:31:09 5/11/2022 14 Beaver Old Schoolhouse Foyer Room Ceiling Drywall --- 0.1 mg/cm2 Negative 9:33:02 5/11/2022 15 Beaver Old Schoolhouse Foyer Radiator --- Metal B 0.1 mg/cm2 Negative 9:33:47 5/11/2022 16 Beaver Old Schoolhouse Foyer Door Jamb Wood A 0 mg/cm2 Negative 9:34:19 5/11/2022 17 Beaver Old Schoolhouse Foyer Door Jamb Wood A ‐0.1 mg/cm2 Negative 9:34:34 5/11/2022 18 Beaver Old Schoolhouse Foyer Door Jamb Wood A ‐0.1 mg/cm2 Negative 9:34:51 5/11/2022 19 Beaver Old Schoolhouse Foyer Door Frame Wood A ‐0.1 mg/cm2 Negative 9:35:18 5/11/2022 20 Beaver Old Schoolhouse Hallway Room Wall Drywall B 0.1 mg/cm2 Negative 9:36:18 5/11/2022 21 Beaver Old Schoolhouse Hallway Room Wall Drywall D 0.1 mg/cm2 Negative 9:36:46 5/11/2022 22 Beaver Old Schoolhouse Hallway Room Wall Drywall D 0 mg/cm2 Negative 9:37:02 5/11/2022 23 Beaver Old Schoolhouse Hallway Room Ceiling Drywall --- 0.2 mg/cm2 Negative 9:37:40 5/11/2022 24 Beaver Old Schoolhouse Hallway Radiator --- Metal D 0.2 mg/cm2 Negative 9:38:26 5/11/2022 25 Beaver Old Schoolhouse Hallway Electric Panel --- Metal D 0.1 mg/cm2 Negative 9:38:55 5/11/2022 26 Beaver Old Schoolhouse Kitchen Door Jamb Wood B ‐0.2 mg/cm2 Negative 9:39:43 5/11/2022 27 Beaver Old Schoolhouse Kitchen Door Jamb Wood B ‐0.2 mg/cm2 Negative 9:40:56 5/11/2022 28 Beaver Old Schoolhouse Kitchen Door Frame Wood B 0.1 mg/cm2 Negative 9:41:24 5/11/2022 29 Beaver Old Schoolhouse Kitchen Room Wall Drywall A 0.1 mg/cm2 Negative 9:42:18 5/11/2022 30 Beaver Old Schoolhouse Kitchen Room Wall Drywall B 0 mg/cm2 Negative 9:42:46 5/11/2022 31 Beaver Old Schoolhouse Kitchen Room Ceiling Drywall B 0.3 mg/cm2 Negative 9:43:24 5/11/2022 32 Beaver Old Schoolhouse Kitchen Window Sash Wood A ‐0.1 mg/cm2 Negative 9:44:28 5/11/2022 33 Beaver Old Schoolhouse Kitchen Window Sill Wood A 0 mg/cm2 Negative 9:44:53 5/11/2022 34 Beaver Old Schoolhouse Kitchen Window Frame Wood A 0 mg/cm2 Negative 9:45:20 5/11/2022 35 Beaver Old Schoolhouse Kitchen Radiator --- Metal A 0.1 mg/cm2 Negative 9:45:49 5/11/2022 36 Beaver Old Schoolhouse Pantry Door Jamb Wood B ‐0.1 mg/cm2 Negative 9:47:00 5/11/2022 37 Beaver Old Schoolhouse Pantry Door Jamb Wood B ‐0.1 mg/cm2 Negative 9:47:15 5/11/2022

