2022-041565 - Addendum - Two.pdf
PDF 197 KB Posted
- Solicitation number
- IFB 410 2022-041565 3
- Issued by
- Palm Beach County, Florida
About this file
This is an addendum document issued by the Board of County Commissioners, Palm Beach County, Florida, Facilities Development and Operations Department, Capital Improvement Division for Project Number 2022-041565, Mid Western Service Center - Flooring Replacement. Addendum Two, issued on April 4, 2023, modifies the original bid documents and serves as a binding part of the contract documents. Bidders are required to acknowledge receipt of this addendum on the Bid Proposal Form, with failure to do so potentially resulting in disqualification.
The addendum specifically amends Attachment C, Scope of Work, by deleting section "c" in its entirety and replacing it with a revised requirement to install new 6-inch vinyl baseboard according to manufacturer's instructions with color to be determined (TBD). Bidders must ensure that this Addendum Two and any previously issued addenda are signed in the acknowledgment of receipt section, attached to the bid forms, and incorporated into the contract documents.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADD2 - 1
BOARD OF COUNTY COMMISSIONERS
PALM BEACH COUNTY, FLORIDA
FACILITIES DEVELOPMENT AND OPERATIONS DEPARTMENT
CAPITAL IMPROVEMENT DIVISION
PROJECT NAME: Mid Western Service Center - Flooring Replacement
PROJECT NUMBER: 2022-041565
ADDENDUM NUMBER: TWO
DATE OF ISSUANCE: 4/4/2023
TO: Prospective Bidders
This addendum forms a part of the contract documents, modifies the original bid documents and shall be as binding as if contained therein. Acknowledge receipt of this addendum in the space provided on the "Bid Proposal Form". Failure to do so may subject the Bidder to disqualification.
This Addendum consists of one (1) page.
CHANGE TO IFQ/B ATTACHMENT C
1. 2. SCOPE OF WORK, delete “c” in its entirety and replace with the following:
c. Install new 6 inch vinyl baseboard according to manufacturer’s instructions, color to be determined (TBD).
IT IS REQUIRED THAT THIS ADDENDUM NO. TWO (2), AND ANY PREVIOUSLY
ISSUED ADDENDUM(S), BE SIGNED IN THE ACKNOWLEDGMENT OF RECEIPT
BELOW, AND ATTACHED TO THE BID FORMS AND BECOMES PART OF BID
FORMS AND CONTRACT DOCUMENTS.
ACKNOWLEDGMENT OF RECEIPT: _____________________________________
END OF ADDENDUM