2021 02 24 Atch 2 SchedOfRates.xlsx

XLSX spreadsheet 58 KB Posted

Attached to
S&RTS Mannheim, Germany Federal contract opportunity
Solicitation number
HTC71121QR008
Issued by
Department of Defense United States Transportation Command

View the file

Other files for this federal contract opportunity

Other files attached to S&RTS Mannheim, Germany, newest first.
File Type Posted
2021 03 29 Atch 2 RevisedSchedOfRatesMannheim.xlsx XLSX spreadsheet
2021 03 29 Atch 2 RevisedSchedOfRatesMannheim.xlsx XLSX spreadsheet
2021 03 29 MannheimAmendment0002 21QR0080002.pdf PDF
2021 03 22 RFQQuesAnsMannheim 21R R008.pdf PDF
2021 03 04 Atch 4 TechnicalWksheet 4 March 21.docx DOCX document
2021 03 04 Mannheim Amendment 0001 21QR008.pdf PDF
2021 02 24 Atch 1 PerfWorkStatement.pdf PDF
2021 02 24 Atch 3 - SRTS Gen Compliance Tool.xlsx XLSX spreadsheet
2021 02 24 Atch 6 PlanforEssentialSvs.docx DOCX document
2021 02 24 Atch 4 TechnicalWksheet.docx DOCX document
2021 02 24 Atch 5 - RFQ Information Sheet.docx DOCX document
2021 02 24 RFQ Mannheim.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mannheim

