2021103 Pay Item Worksheet.xlsx
XLSX spreadsheet 22 KB Posted
- Solicitation number
- IFB 360 2021103 3
- Issued by
- Palm Beach County, Florida
About this file
This is a Pay Item Worksheet for the Military Trail & Golf Road Intersection Improvement Project (PBC Project #2021103) managed by the Florida Department of Transportation (FDOT). The project encompasses roadway improvements at the intersection of Military Trail and Golf Road in Florida, with bid items including mobilization, maintenance of traffic, inlet protection systems, clearing and grubbing, excavation, embankment work, base preparation, asphalt milling and paving, and inlet installation. Specific quantities are listed for each line item, including 1,025 cubic yards of regular excavation, 51 cubic yards of compacted embankment, 2,061 square yards of optional base, 7,453 square yards of existing asphalt to be milled, 147 tons of Superpave asphalt concrete, 510 tons of asphalt concrete friction course, and inlet construction work.
The worksheet presents a standardized FDOT pay item format with unit prices and total amounts currently shown as zero, indicating this is a preliminary bid proposal document awaiting contractor pricing. All line items are designated with FDOT standard item numbers and descriptions following Florida Department of Transportation specifications. The bid proposal structure allows contractors to submit unit prices for each itemized component, with the total project cost determined by multiplying quantities by submitted unit prices. This worksheet serves as the pricing mechanism through which contractors will submit their bids for the intersection improvement project.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2021103
| BID PROPOSAL | ||||||
| MILITARY TRAIL AND GOLF ROAD INTERSECTION IMPROVEMENTS | ||||||
| CONTRACT | ||||||
| PBC PROJECT #2021103 | ||||||
| # | FDOT ITEM NUMBER | ITEM DESCRIPTION | QTY | UNITS | UNIT PRICE | AMOUNT |
| ROADWAY ITEMS | ||||||
| 1 | 0101 1 | Mobilization | 1 | LS | $ - 0 | |
| 2 | 0102 1 | Maintenance Of Traffic (Including Ped. MOT) | 1 | LS | $ - 0 | |
| 3 | 0104 18 | Inletprotection System | 5 | EA | $ - 0 | |
| 4 | 0110 1 1 | Clearing and Grubbing | 1 | LS | $ - 0 | |
| 5 | 0120 1 | Regular Excavation | 1,025 | CY | $ - 0 | |
| 6 | 0120 6 | Embankment (Compacted In Place) | 51 | CY | $ - 0 | |
| 7 | 0285 713 | Optional Base, Base Group 13 | 2,061 | SY | $ - 0 | |
| 8 | 0327 70 1 | Mill Existing Asphalt Pavement, 1" Avg Depth | 7,453 | SY | $ - 0 | |
| 9 | 0334 1 13 | Superpave Asphalt Concrete (Traffic C) (1.5" ) | 147 | TN | $ - 0 | |
| 10 | 0337 7 82 | Asphalt Concrete Friction Course (1.0") (FC-9.5) | 510 | TN | $ - 0 | |
| 11 | 0425 1521 | Inlets, Ditch Bottom, Type C, <10' | 2 | EA | $ - 0 | |
| 12 | 0425 1910 | Inlets, Closed Flume | 2 | EA | $ - 0 | |
| 13 | 0425 5 | Adjust Drainage Manhole | 1 | EA | $ - 0 | |
| 14 | 0430 174115 | RCP Pipe Culvert (15") | 5 | LF | $ - 0 | |
| 15 | 0430 174118 | HDPE Pipe Culvert (18") | 62 | LF | $ - 0 | |
| 16 | 0443 70 3 | French Drain (18" HDPE) 4' Wide | 70 | LF | $ - 0 | |
| 17 | 0520 1 10 | Concrete Curb and Gutter (Type F) | 815 | LF | $ - 0 | |
| 18 | 0520 70 | Concrete Traffic Seperator, Variable Width (5" Thick) | 182 | SY | $ - 0 | |
| 19 | 0522 1 | Concrete Sidewalk (4" Thick) | 3 | SY | $ - 0 | |
| 20 | 0522 2 | Concrete Sidewalk (6" Thick) | 17 | SY | $ - 0 | |
| 21 | 0570 1 2 | Sodding | 1,619 | SY | $ - 0 | |
| SUBTOTAL (ROADWAY) | $ - 0 | |||||
| CONTINGENCY ITEMS | ||||||
| 22 | 0102 14 | Traffic Control Officer (Non MOT) | 20 | HR | $ - 0 | |
| 23 | 0102 99 | Changeable (Variable Message) (Non MOT) | 7 | ED | $ - 0 | |