38 Beaver Old Schoolhouse Pantry Door Frame Wood B ‐0.1 mg/cm2 Negative 9:47:41 5/11/2022 39 Beaver Old Schoolhouse Pantry Room Wall Drywall B 0.1 mg/cm2 Negative 9:48:28 5/11/2022 40 Beaver Old Schoolhouse Pantry Room Wall Drywall C 0 mg/cm2 Negative 9:48:52 5/11/2022 41 Beaver Old Schoolhouse Pantry Radiator --- Metal A 0.1 mg/cm2 Negative 9:49:29 5/11/2022 42 Beaver Old Schoolhouse 1/2 Bathroom Door Jamb Wood C ‐0.2 mg/cm2 Negative 9:50:13 5/11/2022 43 Beaver Old Schoolhouse 1/2 Bathroom Door Frame Wood C 0 mg/cm2 Negative 9:51:31 5/11/2022 44 Beaver Old Schoolhouse 1/2 Bathroom Room Wall Drywall C 0.1 mg/cm2 Negative 9:52:13 5/11/2022 45 Beaver Old Schoolhouse Kitchen Cabinets Door Wood C ‐0.1 mg/cm2 Negative 9:53:36 5/11/2022 46 Beaver Old Schoolhouse Room 1 Door Jamb Wood C ‐0.1 mg/cm2 Negative 9:54:58 5/11/2022 47 Beaver Old Schoolhouse Room 1 Door Frame Wood C 0 mg/cm2 Negative 9:55:34 5/11/2022 48 Beaver Old Schoolhouse Room 1 Room Wall Drywall A 0.1 mg/cm2 Negative 10:00:35 5/11/2022 49 Beaver Old Schoolhouse Room 1 Room Wall Drywall C 0 mg/cm2 Negative 10:01:00 5/11/2022 50 Beaver Old Schoolhouse Room 1 Window Sash Wood A ‐0.1 mg/cm2 Negative 10:01:38 5/11/2022 51 Beaver Old Schoolhouse Room 1 Window Sash Wood A ‐0.1 mg/cm2 Negative 10:02:01 5/11/2022 52 Beaver Old Schoolhouse Room 1 Window Sill Wood A 0.1 mg/cm2 Negative 10:02:25 5/11/2022 53 Beaver Old Schoolhouse Room 1 Window Frame Wood A 0.1 mg/cm2 Negative 10:02:54 5/11/2022 54 Beaver Old Schoolhouse Room 1 Window Frame Wood A 0 mg/cm2 Negative 10:03:20 5/11/2022 55 Beaver Old Schoolhouse Room 1 Radiator --- Metal D 0.2 mg/cm2 Negative 10:03:54 5/11/2022 56 Beaver Old Schoolhouse Room 1 Room Baseboard Wood C 0 mg/cm2 Negative 10:04:31 5/11/2022 57 Beaver Old Schoolhouse Room 1 Door --- Metal D 0.1 mg/cm2 Negative 10:05:06 5/11/2022 58 Beaver Old Schoolhouse Room 1 Door Jamb Metal D ‐0.2 mg/cm2 Negative 10:06:14 5/11/2022 59 Beaver Old Schoolhouse Room 1 Door Jamb Metal D ‐0.3 mg/cm2 Negative 