UNCLASSIFIED // FOR OFFICIAL USE ONLY - FOUO
STEVEDORING & RELATED TERMINAL SERVICESPERIOD OF PERFORMANCE:1 Jul 2021through31 Dec 2026(including 6 mo extension, if applicable)
LOCATION:Port of Mannheim, Germanyinput start dateinput final end date
Attachment #5-YEAR TOTAL:$ 300,000.00
6-MONTH EXTENTION TOTAL:$ 30,000.00
5-YEAR + 6-MONTH EXT. WITH CEILING (25%):$ 412,500.00
Line ItemCategoryScheduleCommodityDescriptionUnit of DurationEstimated DurationUnit of MeasureUnit PriceUnit Quantity**Unit QuanityExtended Price
1Commodity1A1LOAD VESSEL40aGENERAL CARGO (Breakbulk) NOT OTHERWISE SPECIFIED (NOS) | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))MTON$ - 032.00160.00$ - 0
2Commodity1A1LOAD VESSEL40bGENERAL CARGO (Breakbulk) NOT OTHERWISE SPECIFIED (NOS) | LO/LO - by lift with equipment other than described in 40aMTON$ - 032.00160.00$ - 0
3Commodity1A1LOAD VESSEL44aCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | LO/LO - Shore Crane (Gantry or Mobile Crane (i.e. Gottwald)EA$ - 020100.00$ - 0
4Commodity1A1LOAD VESSEL44cCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA$ - 020100.00$ - 0
5Commodity1A1LOAD VESSEL45aMILVAN-CONTAINER 20' - 40' (TEU configured) PACKED W/ NON-EXPLOSIVES | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA$ - 020100.00$ - 0
6Commodity1A1LOAD VESSEL45cMILVAN-CONTAINER 20' - 40' (TEU configured ) PACKED W/ NON-EXPLOSIVES | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA$ - 020100.00$ - 0
7Commodity1A1LOAD VESSEL60aMEDIUM VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 030150.00$ - 0
8Commodity1A1LOAD VESSEL60cMEDIUM VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 030150.00$ - 0
9Commodity1A1LOAD VESSEL60dMEDIUM TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 030150.00$ - 0
10Commodity1A1LOAD VESSEL60eMEDIUM VEHICLES| TO/TO - Inoperable Vehicle TowedEA$ - 01575.00$ - 0
11Commodity1A1LOAD VESSEL61aLIGHT VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 030150.00$ - 0
12Commodity1A1LOAD VESSEL61cLIGHT VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 030150.00$ - 0
13Commodity1A1LOAD VESSEL61dLIGHT TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 030150.00$ - 0
14Commodity1A1LOAD VESSEL61eLIGHT VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 01575.00$ - 0
15Commodity1A1LOAD VESSEL67aHEAVY VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 030150.00$ - 0
16Commodity1A1LOAD VESSEL67cHEAVY VEHICLES | RO/RO - Vehicle rolling under Own Power by rampEA$ - 030150.00$ - 0
17Commodity1A1LOAD VESSEL67dHEAVY TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 030150.00$ - 0
18Commodity1A1LOAD VESSEL67eHEAVY VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 01575.00$ - 0
TOTAL 1A1 - Loading Vessel$ - 0
19Commodity1A2DISCHARGE VESSEL40aGENERAL CARGO (Breakbulk) NOT OTHERWISE SPECIFIED (NOS) | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))MTON$ - 032.00160.00$ - 0
20Commodity1A2DISCHARGE VESSEL40bGENERAL CARGO (Breakbulk) NOT OTHERWISE SPECIFIED (NOS) | LO/LO - by lift with equipment other than described in 40aMTON$ - 032.00160.00$ - 0
21Commodity1A2DISCHARGE VESSEL44aCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA$ - 020100.00$ - 0
22Commodity1A2DISCHARGE VESSEL44cCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA$ - 020100.00$ - 0
23Commodity1A2DISCHARGE VESSEL45aMILVAN-CONTAINER 20' - 40' (TEU configured) PACKED W/ NON-EXPLOSIVES | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA$ - 020100.00$ - 0
24Commodity1A2DISCHARGE VESSEL45cMILVAN-CONTAINER 20' - 40' (TEU configured ) PACKED W/ NON-EXPLOSIVES | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA$ - 020100.00$ - 0
25Commodity1A2DISCHARGE VESSEL60aMEDIUM VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 030150.00$ - 0
26Commodity1A2DISCHARGE VESSEL60cMEDIUM VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 030150.00$ - 0
27Commodity1A2DISCHARGE VESSEL60dMEDIUM TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 030150.00$ - 0
28Commodity1A2DISCHARGE VESSEL60eMEDIUM VEHICLES| TO/TO - Inoperable Vehicle TowedEA$ - 01575.00$ - 0
29Commodity1A2DISCHARGE VESSEL61aLIGHT VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 030150.00$ - 0
30Commodity1A2DISCHARGE VESSEL61cLIGHT VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 030150.00$ - 0
31Commodity1A2DISCHARGE VESSEL61dLIGHT TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 030150.00$ - 0
32Commodity1A2DISCHARGE VESSEL61eLIGHT VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 01575.00$ - 0
33Commodity1A2DISCHARGE VESSEL67aHEAVY VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 030150.00$ - 0
34Commodity1A2DISCHARGE VESSEL67cHEAVY VEHICLES | RO/RO - Vehicle rolling under Own Power by rampEA$ - 030150.00$ - 0
35Commodity1A2DISCHARGE VESSEL67dHEAVY TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 030150.00$ - 0
36Commodity1A2DISCHARGE VESSEL67eHEAVY VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 01575.00$ - 0
TOTAL 1A2 - Discharge Vessel$ - 0
37Commodity1B1LOAD RAIL40aGENERAL CARGO (Breakbulk) NOT OTHERWISE SPECIFIED (NOS) | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))MTON$ - 032.00160.00$ - 0