| 24 | 0121 70 | Flowable Fill | 1 | CY | $ - 0 | |
| 25 | 0425 5 | Adjust Manhole (Utilities) | 3 | EA | $ - 0 | |
| 26 | N/A | Storm Sewer Pumping (Exist.) (24" or Less) (See SP's) | 544 | LF | $ - 0 | |
| 27 | N/A | Storm Sewer Cleaning (Exist.) (24" or Less) (See SP's) | 544 | LF | $ - 0 | |
| 28 | N/A | Remove and Reset Fence | 500 | LF | $ - 0 | |
| 29 | N/A | Temporary Fence | 150 | LF | $ - 0 | |
| 30 | 0400 1 15 | Class I Concrete Miscellaneous | 10 | CY | $ - 0 | |
| 31 | N/A | Premium For Conflict Condition | 1 | EA | $ - 0 | |
| SUBTOTAL (CONTINGENCY) | $ - 0 | |||||
| TOTAL BID | $ - 0 |
| THE COUNTY DOES NOT GUARANTEE THE ACCURACY OF THE FORMULAS AND EXTENSIONS USED IN THIS SPREADSHEET. | ||
| THE ITEMS AND QUANTITIES ABOVE, SHALL GOVERN OVER THE PLANS. | ||
| PAY ITEM FOOTNOTES IN CONSTRUCTION PLANS SHALL ALSO BE INCLUDED IN ITEM UNIT PRICE. | ||
| Note # | FDOT Item # | PAY ITEM FOOTNOTES |
| 1 | All | All costs for Maintenance of Traffic (MOT) and mobilization shall be considered incidental to, and shall be included in, unit prices for the pay items. |
| 2 | All | All items shall include cost to furnish and install unless otherwise noted. |
| 3 | All | FDOT Item numbers are for use in determining eligibility for price adjustment per General Provision 9-2 only. |
| 4 | 0102 1 | Includes all items for maintenance of traffic which are not included for payment under separate items. includes the preparation of temporary traffic control plans. Includes pedestrian maintenance of traffic in accordance with the specifications. Includes temporary pavement markings & signal. |
| 5 | 0101 1 | Includes removal of existing, drainage structures & pipes, culverts, signs, fence, trees, hedge, curbs, sidewalks, asphalt, base, concrete, guardrail, temporary construction detours, capping or modifying monitoring wells and any other items to be removed that are not specifically covered under another separate pay item. Includes tree removal and trimming for utility installation. Includes all saw cutting as shown on the plans or as directed by the engineer. |
| 6 | 0285 713 | Includes cost of 12" thick compaction of subgrade per FDOT standards. |
| 7 | 0327 70 1 | Includes bituminous material, prime coat and tack coat, as required. Includes removal of existing rpm's, saw cutting and removal of existing asphalt at butt joint, tie-in existing pavement. |
| 0334 1 13 | ||
| 0337 7 82 | ||
| 8 | 0425 1521 | Items include saw-cutting and removal of existing pipe, core drilling or concrete collars to join new pipe to existing pipe, and all repair/restoration of existing facilities and surfaces as required, including any/all shoring, sheeting and bracing and/or trench boxes as required for construction or as directed by the engineer. Includes the cost of fabrication, furnishing and installing all components of storm water control structure(s) as detailed in the plans. Includes the cost of all labor and material for “open-cut” pavement repairs. The cost of pipe shall include the cost of back filling required over pipes to finished grades as shown on the plans. |
| 0425 1910 | ||
| 0425 5 | ||
| 0430 174115 | ||
| 0430 174118 | ||
| 0443 70 3 | ||
| 9 | 0520 1 10 | Includes the cost of curb pad, flared end, modified type F curb and gutter, and engraving of curb face. |
| 10 | 0520 70 | Includes the cost of stamped concrete. |
| 11 | 0522 1 | The cost of detectable warning surfaces and ADA ramps are included in the cost of this pay item. Includes cost of concrete slabs. |
| 0522 2 |
&"Times New Roman,Bold"&12PROPOSAL FORM
&"Times New Roman,Bold"&12P-&P