10:06:32 5/11/2022 60 Beaver Old Schoolhouse Room 2 Door Jamb Wood D ‐0.1 mg/cm2 Negative 10:07:43 5/11/2022 61 Beaver Old Schoolhouse Room 2 Door Jamb Wood D 0 mg/cm2 Negative 10:08:01 5/11/2022 62 Beaver Old Schoolhouse Room 2 Door Frame Wood D ‐0.1 mg/cm2 Negative 10:08:26 5/11/2022 63 Beaver Old Schoolhouse Room 2 Door --- Metal D 0.1 mg/cm2 Negative 10:09:04 5/11/2022 64 Beaver Old Schoolhouse Room 2 Door Jamb Metal D 0 mg/cm2 Negative 10:09:36 5/11/2022 65 Beaver Old Schoolhouse Room 2 Door Frame Wood D ‐0.1 mg/cm2 Negative 10:10:03 5/11/2022 66 Beaver Old Schoolhouse Room 2 Room Wall Drywall A 0.2 mg/cm2 Negative 10:10:48 5/11/2022 67 Beaver Old Schoolhouse Room 2 Room Wall Drywall C 0.1 mg/cm2 Negative 10:11:14 5/11/2022 68 Beaver Old Schoolhouse Room 2 Window Sash Wood C ‐0.1 mg/cm2 Negative 10:11:46 5/11/2022 69 Beaver Old Schoolhouse Room 2 Window Sash Wood C 0 mg/cm2 Negative 10:12:10 5/11/2022 70 Beaver Old Schoolhouse Room 2 Window Sill Wood C 0 mg/cm2 Negative 10:12:39 5/11/2022 71 Beaver Old Schoolhouse Room 2 Window Frame Wood C 0 mg/cm2 Negative 10:13:09 5/11/2022 72 Beaver Old Schoolhouse Classroom 2 Cabinets Door Wood B 1.1 mg/cm2 Positive 10:13:48 5/11/2022 73 Beaver Old Schoolhouse Room 2 Cabinets Frame Wood B 0.1 mg/cm2 Negative 10:14:49 5/11/2022 74 Beaver Old Schoolhouse Room 3 Door Jamb Wood C ‐0.1 mg/cm2 Negative 10:16:04 5/11/2022 75 Beaver Old Schoolhouse Room 3 Door Jamb Wood C ‐0.1 mg/cm2 Negative 10:16:21 5/11/2022 76 Beaver Old Schoolhouse Living Room/Kitchen Room Wall Drywall A 0.1 mg/cm2 Negative 10:17:16 5/11/2022 77 Beaver Old Schoolhouse Living Room/Kitchen Room Wall Drywall A 0.1 mg/cm2 Negative 10:17:32 5/11/2022 78 Beaver Old Schoolhouse Living Room/Kitchen Room Wall Drywall C 0 mg/cm2 Negative 10:18:01 5/11/2022 79 Beaver Old Schoolhouse Living Room/Kitchen Room Ceiling Drywall --- 0 mg/cm2 Negative 10:18:29 5/11/2022 80 Beaver Old Schoolhouse Living Room/Kitchen Closet Jamb Wood D ‐0.1 mg/cm2 Negative 10:19:02 5/11/2022