38Commodity1B1LOAD RAIL40bGENERAL CARGO (Breakbulk) NOT OTHERWISE SPECIFIED (NOS) | LO/LO - by lift with equipment other than described in 40aMTON$ - 032.00160.00$ - 0
39Commodity1B1LOAD RAIL44aCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA$ - 020100.00$ - 0
40Commodity1B1LOAD RAIL44cCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA$ - 020100.00$ - 0
41Commodity1B1LOAD RAIL45aMILVAN-CONTAINER 20' - 40' (TEU configured) PACKED W/ NON-EXPLOSIVES | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA$ - 020100.00$ - 0
42Commodity1B1LOAD RAIL45cMILVAN-CONTAINER 20' - 40' (TEU configured ) PACKED W/ NON-EXPLOSIVES | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA$ - 020100.00$ - 0
43Commodity1B1LOAD RAIL60aMEDIUM VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 030150.00$ - 0
44Commodity1B1LOAD RAIL60cMEDIUM VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 030150.00$ - 0
45Commodity1B1LOAD RAIL60dMEDIUM TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 030150.00$ - 0
46Commodity1B1LOAD RAIL60eMEDIUM VEHICLES| TO/TO - Inoperable Vehicle TowedEA$ - 01575.00$ - 0
47Commodity1B1LOAD RAIL61aLIGHT VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 030150.00$ - 0
48Commodity1B1LOAD RAIL61cLIGHT VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 030150.00$ - 0
49Commodity1B1LOAD RAIL61dLIGHT TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 030150.00$ - 0
50Commodity1B1LOAD RAIL61eLIGHT VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 01575.00$ - 0
51Commodity1B1LOAD RAIL67aHEAVY VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 030150.00$ - 0
52Commodity1B1LOAD RAIL67cHEAVY VEHICLES | RO/RO - Vehicle rolling under Own Power by rampEA$ - 030150.00$ - 0
53Commodity1B1LOAD RAIL67dHEAVY TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 030150.00$ - 0
54Commodity1B1LOAD RAIL67eHEAVY VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 01575.00$ - 0
TOTAL 1B1 Load Railcars$ - 0
55Commodity1B2DISCHARGE RAIL40aGENERAL CARGO (Breakbulk) NOT OTHERWISE SPECIFIED (NOS) | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))MTON$ - 032.00160.00$ - 0
56Commodity1B2DISCHARGE RAIL40bGENERAL CARGO (Breakbulk) NOT OTHERWISE SPECIFIED (NOS) | LO/LO - by lift with equipment other than described in 40aMTON$ - 032.00160.00$ - 0
57Commodity1B2DISCHARGE RAIL44aCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA$ - 020100.00$ - 0
58Commodity1B2DISCHARGE RAIL44cCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA$ - 020100.00$ - 0
59Commodity1B2DISCHARGE RAIL45aMILVAN-CONTAINER 20' - 40' (TEU configured) PACKED W/ NON-EXPLOSIVES | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA$ - 020100.00$ - 0
60Commodity1B2DISCHARGE RAIL45cMILVAN-CONTAINER 20' - 40' (TEU configured ) PACKED W/ NON-EXPLOSIVES | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA$ - 020100.00$ - 0
61Commodity1B2DISCHARGE RAIL60aMEDIUM VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 030150.00$ - 0
62Commodity1B2DISCHARGE RAIL60cMEDIUM VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 030150.00$ - 0
63Commodity1B2DISCHARGE RAIL60dMEDIUM TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 030150.00$ - 0
64Commodity1B2DISCHARGE RAIL60eMEDIUM VEHICLES| TO/TO - Inoperable Vehicle TowedEA$ - 01575.00$ - 0
65Commodity1B2DISCHARGE RAIL61aLIGHT VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 030150.00$ - 0
66Commodity1B2DISCHARGE RAIL61cLIGHT VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 030150.00$ - 0
67Commodity1B2DISCHARGE RAIL61dLIGHT TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 030150.00$ - 0
68Commodity1B2DISCHARGE RAIL61eLIGHT VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 01575.00$ - 0
69Commodity1B2DISCHARGE RAIL67aHEAVY VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 030150.00$ - 0
70Commodity1B2DISCHARGE RAIL67cHEAVY VEHICLES | RO/RO - Vehicle rolling under Own Power by rampEA$ - 030150.00$ - 0
71Commodity1B2DISCHARGE RAIL67dHEAVY TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 030150.00$ - 0
72Commodity1B2DISCHARGE RAIL67eHEAVY VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 01575.00$ - 0
TOTAL 1B2 Discharge Railcars$ - 0
73Commodity1B3LOAD TRUCKS40aGENERAL CARGO (Breakbulk) NOT OTHERWISE SPECIFIED (NOS) | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))MTON$ - 01.005.00$ - 0
74Commodity1B3LOAD TRUCKS40bGENERAL CARGO (Breakbulk) NOT OTHERWISE SPECIFIED (NOS) | LO/LO - by lift with equipment other than described in 40aMTON$ - 01.005.00$ - 0
75Commodity1B3LOAD TRUCKS44aCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA$ - 020.00100.00$ - 0
76Commodity1B3LOAD TRUCKS44cCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA$ - 020100.00$ - 0
77Commodity1B3LOAD TRUCKS45aMILVAN-CONTAINER 20' - 40' (TEU configured) PACKED W/ NON-EXPLOSIVES | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA$ - 020100.00$ - 0
78Commodity1B3LOAD TRUCKS45cMILVAN-CONTAINER 20' - 40' (TEU configured ) PACKED W/ NON-EXPLOSIVES | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA$ - 020100.00$ - 0
79Commodity1B3LOAD TRUCKS60aMEDIUM VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 030150.00$ - 0
