This document is an Addendum No. 1 issued by Wakely Associates, Inc. on behalf of Warren Consolidated Schools for their 2022 Bond Program, Bid Package #5A, which involves MEP (Mechanical, Electrical, Plumbing) work for Chiller Upgrades at Sterling Heights High School. The addendum clarifies and modifies the previous contract documents, including revisions to the chilled water piping demolition and new installation as shown on updated drawings. It also adds a scope of work item for the electrical contractor to install additional conduits. The bid due date is 2:00 PM on Tuesday, December 12, 2023.
The addendum includes $5,000 for temporary fencing per the directive of Clark Construction Company, the project manager. Pricing terms, set asides, incumbents, funding requirements and sources are not specified in this addendum. The project is part of the 2022 Bond Program for the Warren Consolidated School District, located in Macomb County and the City of Warren, Michigan.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM No. 01
December 6, 2023
Warren Consolidated Schools 2022 Bond Program Page 1 of 2
Bid Package No. 05A (Addendum 1) Project No. 2903
PROJECT: Warren Consolidated Schools
2022 Bond Issue
CLARK PROJECT NO.: 2903
BID PACKAGE NO.: 05A
DESCRIPTION: MEP for Chiller Upgrades at SHHS
BID DUE DATE/TIME: 2:00 PM, Tuesday December 12, 2023
The following clarifications and/or Changes made to the Contract Documents are hereby made part of the Contract Documents.
The general character of the Work clarified or revised by this Addendum shall be the same as required by the complete set of Contract Documents. All incidentals required in connection with the Work of this Addendum shall be included in the Scope of Work even though not specifically specified.
All bidders shall be held responsible to review the Addendum and to include in its Bid
Proposal all Work reasonably inferred to be included in its Scope of Work.
Acknowledge receipt of this Addendum in the space provided on the Bid Proposal
Form.
Warren Consolidated Schools 2022 Bond Program Page 2 of 2
Bid Package No. 05A (Addendum 1) Project No. 2903
Include (u.n.o):
1. BIDDING REQUIREMENTS:
1.1. Section 002416 – Scope of Work – Bid Categories (Not Reissued)
A. Bid Category No. 02A – Selective Demolition
1. Include $5,000 for temporary fencing per Clark Construction Company directive.
B. Bid Category No. 26A – Electrical
1. Add Scope of Work item 30 indicating to “Add (2) 1” conduits from the mechanical room B127 to each new chiller location.”.
2. ARCHITECT / ENGINEER DOCUMENTION:
2.1. Addendum No. 1 Write-Ups, Drawings, and Specifications issued by Wakely
Associates, Inc. dated 12/5/23.
END OF SECTION
WAKELY ASSOCIATES, INC. ADDENDUM NO. ONE
ARCHITECTS WARREN CONSOLIDATED SCHOOLS
30500 Van Dyke Avenue Suite 209 2022 BOND PROGRAM BID PACKAGE #5A Warren, Michigan 48093 Page 1 of 1 (write up only)
DECEMBER 5, 2023
ADDENDUM NO. ONE to the plans and specifications for the WARREN CONSOLIDATED SCHOOLS, 2022 BOND PROGRAM, BID PACK #5A, Warren, MI, Architect’s Project No. 232012, dated November 27, 2023
The above plans and specifications are modified, supplemented, or augmented as follows, and this ADDENDUM NO. ONE, is hereby made a part of the contract documents.
Drawings MD22.11B, M22.11B, and M22.50 are being issued with this Addendum.
MECHANICAL ITEMS
ITEM NO. M1 Refer to sheet MD22.11B (Re-issued):
1. Revise chilled water piping demolition as indicated.
ITEM NO. M2 Refer to sheet M22.11B (Re-issued):
1. Revise the new chilled water piping as indicated. Refer to the diagrams for additional information.
ITEM NO. M3 Refer to sheet M22.50 (Re-issued):
1. Revise Chilled Water System Demolition Piping Diagram as indicated.
2. Revise Chilled Water System Piping Diagram as indicated.
END OF ADDENDUM NO. 01
Cc: Nick Pitrone, Warren Consolidated Schools Ron Zuhorski, Plante Moran Realpoint Jade Warner, Clark Construction Company
MECHANICAL DEMOLITION NOTES
DEMOLITION KEYED NOTES
B104
CORRIDOR
B125
PASSAGE
B103
RAMP
B102
VESTIBULE
B101
STORAGE
B126
STORAGE
B127
MECHANICAL
B128
OUTDOOR
MECHANICAL
MD22.11B
PARTIAL ENLARGED
MECHANICAL PLAN AREA 'B'
DEMOLITION
JWG
NCS
STERLING HEIGHTS
HIGH SCHOOL
NOT TO SCALE
KEY PLAN
PARTIAL ENLARGED MECHANICAL PLAN AREA 'B' DEMOLITION
B
A C
D F
E G
H
SES
Strategic Energy Solutions
Phone 248.399.1900 Fax 248.399.1901 www.sesnet.com
4000 W. Eleven Mile Road Berkley, MI 48072
SES Project #22 0758 05
DATE:
232012
DESIGN DEVELOPMENT
JOB NO.