81 Beaver Old Schoolhouse Living Room/Kitchen Closet Shelf Support Wood D 0 mg/cm2 Negative 10:19:27 5/11/2022 82 Beaver Old Schoolhouse Living Room/Kitchen Closet Shelf Support Wood D 0 mg/cm2 Negative 10:19:50 5/11/2022 83 Beaver Old Schoolhouse Living Room/Kitchen Closet Slide Door Wood D 0.1 mg/cm2 Negative 10:20:20 5/11/2022 84 Beaver Old Schoolhouse Living Room/Kitchen Cabinets Door Wood C 0 mg/cm2 Negative 10:21:21 5/11/2022 85 Beaver Old Schoolhouse Living Room/Kitchen Cabinets Door Wood C 0.1 mg/cm2 Negative 10:21:38 5/11/2022 86 Beaver Old Schoolhouse Living Room/Kitchen Window Sash Wood B ‐0.1 mg/cm2 Negative 10:22:22 5/11/2022 87 Beaver Old Schoolhouse Living Room/Kitchen Window Sill Wood B 0.3 mg/cm2 Negative 10:22:49 5/11/2022 88 Beaver Old Schoolhouse Living Room/Kitchen Window Frame Wood B ‐0.1 mg/cm2 Negative 10:23:16 5/11/2022 89 Beaver Old Schoolhouse Living Room/Kitchen Radiator --- Metal B 0.2 mg/cm2 Negative 10:23:46 5/11/2022 90 Beaver Old Schoolhouse Rear Entry Door --- Metal D 0.1 mg/cm2 Negative 10:25:04 5/11/2022 91 Beaver Old Schoolhouse Rear Entry Door Frame Wood D 0 mg/cm2 Negative 10:25:30 5/11/2022 92 Beaver Old Schoolhouse Rear Entry Room Wall Drywall C 0.1 mg/cm2 Negative 10:26:10 5/11/2022 93 Beaver Old Schoolhouse Rear Entry Room Ceiling Drywall --- 0.1 mg/cm2 Negative 10:26:50 5/11/2022 94 Beaver Old Schoolhouse Bedroom 1 Door Jamb Wood C ‐0.1 mg/cm2 Negative 10:29:33 5/11/2022 95 Beaver Old Schoolhouse Bedroom 1 Door Frame Wood C 0 mg/cm2 Negative 10:30:13 5/11/2022 96 Beaver Old Schoolhouse Bedroom 1 Room Wall Drywall C 0.1 mg/cm2 Negative 10:31:05 5/11/2022 97 Beaver Old Schoolhouse Bedroom 1 Room Wall Drywall A 0.1 mg/cm2 Negative 10:31:48 5/11/2022 98 Beaver Old Schoolhouse Bedroom 1 Window Sash Wood C ‐0.1 mg/cm2 Negative 10:32:43 5/11/2022 99 Beaver Old Schoolhouse Bedroom 1 Window Sash Wood C ‐0.1 mg/cm2 Negative 10:36:39 5/11/2022 100 Beaver Old Schoolhouse Bedroom 1 Radiator --- Metal C 0.2 mg/cm2 Negative 10:37:07 5/11/2022 101 Beaver Old Schoolhouse Bedroom 1 Closet Door Wood B 0 mg/cm2 Negative 10:37:45 5/11/2022 102 Beaver