80Commodity1B3LOAD TRUCKS60cMEDIUM VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 030150.00$ - 0
81Commodity1B3LOAD TRUCKS60dMEDIUM TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 030150.00$ - 0
82Commodity1B3LOAD TRUCKS60eMEDIUM VEHICLES| TO/TO - Inoperable Vehicle TowedEA$ - 030150.00$ - 0
83Commodity1B3LOAD TRUCKS61bLIGHT VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA$ - 030150.00$ - 0
84Commodity1B3LOAD TRUCKS61cLIGHT VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 030150.00$ - 0
85Commodity1B3LOAD TRUCKS61dLIGHT TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 030150.00$ - 0
86Commodity1B3LOAD TRUCKS61eLIGHT VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 030150.00$ - 0
87Commodity1B3LOAD TRUCKS67aHEAVY VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 030150.00$ - 0
88Commodity1B3LOAD TRUCKS67cHEAVY VEHICLES | RO/RO - Vehicle rolling under Own Power by rampEA$ - 030150.00$ - 0
89Commodity1B3LOAD TRUCKS67dHEAVY TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 030150.00$ - 0
90Commodity1B3LOAD TRUCKS67eHEAVY VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 030150.00$ - 0
TOTAL 1B3 Loading Trucks$ - 0
91Commodity1B4DISCHARGE TRUCKS40aGENERAL CARGO (Breakbulk) NOT OTHERWISE SPECIFIED (NOS) | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))MTON$ - 01.005.00$ - 0
92Commodity1B4DISCHARGE TRUCKS40bGENERAL CARGO (Breakbulk) NOT OTHERWISE SPECIFIED (NOS) | LO/LO - by lift with equipment other than described in 40aMTON$ - 01.005.00$ - 0
93Commodity1B4DISCHARGE TRUCKS44aCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA$ - 020.00100.00$ - 0
94Commodity1B4DISCHARGE TRUCKS44cCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA$ - 020100.00$ - 0
95Commodity1B4DISCHARGE TRUCKS45aMILVAN-CONTAINER 20' - 40' (TEU configured) PACKED W/ NON-EXPLOSIVES | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA$ - 020100.00$ - 0
96Commodity1B4DISCHARGE TRUCKS45cMILVAN-CONTAINER 20' - 40' (TEU configured ) PACKED W/ NON-EXPLOSIVES | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA$ - 020100.00$ - 0
97Commodity1B4DISCHARGE TRUCKS60aMEDIUM VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 030150.00$ - 0
98Commodity1B4DISCHARGE TRUCKS60cMEDIUM VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 030150.00$ - 0
99Commodity1B4DISCHARGE TRUCKS60dMEDIUM TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 030150.00$ - 0
100Commodity1B4DISCHARGE TRUCKS60eMEDIUM VEHICLES| TO/TO - Inoperable Vehicle TowedEA$ - 030150.00$ - 0
101Commodity1B4DISCHARGE TRUCKS61bLIGHT VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA$ - 030150.00$ - 0
102Commodity1B4DISCHARGE TRUCKS61cLIGHT VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 030150.00$ - 0
103Commodity1B4DISCHARGE TRUCKS61dLIGHT TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 030150.00$ - 0
104Commodity1B4DISCHARGE TRUCKS61eLIGHT VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 030150.00$ - 0
105Commodity1B4DISCHARGE TRUCKS67aHEAVY VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 030150.00$ - 0
106Commodity1B4DISCHARGE TRUCKS67cHEAVY VEHICLES | RO/RO - Vehicle rolling under Own Power by rampEA$ - 030150.00$ - 0
107Commodity1B4DISCHARGE TRUCKS67dHEAVY TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 030150.00$ - 0
108Commodity1B4DISCHARGE TRUCKS67eHEAVY VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 030150.00$ - 0
TOTAL 1B4 Discharge Trucks$ - 0
109Commodity1CRECEPTION ONLY40GENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) (Breakbulk)MTON$ - 01.005.00$ - 0
110Commodity1CRECEPTION ONLY44CONTAINERS OTHER THAN TEU - SINGLE - W/ISO - Quadcons, Tricons, BiconsEA$ - 020100.00$ - 0
111Commodity1CRECEPTION ONLY45MILVAN-CONTAINERS 20'/40' PACKED W/ NON-EXPLOSIVES - ISO (TEU configured) Conex, Quadcons, Tricons, Bicons ))EA$ - 020100.00$ - 0
112Commodity1CRECEPTION ONLY60MEDIUM VEHICLES OR TRAILERSEA$ - 030150.00$ - 0
113Commodity1CRECEPTION ONLY61LIGHT VEHICLES OR TRAILERSEA$ - 030150.00$ - 0
114Commodity1CRECEPTION ONLY67HEAVY VEHICLES OR TRAILERSEA$ - 030150.00$ - 0
TOTAL 1C Reception Only$ - 0
115Commodity1DDISPOSITION ONLY40GENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) (Breakbulk)MTON$ - 01.005.00$ - 0
116Commodity1DDISPOSITION ONLY44CONTAINERS OTHER THAN TEU - SINGLE - W/ISO - Quadcons, Tricons, BiconsEA$ - 020100.00$ - 0
117Commodity1DDISPOSITION ONLY45MILVAN-CONTAINERS 20'/40' PACKED W/ NON-EXPLOSIVES - ISO (TEU configured) Conex, Quadcons, Tricons, Bicons ))EA$ - 020100.00$ - 0
118Commodity1DDISPOSITION ONLY60MEDIUM VEHICLES OR TRAILERSEA$ - 030150.00$ - 0
119Commodity1DDISPOSITION ONLY61LIGHT VEHICLES OR TRAILERSEA$ - 030150.00$ - 0
120Commodity1DDISPOSITION ONLY67HEAVY VEHICLES OR TRAILERSEA$ - 030150.00$ - 0
TOTAL 1D Disposition ONLY$ - 0
121Manhours2EXTRA LABOR (XL)Stright Time[ Dayshift ] - GENERAL LABOR: LONGSHOREMAN | STEVEDORE | LASHER | LINE HANDLERSHR$ - 015.00$ - 0
122Manhours2EXTRA LABOR (XL)Stright Time[ Dayshift ] - SKILLED LABOR (OPERATORS): FORKLIFT | HEAD DRIVERHR$ - 015.00$ - 0
123Manhours2EXTRA LABOR (XL)Stright Time[ Dayshift ] - SKILLED LABOR (OPERATORS): CRANEMANHR$ - 015.00$ - 0
