2019-07-31 Addendum No 1 (002).pdf

PDF 134 KB Posted

Attached to
Flooring Replacement CCP - RFP
Solicitation number
RFP GIS 190000002837 2
Issued by
Genesee County, Fife Lake Village, Michigan

About this file

This is an addendum to the original contract documents for a flooring replacement project managed by Genesee Intermediate School District (GISD) with architectural services provided by MAYOTTEgroup Architects. The project involves replacement flooring at two locations: the Elms Road Building and the Center for Countywide Programs, both located in Swartz Creek and Flint, Michigan. The addendum, issued on July 31, 2019, clarifies and modifies the original contract specifications. A pre-bid meeting was held, and interested bidders may request the sign-in sheet from Matthew McGaughey at the architect's office. Project completion is intended for October 2019, with the specific date to be determined following contract award. Work is to be performed during first shift hours, Monday through Friday.

The addendum addresses five key specification items that modify the original contract documents. The owner assumes responsibility for moving all furniture and equipment from the affected areas. Wall base requirements are specified as 4-inch rolled vinyl cove base. The addendum takes precedence over the original contract documents and serves to clarify the project scope and execution requirements for all bidders submitting proposals.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum No. 1

Addendum No. 1 2019-034 GISD Floor Replacement mjm

ADDENDUM TO THE CONTRACT DOCUMENTS FOR:

CLIENT:

Genesee Intermediate School District

PROJECT:

Flooring Replacement Project

Elms Road Building & Center for Countywide Programs

Swartz Creek and Flint, MI

ARCHITECT:

MAYOTTEgroup Architects

6240 W. Mt. Hope

Lansing, MI 48917

PURPOSE: This addendum is issued to amplify, clarify, and modify the original contract documents and shall take precedence over them.

DATE ISSUED: July 31, 2019

ATTACHMENTS: Pre-Bid Meeting Sign-In Sheet

To All Bidders

SPECIFICATIONS

Item 1 Pre-Bid Meeting Sign-In Sheet; contact the Mayotte Group for a copy; Matthew

McGaughey @ mcgaughey@mayottearchitects.com.

Item 2 The Owner will be responsible for moving furniture and equipment.

Item 3 The completion is intended to be in October, 2019. Specific date to be determined once project is awarded.

Item 4 Work hours are to be first shift, Monday-Friday.

Item 5 Clarification: Wall base is to be 4” rolled vinyl-cove base.

END OF ADDENDUM NO. 1