Old Schoolhouse Bedroom 1 Closet Shelf Support Wood B 0 mg/cm2 Negative 10:38:09 5/11/2022 103 Beaver Old Schoolhouse Bedroom 1 Room Baseboard Wood B ‐0.1 mg/cm2 Negative 10:38:37 5/11/2022 104 Beaver Old Schoolhouse Bedroom 2 Room Wall Drywall A 0 mg/cm2 Negative 10:39:18 5/11/2022 105 Beaver Old Schoolhouse Bedroom 2 Room Ceiling Drywall --- ‐0.1 mg/cm2 Negative 10:39:48 5/11/2022 106 Beaver Old Schoolhouse Bedroom 2 Window Sash Wood --- 3 mg/cm2 Positive 10:40:15 5/11/2022 107 Beaver Old Schoolhouse Bedroom 2 Window Sill Wood --- 2.8 mg/cm2 Positive 10:40:54 5/11/2022 108 Beaver Old Schoolhouse Bedroom 2 Window Jamb Wood --- 9.8 mg/cm2 Positive 10:41:33 5/11/2022 109 Beaver Old Schoolhouse Bedroom 2 Window Frame Wood C 1.8 mg/cm2 Positive 10:42:18 5/11/2022 110 Beaver Old Schoolhouse Bedroom 2 Window Frame Wood C 1.7 mg/cm2 Positive 10:42:50 5/11/2022 111 Beaver Old Schoolhouse Bedroom 2 Window Sash Wood D 2.8 mg/cm2 Positive 10:43:42 5/11/2022 112 Beaver Old Schoolhouse Bedroom 2 Closet Wall Drywall B 0.2 mg/cm2 Negative 10:44:29 5/11/2022 113 Beaver Old Schoolhouse Bedroom 2 Closet Wall Wood B 0.1 mg/cm2 Negative 10:44:58 5/11/2022 114 Beaver Old Schoolhouse Bathroom Room Wall Drywall A 0.1 mg/cm2 Negative 10:45:33 5/11/2022 115 Beaver Old Schoolhouse Bathroom Room Wall Drywall C 0.2 mg/cm2 Negative 10:45:55 5/11/2022 116 Beaver Old Schoolhouse Bathroom Room Baseboard Wood D ‐0.1 mg/cm2 Negative 10:46:25 5/11/2022 117 Beaver Old Schoolhouse Bathroom Door Frame Wood D 0 mg/cm2 Negative 10:46:58 5/11/2022 118 Beaver Old Schoolhouse Office Door Jamb Wood D ‐0.1 mg/cm2 Negative 10:47:48 5/11/2022 119 Beaver Old Schoolhouse Office Room Wall Drywall C 0 mg/cm2 Negative 10:48:16 5/11/2022 120 Beaver Old Schoolhouse Office Window Sash Wood A 0 mg/cm2 Negative 10:48:52 5/11/2022 121 Beaver Old Schoolhouse Office Window Sill Wood A ‐0.1 mg/cm2 Negative 10:49:15 5/11/2022 122 Beaver Old Schoolhouse utility closet Room Wall Drywall B 0.1 mg/cm2 Negative 10:50:16 5/11/2022 123 Beaver Old Schoolhouse utility closet Room Ceiling Drywall --- ‐0.1 mg/cm2 Negative 10:50:42 5/11/2022