124Manhours2EXTRA LABOR (XL)Stright Time[ Dayshift ] - FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR$ - 015.00$ - 0
125Manhours2EXTRA LABOR (XL)Stright Time[ Saturday ] GENERAL LABOR: LONGSHOREMAN | LASHER | LINE HANDLERSHR$ - 015.00$ - 0
126Manhours2EXTRA LABOR (XL)Stright Time[ Saturday ] - SKILLED LABOR (OPERATORS): FORKLIFT | HEAD DRIVERHR$ - 015.00$ - 0
127Manhours2EXTRA LABOR (XL)Stright Time[ Saturday ] - SKILLED LABOR (OPERATORS): CRANEMANHR$ - 015.00$ - 0
128Manhours2EXTRA LABOR (XL)Stright Time[ Saturday ] - FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR$ - 015.00$ - 0
129Manhours2EXTRA LABOR (XL)Stright Time[ Sunday ] - GENERAL LABOR: LONGSHOREMAN | LASHER | LINE HANDLERSHR$ - 015.00$ - 0
130Manhours2EXTRA LABOR (XL)Stright Time[ Sunday ] - SKILLED LABOR (OPERATORS): FORKLIFT | HEAD DRIVERHR$ - 015.00$ - 0
131Manhours2EXTRA LABOR (XL)Stright Time[ Sunday ] - - SKILLED LABOR (OPERATORS): CRANEMANHR$ - 015.00$ - 0
132Manhours2EXTRA LABOR (XL)Stright Time[ Sunday ] - FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR$ - 015.00$ - 0
133Manhours2EXTRA LABOR (XL)Stright Time[ Holiday ] - GENERAL LABOR: LONGSHOREMAN | LASHER | LINE HANDLERSHR$ - 015.00$ - 0
134Manhours2EXTRA LABOR (XL)Stright Time[ Holiday ]- SKILLED LABOR (OPERATORS): FORKLIFT | HEAD DRIVERHR$ - 015.00$ - 0
135Manhours2EXTRA LABOR (XL)Stright Time[ Holiday ]- SKILLED LABOR (OPERATORS): CRANEMANHR$ - 015.00$ - 0
136Manhours2EXTRA LABOR (XL)Stright Time[ Holiday ]- FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR$ - 015.00$ - 0
TOTAL 2 Extra Labor (XL)$ - 0
137Manhours3ADETENTIONStright Time[ Dayshift ] - GENERAL LABOR: LONGSHOREMAN | STEVEDORE | LASHER | LINE HANDLERSHR$ - 015.00$ - 0
138Manhours3ADETENTIONStright Time[ Dayshift ] - SKILLED LABOR (OPERATORS): FORKLIFT | HEAD DRIVERHR$ - 015.00$ - 0
139Manhours3ADETENTIONStright Time[ Dayshift ] - SKILLED LABOR (OPERATORS): CRANEMANHR$ - 015.00$ - 0
140Manhours3ADETENTIONStright Time[ Dayshift ] - FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR$ - 015.00$ - 0
141Manhours3ADETENTIONStright Time[ Saturday ] GENERAL LABOR: LONGSHOREMAN | LASHER | LINE HANDLERSHR$ - 015.00$ - 0
142Manhours3ADETENTIONStright Time[ Saturday ] - SKILLED LABOR (OPERATORS): FORKLIFT | HEAD DRIVERHR$ - 015.00$ - 0
143Manhours3ADETENTIONStright Time[ Saturday ] - SKILLED LABOR (OPERATORS): CRANEMANHR$ - 015.00$ - 0
144Manhours3ADETENTIONStright Time[ Saturday ] - FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR$ - 015.00$ - 0
145Manhours3ADETENTIONStright Time[ Sunday ] - GENERAL LABOR: LONGSHOREMAN | LASHER | LINE HANDLERSHR$ - 015.00$ - 0
146Manhours3ADETENTIONStright Time[ Sunday ] - SKILLED LABOR (OPERATORS): FORKLIFT | HEAD DRIVERHR$ - 015.00$ - 0
147Manhours3ADETENTIONStright Time[ Sunday ] - - SKILLED LABOR (OPERATORS): CRANEMANHR$ - 015.00$ - 0
148Manhours3ADETENTIONStright Time[ Sunday ] - FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR$ - 015.00$ - 0
149Manhours3ADETENTIONStright Time[ Holiday ] - GENERAL LABOR: LONGSHOREMAN | LASHER | LINE HANDLERSHR$ - 015.00$ - 0
150Manhours3ADETENTIONStright Time[ Holiday ]- SKILLED LABOR (OPERATORS): FORKLIFT | HEAD DRIVERHR$ - 015.00$ - 0
151Manhours3ADETENTIONStright Time[ Holiday ]- SKILLED LABOR (OPERATORS): CRANEMANHR$ - 015.00$ - 0
152Manhours3ADETENTIONStright Time[ Holiday ]- FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR$ - 015.00$ - 0
TOTAL 3A Detention$ - 0
153Manhours3BOVERTIME DIFFERENTIALSRegular OT[ Dayshift ] - GENERAL LABOR: LONGSHOREMAN | STEVEDORE | LASHER | LINE HANDLERSHR$ - 015.00$ - 0
154Manhours3BOVERTIME DIFFERENTIALSRegular OT[ Dayshift ] - SKILLED LABOR (OPERATORS): FORKLIFT | HEAD DRIVERHR$ - 015.00$ - 0
155Manhours3BOVERTIME DIFFERENTIALSRegular OT[ Dayshift ] - SKILLED LABOR (OPERATORS): CRANEMANHR$ - 015.00$ - 0
156Manhours3BOVERTIME DIFFERENTIALSRegular OT[ Dayshift ] - FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR$ - 015.00$ - 0
157Manhours3BOVERTIME DIFFERENTIALSSaturday O/T[ Saturday ] GENERAL LABOR: LONGSHOREMAN | LASHER | LINE HANDLERSHR$ - 015.00$ - 0
158Manhours3BOVERTIME DIFFERENTIALSSaturday O/T[ Saturday ] - SKILLED LABOR (OPERATORS): FORKLIFT | HEAD DRIVERHR$ - 015.00$ - 0
159Manhours3BOVERTIME DIFFERENTIALSSaturday O/T[ Saturday ] - SKILLED LABOR (OPERATORS): CRANEMANHR$ - 015.00$ - 0
160Manhours3BOVERTIME DIFFERENTIALSSaturday O/T[ Saturday ] - FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR$ - 015.00$ - 0
161Manhours3BOVERTIME DIFFERENTIALSSunday O/T[ Sunday ] - GENERAL LABOR: LONGSHOREMAN | LASHER | LINE HANDLERSHR$ - 015.00$ - 0
162Manhours3BOVERTIME DIFFERENTIALSSunday O/T[ Sunday ] - SKILLED LABOR (OPERATORS): FORKLIFT | HEAD DRIVERHR$ - 015.00$ - 0
163Manhours3BOVERTIME DIFFERENTIALSSunday O/T[ Sunday ] - - SKILLED LABOR (OPERATORS): CRANEMANHR$ - 015.00$ - 0
164Manhours3BOVERTIME DIFFERENTIALSSunday O/T[ Sunday ] - FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR$ - 015.00$ - 0
165Manhours3BOVERTIME DIFFERENTIALSHoliday O/T[ Holiday ] - GENERAL LABOR: LONGSHOREMAN | LASHER | LINE HANDLERSHR$ - 015.00$ - 0
