202-FW-(1-2)LC-(L) RQN 24_1160.pdf
PDF 149 KB Posted
- Attached to
- Drainage System Cleaning-Macomb County
- Solicitation number
- RFP - 591 - 240000001068
- Issued by
- Macomb County, Marlette City, Michigan
About this file
This document is a traffic control typical plan from the Michigan Department of Transportation for a 1-lane to 2-lane closure on a 3-lane freeway or divided roadway. The plan provides detailed signage and traffic control device requirements for maintaining traffic during the closure, including lane closure signage, reduced speed limit signs, and work zone warning signs. The plan specifies sign placement, taper lengths, and other traffic control standards to be followed.
The related state and local contract opportunity is for a Drainage System Cleaning project in Macomb County, Michigan, including the City of Marlette. The project scope and details are not provided in this document, as it only contains the traffic control plan. Additional information about the contract opportunity, including response due dates, award dates, and contract term, would need to be obtained from the solicitation documents.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FILE:
Michigan Department of Transportation
DECEMBER 2021
ON A 3-LANE FREEWAY
OR DIVIDED ROADWAY
1-LANE TO 2-LANE CLOSURE DATE:
SHEET:
NOT TO SCALE
202-FW-(1-2)LC-(L).dgn
MAINTAINING TRAFFIC TYPICAL
202-FW-(1-2)LC-(L)
NO:
S H
O U
L D
E R
ROAD WORK
END
G20-2
LIMIT
SPEED
XX
R2-1
LIMIT
SPEED
XX
R2-1
LIMIT
SPEED
XX
R2-1
D
S H
O U
L D
E R
BEGINS
ZONE
WORK
R5-18c
D
ROAD
WORK
AHEAD
W20-1
LIMIT
SPEED
XX
R2-1
ROAD WORK
END
G20-2
ROAD
WORK
AHEAD
W20-1
W3-5b
ZONE
AHEAD
REDUCED
SPEED
INJURE /
KILL A
WORKER
7500$
15 YEARS
R5-18b
D D
W O
R K
A R
E A
V A
R
IE
S
W3-5b
ZONE
AHEAD
REDUCED
SPEED
B
INJURE /
KILL A
WORKER
7500$
15 YEARS
R5-18b
D
BEGINS
ZONE
WORK
R5-18c
L
W4-2L
CLOSED
AHEAD
LEFT LANE
W20-5L
CLOSED
AHEAD
LEFT LANE
W20-5L
W4-2L
WHERE
WORKERS
PRESENT
R2-1a
DD
WHERE
WORKERS
PRESENT
F
T
KEY
DIVIDED ROADWAYS AND 2D ON FREEWAYS
PLACE SIGNS AT A SPACING OF D ON
R2-1a OPTIONAL
PLACE SIGN AS INDICATED IN NOTE S2
PLACE SIGN AS INDICATED IN NOTE S5
REFLECTS EXISTING SPEED LIMIT
TRAFFIC FLOW
LIGHTED ARROW PANEL
CHANNELIZING DEVICES
L 1/3
NEXT SHEET.
USE IN THE DOWNSTREAM TAPER ON THE
THESE ADDITIONAL DEVICES ARE SHOWN FOR
DEVICES:
SIGNING:
GENERAL:
TCD1, TCD2, TCD6
S1, S2, S3, S5, S8
G1, G2, G3, G4
STANDARD NOTES
(SEE 102-GEN-NOTES)
LIMIT
SPEED
XX
R2-1
WHERE
WORKERS
PRESENT
R2-1a
LIMIT
SPEED
XX
R2-1
WHERE
WORKERS
PRESENT
R2-1a
FILE:
Michigan Department of Transportation
DECEMBER 2021
ON A 3-LANE FREEWAY
OR DIVIDED ROADWAY
1-LANE TO 2-LANE CLOSURE DATE:
SHEET:
NOT TO SCALE
202-FW-(1-2)LC-(L).dgn
MAINTAINING TRAFFIC TYPICAL
202-FW-(1-2)LC-(L)
NO:
S H
O U
L D
E R
ROAD WORK
END
G20-2
LIMIT
SPEED
XX
R2-1
LIMIT
SPEED
XX
R2-1
LIMIT
SPEED
XX
R2-1
D
S H
O U
L D
E R
BEGINS
ZONE
WORK
R5-18c
D
ROAD
WORK
AHEAD
W20-1
LIMIT
SPEED
XX
R2-1
ROAD WORK
END
G20-2
ROAD
WORK
AHEAD
W20-1
W3-5b
ZONE
AHEAD
REDUCED
SPEED
INJURE /
KILL A
WORKER
7500$
15 YEARS
R5-18b
D D
W O
R K
A R
E A
V A
R
IE
S
W3-5b
ZONE
AHEAD
REDUCED
SPEED
B
INJURE /
KILL A
WORKER
7500$
15 YEARS
R5-18b
D
BEGINS
ZONE
WORK
R5-18c
W4-2L W4-2L
D
L
L
W4-2LW4-2L
W20-5aL2
LEFT
TWO LANES
CLOSED
AHEAD
W20-5aL2
LEFT
TWO LANES
CLOSED
AHEAD
WHERE
WORKERS
PRESENT
D
WHERE
WORKERS
PRESENT
L 1/3
LIMIT
SPEED
XX
R2-1
WHERE
WORKERS
PRESENT
R2-1a
File details come from the government source that posted it. Updated .