124 Beaver Old Schoolhouse utility closet Door Jamb Wood B ‐0.2 mg/cm2 Negative 10:51:10 5/11/2022 125 Beaver Old Schoolhouse 1st Flr Bathroom Door Jamb Wood B ‐0.1 mg/cm2 Negative 10:51:49 5/11/2022 126 Beaver Old Schoolhouse 1st Flr Bathroom Room Wall Drywall B ‐0.1 mg/cm2 Negative 10:52:25 5/11/2022 127 Beaver Old Schoolhouse 1st Flr Bathroom Room Wall Wood B 0 mg/cm2 Negative 10:52:49 5/11/2022 128 Beaver Old Schoolhouse Hallway 1 Room Wall Drywall A ‐0.2 mg/cm2 Negative 10:53:41 5/11/2022 129 Beaver Old Schoolhouse Hallway 1 Room Wall Drywall C 0.1 mg/cm2 Negative 10:54:03 5/11/2022 130 Beaver Old Schoolhouse Hallway 1 Door --- Metal C 0.1 mg/cm2 Negative 10:54:38 5/11/2022 131 Beaver Old Schoolhouse Hallway 1 Door Jamb Wood C ‐0.1 mg/cm2 Negative 10:55:01 5/11/2022 132 Beaver Old Schoolhouse Hallway 1 Door Jamb Wood C ‐0.1 mg/cm2 Negative 10:55:32 5/11/2022 133 Beaver Old Schoolhouse utility closet Door Jamb Wood A 0 mg/cm2 Negative 10:56:29 5/11/2022 134 Beaver Old Schoolhouse utility closet Room Wall Drywall D 0.1 mg/cm2 Negative 10:56:58 5/11/2022 135 Beaver Old Schoolhouse utility closet Room Wall Drywall B 0.2 mg/cm2 Negative 10:57:22 5/11/2022 136 Beaver Old Schoolhouse Boiler Room Door Jamb Wood B 0 mg/cm2 Negative 10:58:11 5/11/2022 137 Beaver Old Schoolhouse Boiler Room Door Frame Wood B 0 mg/cm2 Negative 10:58:33 5/11/2022 138 Beaver Old Schoolhouse Boiler Room Room Floor Wood --- 0.1 mg/cm2 Negative 10:59:23 5/11/2022 139 Beaver Old Schoolhouse Stairwell Door Jamb Wood B 0 mg/cm2 Negative 11:00:38 5/11/2022 140 Beaver Old Schoolhouse Stairwell Stair Risers Wood B 0.1 mg/cm2 Negative 11:01:10 5/11/2022 141 Beaver Old Schoolhouse Attic Door --- Wood C 0 mg/cm2 Negative 11:02:30 5/11/2022 142 Beaver Old Schoolhouse Attic Door Jamb Wood C 0.1 mg/cm2 Negative 11:02:54 5/11/2022 143 Beaver Old Schoolhouse Attic Door Jamb Wood C 0 mg/cm2 Negative 11:03:13 5/11/2022 144 Beaver Old Schoolhouse Attic Door Frame Wood C ‐0.1 mg/cm2 Negative 11:03:38 5/11/2022 145 Beaver Old Schoolhouse Attic Room Wall Drywall A 0.1 mg/cm2 Negative 11:04:20 5/11/2022 146 Beaver Old Schoolhouse Attic Room Ceiling Drywall --- 0.1 mg/cm2 Negative 11:04:49 5/11/2022 147 Beaver Old Schoolhouse Attic Room Floor Wood --- 0 mg/cm2 Negative 11:05:30 5/11/2022 148 Beaver Old Schoolhouse Attic Window Sash Wood B 0.7 mg/cm2 Negative 11:06:01 5/11/2022 149 Beaver Old Schoolhouse Attic Window Sill Wood B 0 mg/cm2 Negative 11:06:56 5/11/2022 150 Beaver Old Schoolhouse Attic Window Frame Wood B 1.2 mg/cm2 Positive 11:07:19 5/11/2022 151 Beaver Old Schoolhouse Attic Window Sash Wood D ‐0.1 mg/cm2 Negative 11:08:38 5/11/2022 152 Beaver Old Schoolhouse Attic Window Frame Wood D 0 mg/cm2 Negative 11:09:26 5/11/2022 153 Beaver Old Schoolhouse Attic Radiator --- Metal D 0.1 mg/cm2 Negative 11:10:09 5/11/2022 154 Beaver Old Schoolhouse Attic Radiator --- Metal D 0 mg/cm2 Negative 11:10:35 5/11/2022 155 Beaver Old Schoolhouse House Room Wall Wood A 22.6 mg/cm2 Positive 11:21:17 5/11/2022 156 Beaver Old Schoolhouse House Room Wall Wood A 0 mg/cm2 Negative 11:21:57 5/11/2022 157 Beaver Old Schoolhouse House Room Wall Wood A ‐0.1 mg/cm2 Negative 11:22:21 5/11/2022 158 Beaver Old Schoolhouse House Room Wall Wood A 0.2 mg/cm2 Negative 11:22:38 5/11/2022 159 Beaver Old Schoolhouse House Room Wall Wood A 0.1 mg/cm2 Negative 11:22:59 5/11/2022 160 Beaver Old Schoolhouse House Room Wall Wood B ‐0.1 mg/cm2 Negative 11:23:26 5/11/2022 161 Beaver Old Schoolhouse House Room Wall Wood C 0.1 mg/cm2 Negative 11:24:26 5/11/2022 162 Beaver Old Schoolhouse House Room Wall Wood C ‐0.1 mg/cm2 Negative 11:25:02 5/11/2022 163 Beaver Old Schoolhouse House Room Wall Wood C ‐0.1 mg/cm2 Negative 11:25:19 5/11/2022 164 Beaver Old Schoolhouse House Stair Railing Wood C 0 mg/cm2 Negative 11:25:55 5/11/2022 165 Beaver Old Schoolhouse House Stair Stringer Wood C ‐0.2 mg/cm2 Negative 11:26:29 5/11/2022 166 Beaver Old Schoolhouse House Room Wall Wood B 14.9 mg/cm2 Positive 11:26:59 5/11/2022