166Manhours3BOVERTIME DIFFERENTIALSHoliday O/T[ Holiday ]- SKILLED LABOR (OPERATORS): FORKLIFT | HEAD DRIVERHR$ - 015.00$ - 0
167Manhours3BOVERTIME DIFFERENTIALSHoliday O/T[ Holiday ]- SKILLED LABOR (OPERATORS): CRANEMANHR$ - 015.00$ - 0
168Manhours3BOVERTIME DIFFERENTIALSHoliday O/T[ Holiday ]- FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR$ - 015.00$ - 0
TOTAL 3B Overtime Differentials$ - 0
169Manhours3CGUARANTEED TIMEStright Time[ Dayshift ] - GENERAL LABOR: LONGSHOREMAN | STEVEDORE | LASHER | LINE HANDLERSHR$ - 015.00$ - 0
170Manhours3CGUARANTEED TIMEStright Time[ Dayshift ] - SKILLED LABOR (OPERATORS): FORKLIFT | HEAD DRIVERHR$ - 015.00$ - 0
171Manhours3CGUARANTEED TIMEStright Time[ Dayshift ] - SKILLED LABOR (OPERATORS): CRANEMANHR$ - 015.00$ - 0
172Manhours3CGUARANTEED TIMEStright Time[ Dayshift ] - FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR$ - 015.00$ - 0
173Manhours3CGUARANTEED TIMEStright Time[ Saturday ] GENERAL LABOR: LONGSHOREMAN | LASHER | LINE HANDLERSHR$ - 015.00$ - 0
174Manhours3CGUARANTEED TIMEStright Time[ Saturday ] - SKILLED LABOR (OPERATORS): FORKLIFT | HEAD DRIVERHR$ - 015.00$ - 0
175Manhours3CGUARANTEED TIMEStright Time[ Saturday ] - SKILLED LABOR (OPERATORS): CRANEMANHR$ - 015.00$ - 0
176Manhours3CGUARANTEED TIMEStright Time[ Saturday ] - FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR$ - 015.00$ - 0
177Manhours3CGUARANTEED TIMEStright Time[ Sunday ] - GENERAL LABOR: LONGSHOREMAN | LASHER | LINE HANDLERSHR$ - 015.00$ - 0
178Manhours3CGUARANTEED TIMEStright Time[ Sunday ] - SKILLED LABOR (OPERATORS): FORKLIFT | HEAD DRIVERHR$ - 015.00$ - 0
179Manhours3CGUARANTEED TIMEStright Time[ Sunday ] - - SKILLED LABOR (OPERATORS): CRANEMANHR$ - 015.00$ - 0
180Manhours3CGUARANTEED TIMEStright Time[ Sunday ] - FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR$ - 015.00$ - 0
181Manhours3CGUARANTEED TIMEStright Time[ Holiday ] - GENERAL LABOR: LONGSHOREMAN | LASHER | LINE HANDLERSHR$ - 015.00$ - 0
182Manhours3CGUARANTEED TIMEStright Time[ Holiday ]- SKILLED LABOR (OPERATORS): FORKLIFT | HEAD DRIVERHR$ - 015.00$ - 0
183Manhours3CGUARANTEED TIMEStright Time[ Holiday ]- SKILLED LABOR (OPERATORS): CRANEMANHR$ - 015.00$ - 0
184Manhours3CGUARANTEED TIMEStright Time[ Holiday ]- FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR$ - 015.00$ - 0
TOTAL 3C Guaranteed Time$ - 0
CategoryScheduleCommodityDescriptionUnit of DurationEstimated DurationUnit of MeasureUnit PriceUnit QuantityUnit QuanityExtended Price
185Manhours4EQUIPMENT RENTAL (EQR)FORKLIFT, 3 Ton capacityHR1EA$ - 0525.00$ - 0
186Manhours4EQUIPMENT RENTAL (EQR)FORKLIFT, 3 Ton (to) 7 Ton capacityHR1EA$ - 0525.00$ - 0
187Manhours4EQUIPMENT RENTAL (EQR)CONTAINER HANDLER / top lift, 80,000 LB lifting capacityHR1EA$ - 01050.00$ - 0
188Manhours4EQUIPMENT RENTAL (EQR)YARD TRACTOR (HUSTLER, YARD DOG)HR1EA$ - 0315.00$ - 0
189Manhours4EQUIPMENT RENTAL (EQR)HEAVY DUTY MEDIUM TUG Master or TRACTORHR1EA$ - 01050.00$ - 0
190Manhours4EQUIPMENT RENTAL (EQR)HEAVY DUTY LARGE TUG Master or TRACTORHR1EA$ - 01050.00$ - 0
191Manhours4EQUIPMENT RENTAL (EQR)GENERATOR, 60 kilowattDY1EA$ - 015.00$ - 0
192Manhours4EQUIPMENT RENTAL (EQR)PREASURE WASHER 2500 PSI, with attachmentsDY1EA$ - 015.00$ - 0
193Manhours4EQUIPMENT RENTAL (EQR)LIGHT SETS, 1000 watt, trailer mounted, with Mast and GeneratorDY1EA$ - 0210.00$ - 0
TOTAL 4 Equipment Rental$ - 0
194Miscellaneous6PORT FACILITIESOFFICE SPACE, PORTABLE | see PWS for specific detailsMTH1SQFT$ - 0525.00$ - 0
195Miscellaneous6PORT FACILITIESGuard ShackDY1EA$ - 015.00$ - 0
196Miscellaneous6PORT FACILITIESTelephone - Landline | see PWS for specific detailsMTH1EA$ - 015.00$ - 0
197Miscellaneous6PORT FACILITIESInternet - High speed | see PWS for specific detailsMTH1EA$ - 015.00$ - 0
198Miscellaneous6PORT FACILITIESRadio communication equipmentDY1LOT$ - 015.00$ - 0
199Miscellaneous6PORT FACILITIESTarpaulins water proff see PWS specfic detailsDY1SQMT$ - 02001000.00$ - 0
200Miscellaneous6PORT FACILITIESPortable Latrines & Hand Washing Stations | see PWS for specific detailsDY1EA$ - 0840.00$ - 0
201Miscellaneous6PORT FACILITIESRefuse container | see PWS for specific detailsMTH1EA$ - 0525.00$ - 0
202Miscellaneous6PORT FACILITIESPortable FenceDY1MTR$ - 0100500.00$ - 0
203Miscellaneous6PORT FACILITIESConcrete BarriersDY1EA$ - 025125.00$ - 0
204Miscellaneous6PORT FACILITIESMobile Sanitary Restroom (MSR) TrailerMTH1EA$ - 015.00$ - 0
205Miscellaneous6PORT FACILITIESDelivery/Pickup of 2 ea 20 ft or 1 40 ft office containertrip1EA$ - 01050.00$ - 0
206Miscellaneous6PORT FACILITIESCONTAINER WALL 20FT- 40FT CONTAINERS (combination of both)DY1EA$ - 025125.00$ - 0
207Miscellaneous6PORT FACILITIESCONTAINER WALL 20'-40' Delivered, setup, and removal,EA$ - 025125.00$ - 0
TOTAL 6 Facilities$ - 0
208Miscellaneous7LUMBER / DUNNAGE / MATERIALS10x10 CM PC- CUT LUMBER- ISPM#CERTIFIEDMTR$ - 01050.00$ - 0
209Miscellaneous7LUMBER / DUNNAGE / MATERIALS10x15 CM PC- CUT LUMBER- ISPM#CERTIFIEDMTR$ - 01050.00$ - 0
210Miscellaneous7LUMBER / DUNNAGE / MATERIALSChockblocksEA$ - 01050.00$ - 0
TOTAL 7 Lumber/Dunnage/Materials$ - 0
211Miscellaneous8MISCELLANEOUSOUT-OF-POCKET POOLMTH12USD$ 5,000.0015.00$ 300,000.00
TOTAL Miscellanious OOP$ 300,000.00