SHEET NO.
CHECKED BY
REVISIONS
DRAWN BY
FINAL RECORD
CONSTRUCTION
PRELIMINARY
NOVEMBER 27, 2023
FX: 586.573.0822
PH: 586.573.4100
SUITE 209
www.WakelyAIA.com
WARREN, MICHIGAN 48093
30500 VAN DYKE AVENUE
ARCHITECTS
WAKELY ASSOCIATES, INC.
B O
N D
P R
O G
R
AM
W
AR
R
EN
C O
N
SO
LI
D
AT
ED
S C
H O
O
LS
BI
D
P
AC
KA
G
E #5
A
ADD No 01 12-05-23
HVAC GENERAL NOTES
KEYED NOTES
B104
CORRIDOR
B125
PASSAGE
B103
RAMP
B102
VESTIBULE
B101
STORAGE
B126
STORAGE
B127
MECHANICAL
B128
OUTDOOR
MECHANICAL
M22.11B
PARTIAL ENLARGED
MECHANICAL PLAN AREA 'B'
JWG
NCS
STERLING HEIGHTS
HIGH SCHOOL
NOT TO SCALE
KEY PLAN
B
A C
D F
E G
H
SES
Strategic Energy Solutions
Phone 248.399.1900 Fax 248.399.1901 www.sesnet.com
4000 W. Eleven Mile Road Berkley, MI 48072
SES Project #22 0758 05
DATE:
232012
DESIGN DEVELOPMENT
JOB NO.
SHEET NO.
CHECKED BY
REVISIONS
DRAWN BY
FINAL RECORD
CONSTRUCTION
PRELIMINARY
NOVEMBER 27, 2023
FX: 586.573.0822
PH: 586.573.4100
SUITE 209
www.WakelyAIA.com
WARREN, MICHIGAN 48093
30500 VAN DYKE AVENUE
ARCHITECTS
WAKELY ASSOCIATES, INC.
B O
N D
P R
O G
R
AM
W
AR
R
EN
C O
N
SO
LI
D
AT
ED
S C
H O
O
LS
BI
D
P
AC
KA
G
E #5
A
PARTIAL ENLARGED MECHANICAL PLAN AREA 'B'
FIELD APPLIED METAL JACKETING
OVER PIPE INSULATION
PS
PS
CHILLED WATER SYSTEM DEMOLITION PIPING DIAGRAM
PS
PS
CHILLED WATER SYSTEM PIPING DIAGRAM
PACKAGED AIR COOLED LIQUID CHILLER SCHEDULE
PUMP SCHEDULE
M22.50
MECHANICAL DETAILS AND
SCHEDULES
JWG
NCS
STERLING HEIGHTS
HIGH SCHOOL
SES
Strategic Energy Solutions
Phone 248.399.1900 Fax 248.399.1901 www.sesnet.com
4000 W. Eleven Mile Road Berkley, MI 48072
SES Project #22 0758 05
DATE:
232012
DESIGN DEVELOPMENT
JOB NO.
SHEET NO.
CHECKED BY
REVISIONS
DRAWN BY
FINAL RECORD
CONSTRUCTION
PRELIMINARY
NOVEMBER 27, 2023
FX: 586.573.0822
PH: 586.573.4100
SUITE 209
www.WakelyAIA.com
WARREN, MICHIGAN 48093
30500 VAN DYKE AVENUE
ARCHITECTS
WAKELY ASSOCIATES, INC.
B O
N D
P R
O G
R
AM
W
AR
R
EN
C O
N
SO
LI
D
AT
ED
S C
H O
O
LS
BI
D
P
AC
KA
G
E #5
A
| 2023.12.06 - ADDENDUM No. 1 - Write Up |
| 2023.12.05 BP5A Addendum 1 Narrative |
| 2023.12.05 BP5A Bid Set Drawings |
| Mechanical |
| MD22.11B |
| M22.11B |
| M22.50 |
File details come from the government source that posted it. Updated .