167 Beaver Old Schoolhouse House Stair Stringer Wood B ‐0.1 mg/cm2 Negative 11:27:49 5/11/2022 168 Beaver Old Schoolhouse House Room Wall Wood C ‐0.2 mg/cm2 Negative 11:28:56 5/11/2022 169 Beaver Old Schoolhouse House Room Wall Wood C 14.5 mg/cm2 Positive 11:29:12 5/11/2022 170 Beaver Old Schoolhouse House Room Wall Wood D 22.5 mg/cm2 Positive 11:30:11 5/11/2022 171 Beaver Old Schoolhouse House Door --- Wood D 2.2 mg/cm2 Positive 11:31:06 5/11/2022 172 Beaver Old Schoolhouse House Door Frame Wood D ‐0.2 mg/cm2 Negative 11:31:53 5/11/2022 173 Beaver Old Schoolhouse House Stair Railing Wood D ‐0.1 mg/cm2 Negative 11:32:20 5/11/2022 174 Beaver Old Schoolhouse House Stair Underside Wood D 9.2 mg/cm2 Positive 11:32:51 5/11/2022 175 Beaver Old Schoolhouse House Room Wall Wood C 0 mg/cm2 Negative 11:33:41 5/11/2022 176 Beaver Old Schoolhouse House Room Wall Wood C 16.7 mg/cm2 Positive 11:33:57 5/11/2022 177 Beaver Old Schoolhouse House Room Ceiling Wood A 15.9 mg/cm2 Positive 11:34:45 5/11/2022 178 Beaver Old Schoolhouse House Room Ceiling Wood A 21.2 mg/cm2 Positive 11:35:16 5/11/2022 179 Beaver Old Schoolhouse Shed (Exterior) Room Wall Wood D 14.5 mg/cm2 Positive 11:36:15 5/11/2022 180 Beaver Old Schoolhouse House Room Wall Wood D ‐0.2 mg/cm2 Negative 11:36:53 5/11/2022 181 Beaver Old Schoolhouse Shed (Exterior) Room Wall Wood A 13.5 mg/cm2 Positive 11:38:19 5/11/2022 182 Beaver Old Schoolhouse Shed (Exterior) Door --- Wood A 1 mg/cm2 Positive 11:39:09 5/11/2022 183 Beaver Old Schoolhouse Shed (Exterior) Door Jamb Wood A 2.6 mg/cm2 Positive 11:40:04 5/11/2022 184 Beaver Old Schoolhouse Shed (Exterior) Room Floor Wood --- ‐0.1 mg/cm2 Negative 11:40:46 5/11/2022 185 Beaver Old Schoolhouse Shed (Exterior) Room Wall Drywall A 0.1 mg/cm2 Negative 11:41:19 5/11/2022 186 Beaver Old Schoolhouse Shed (Exterior) Room Ceiling Wood --- 0 mg/cm2 Negative 11:42:01 5/11/2022 187 Beaver Old Schoolhouse Shed (Exterior) Room Wall Wood A 12.7 mg/cm2 Positive 11:43:00 5/11/2022 188 Beaver Old Schoolhouse Shed (Exterior) Window Exterior Casing Wood A 6.4 mg/cm2 Positive 11:44:05 5/11/2022 189 Beaver Old Schoolhouse Shed (Exterior) Door --- Wood A 6.5 mg/cm2 Positive 11:44:52 5/11/2022 190 Beaver Old Schoolhouse Shed (Exterior) Room Wall Wood C 0.1 mg/cm2 Negative 11:46:16 5/11/2022 191 Beaver Old Schoolhouse Shed (Exterior) Room Ceiling Wood --- 0 mg/cm2 Negative 11:46:45 5/11/2022 192 Beaver Old Schoolhouse Shed (Exterior) HVAC Metal --- 0.2 mg/cm2 Negative 11:47:42 5/11/2022 193 Beaver Old Schoolhouse Shed (Exterior) Window Exterior Casing Wood A 3.1 mg/cm2 Positive 11:48:40 5/11/2022 194 Beaver Old Schoolhouse Shed (Exterior) Room Wall Wood D 10.2 mg/cm2 Positive 11:49:42 5/11/2022 195 Beaver Old Schoolhouse Shed (Exterior) Door --- Wood D 20.3 mg/cm2 Positive 11:50:42 5/11/2022 ‐ Beaver Old Schoolhouse Calibration --- --- --- --- 1 mg/cm2 Positive 12:08:48 2/21/2022 ‐ Beaver Old Schoolhouse Calibration --- --- --- --- 1.2 mg/cm2 Positive 12:09:15 2/21/2022 ‐ Beaver Old Schoolhouse Calibration --- --- --- --- 1.1 mg/cm2 Positive 12:09:44 2/21/2022 ‐ Beaver Old Schoolhouse Calibration --- --- --- --- 0 mg/cm2 Negative 12:10:15 2/21/2022 ‐ Beaver Old Schoolhouse Calibration --- --- --- --- 0.1 mg/cm2 Negative 12:10:27 2/21/2022 ‐ Beaver Old Schoolhouse Calibration --- --- --- --- 0.1 mg/cm2 Negative 12:10:42 2/21/2022