Summary

OFFEROR NAME:
INSTRUCTIONS TO OFFEROR:
- Input Offeror Name in cell C1 above.
- Input unit rates in ALL yellow highlighted cells in the "Schedule" sheet (enter 0 if you do not wish to offer a price).
- Offeror should consider that all proposed unit rates will apply to the entire period of performance, to include options and extensions, upon award.
- This spreadsheet will populate the Total Evaluated Price based upon unit prices input in the highlighted cells of the "Schedule" sheet.
SUMMARY for all Port Locations
FOR OFFICIAL USE ONLY
MANNHEIM,GERMANY
5 Year PoP6-Month Ext.TOTAL
Schedule1A1LOADING VESSEL$ - 0$ - 0$ - 0
Schedule1A1aLASHING ONLY$ - 0$ - 0$ - 0
Schedule1A2DISCHARGE VESSEL$ - 0$ - 0$ - 0
Schedule1A2aUNLASHING ONLY$ - 0$ - 0$ - 0
Schedule1B1LOAD RAILCARS$ - 0$ - 0$ - 0
Schedule1B2DISCHARGE RAILCARS$ - 0$ - 0$ - 0
Schedule1B3LOADING TRUCKS$ - 0$ - 0$ - 0
Schedule1B4DISCHARGE TRAUCKS$ - 0$ - 0$ - 0
Schedule1CRECEPTION ONLY$ - 0$ - 0$ - 0
Schedule1DDISPOSITION ONLY$ - 0$ - 0$ - 0
Schedule1ESTUFFING/UNSTUFFING$ - 0$ - 0$ - 0
Schedule1FINTRA PORT TRANSFER$ - 0$ - 0$ - 0
Schedule1FaCROSS DOCKING$ - 0$ - 0$ - 0
Schedule2EXTRA LABOR$ - 0$ - 0$ - 0
Schedule3ADETENTION$ - 0$ - 0$ - 0
Schedule3BOVERTIME DIFFERENTIALS$ - 0$ - 0$ - 0
Schedule3CGUARANTEED TIME$ - 0$ - 0$ - 0
Schedule4EQUIPMENT RENTAL$ - 0$ - 0$ - 0
Schedule5STORAGE$ - 0$ - 0$ - 0
Schedule6FACILITIES$ - 0$ - 0$ - 0
Schedule7LUMBER / DUNNAGE$ - 0$ - 0$ - 0
Schedule8MISCELLANEOUS OOP$ 300,000.00$ 30,000.00$ 330,000.00
Schedule9INLAND TRANSPORTATION$ - 0$ - 0$ - 0
Schedule103PL SERVICES$ - 0$ - 0$ - 0

5-YEAR TOTAL: $ 300,000.00

6-MO EXT. TOTAL: $ 30,000.00

TOTAL PROPOSED PRICE (TPP): (5-YR + 6-MO EXT.) $ 330,000.00

CEILING: (25% of Total Proposed Price) $ 82,500.00

TOTAL LIFECYCLE: (5-YR + 6-MO EXT. + CEILING) $ 412,500.00

Definitions

UNCLASSIFIED // FOR OFFICIAL USE ONLY

WORKING HOURSSHIFT HOURS (as applicable)
Hours may be estimatedWorking Shift / Hoursoperating hours
Straight TimeBase wages before differentials are appliedDay Shift
Night shift
Regular8am to 5pm1st Shift
duty hours2nd Shift
3rd Shift
Regular OverBefore 8am and after 5pm4th Shift
Time (OT)
Swing / Hoot Owl
Meal HoursNoon to 1pm (may be premium meal hour)
6pm to 7-pmNormal work day hours
Midnight to 1am
6am to 7am** Note: Hours stated may be changed as operations or mission scope dictates.

UNITS OF MEASURE

MTONMeasurement Tons (measure of volume)1 MTON = 40 cubic feet (1.13 cubic meters)
HRHour = 1 HR = 60 minutes
DYDay = 1 DY = 24 hours
MTHMonth = 1 MTH = 30 days
EAEach
SQFTSquare Feet (measure of area)1' SQFT = 144'' inchs dimensions 12''x12''
SQMTSquare Meter (measure of area)1 SQFT = 0.0929 square meters
1 CFT = 1728 cubic inches 12"x12"x12"
BNDBundle
PCPiece (one each)
ROLLRoll ( roll of wire)
MIMile (measure of distance) = 1 Mile = 5280 feet ( 1,609.34 meters )
TRIPSTrip = 1 Trip, as described in the PWS (if applicable)
LTLong Ton = 1 LT = 2,240 pounds ( 1,016.05 kilograms )
LBSUS. Pounds = 1 LBS = 0.45 kilograms
KGkg = 1 kg = 2.204 pounds
MTONMTON recorded and billed to the sponsor will be applied to the gross cube (40 cubic feet = 1 MTON) of the container.

COMMODITY HANDLING METHODS (includes all standard lashing & Unlashing, blocking and bracing cargo)

LO/LOLift On / Lift Off - includes all standard lashing,( a ) Shore Crane Type (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))
& Unlashing, blocking and bracing cargo( b ) Ships Gear, Ships crane
RO/RORoll On / Roll Off - includes all standard lashing,( c ) Vehicle rolling under Own Power - Containers loaded by ramp
& Unlashing, blocking and bracing cargo
TO/TOTow On / Tow Off - includes all standard lashing,( d ) Trailers towed by Contractor Equipment or Gov't vehicles
& Unlashing, blocking and bracing cargo( e ) Inoperable Vehicles being towed

RO/RO Containers, loaded by contractor trailer Containers loaded onto trailers, bomb carts, MIFI's, or other equipment, otherwise trailered into RORO vessels and unloaded, stowed and lashed

CONTAINER - BREAK BULK DEFINITIONS
20Explosives, in crates, boxes, tubs, tubes
25Milvan - Containers packed with explosives. Explosives placed in containers are classified as containers.
40Break-Bulk cargo, Non-explosive, Non-ISO cornered , includes M7 FRS, shelters, shop sets, ISU-90/60, mind rollers, blade boxes, skid mounted generators,
crates, 463L pallets,
44Cargo transporters (CONEX) ISO Fitted, loaded/empty - INCLUDE QUADCONS, BICONS, TRICONS, stackable tank modules, SINGLE OR LESS THAN TEU
45Milvan - Containers (non-explosives). All containers ISO Fitted 20'-40' empty or full, includes ISO 20' FRC-Fuel tank moduals, ISO hippo,
ISO 20' stackable flat racks, ISO FPU/BOH
VEHICLE CATEGORY DEFINITIONS
60 - MEDIUM VEHICLE25,001 US. pounds to 60,000 pounds 11,340.26 kg to 27,215.54 kg 11.161 LT to 26.786 LT
60 - GOVERNMENT VEHICLES, UNBOXED, weighing 25,001lbs. to 60,000lbs. per unit
Includes but not limited to: trucks, tractors, track vehicles, semi-trailer vans, mobile cranes, construction equipment (track or wheel), road graders,
rock crushers, busses, boats (trailered/cradled).

61 - LIGHT VEHICLE 25,000 pounds or less 11,339.81 kilograms or less 11.16 long tons

61 - GOVERNMENT VEHICLES, UNBOXED, weighing 25,000lbs. or less per unit includes but limited to: trucks, ambulances, tractors, POV, engineer construction equipment,
personnel carriers, boats or boats on cradles) engineer construction equipment, tracked vehicles and boats (trailered/cradled).

67 - HEAVY VEHICLE 60,001 pounds or more 27,216 kg. or more 26.786 LT or more

67 - GOVERNMENT VEHICLES, UNBOXED, weighing 60,000lbs. per unit or more includes but not limited to: trucks, tractors, vans, track vehicles, HETS, MRAPs, Heavy mobile cranes,
tracked or wheeled engineer construction equipment, and boats (trailered/cradled).

File details come from the government source that posted it. Updated .