Company Heuresis Corp.

Model Pb200i Type XRF Lead Paint Analyzer

Serial Num. 1905 App Version Pb200i-REL-4.0-29

EMSL Analytical, Inc.

200 Route 130 North Cinnaminson, NJ 08077

Tel/Fax: (800) 220-3675 / (856) 786-5974 http://www.EMSL.com / cinnasblab@EMSL.com

042211180EMSL Order:

Customer ID: BGES62

Customer PO:

Project ID:

Attention: Phone:Brian Braunstein (907) 696-0237

Fax:BGES, Inc. (907) 644-2901

Received Date:1042 East 6th Avenue 05/17/2022 9:30 AM

Analysis Date:Anchorage, AK 99501 05/23/2022 - 05/24/2022

Collected Date: 05/11/2022

Project: Beaver

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized

Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

AS-01-Cove Base

042211180-0001

None DetectedNon-fibrous (Other)100%Brown

Non-Fibrous

Homogeneous

Foyer - Cove Base

AS-01-Mastic

042211180-0001A

None DetectedNon-fibrous (Other)100%Brown/Tan

Non-Fibrous

Homogeneous

Foyer - Mastic

AS-02-Linoleum

042211180-0002

4% ChrysotileNon-fibrous (Other)96%Gray

Non-Fibrous

Homogeneous

Foyer Floorr -

Linoleum

AS-02-Mastic

042211180-0002A

6% ChrysotileNon-fibrous (Other)94%Black

Non-Fibrous

Homogeneous

Foyer Floorr - Mastic

AS-03-Drywall

042211180-0003

None DetectedNon-fibrous (Other)90%Cellulose10%Brown/White

Non-Fibrous

Homogeneous

Foyer Wall Corner

A/B - Wall Material

AS-03-Joint Compound

042211180-0003A

2% ChrysotileNon-fibrous (Other)98%White

Non-Fibrous

Homogeneous

Foyer Wall Corner

A/B - Wall Material

AS-04-Drywall

042211180-0004

None DetectedNon-fibrous (Other)88%Cellulose

Glass

10%

2%

Brown/White

Non-Fibrous

Homogeneous

Foyer Ceiling - Ceiling

Material

AS-04-Joint Compound

042211180-0004A

2% ChrysotileNon-fibrous (Other)98%White

Non-Fibrous

Homogeneous

Foyer Ceiling - Ceiling

Material

AS-05-Insulation

042211180-0005

None DetectedNon-fibrous (Other)2%Min. Wool98%Yellow

Fibrous

Homogeneous

Foyer - Pipe

Insulation

AS-05-Tape

042211180-0005A

None DetectedNon-fibrous (Other)10%Cellulose

Glass

60%

30%

White/Silver

Fibrous

Homogeneous

Foyer - Tape

AS-06-Strip

042211180-0006

None DetectedNon-fibrous (Other)100%Brown

Non-Fibrous

Homogeneous

Hallway - Transition

Strip

AS-06-Mastic

042211180-0006A

5% ChrysotileNon-fibrous (Other)95%Brown/Black

Non-Fibrous

Homogeneous

Hallway - Mastic

AS-07-Linoleum

042211180-0007

3% ChrysotileNon-fibrous (Other)97%Tan/White

Non-Fibrous

Homogeneous

Hallway Floor -

Linoleum

AS-07-Mastic

0422…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .