2016_Yellowbook_ScopeOfWorkCheatSheet Updated 10-5-2018~25.pdf
PDF 93 KB Posted
- Solicitation number
- BD-27-1020-DCRCU-DC250-134862
- Issued by
- Massachusetts
About this file
This document is a 2016 Uniform Appraisal Standards for Federal Land Acquisitions (UASFLA) Scope of Work cheat sheet, revised in 2018, that outlines the critical assignment elements required in appraisals conducted for federal land acquisitions. The document serves as a reference guide for appraisers working on the Massachusetts Department of Conservation and Recreation's Forest Legacy Program NRF Tract 19 Panagiotes property appraisal, with proposals due November 9, 2026. The appraisal must determine the before and after fair market value of a conservation restriction interest in the subject property and comply with both UASFLA and Uniform Standards of Professional Appraisal Practice (USPAP) requirements. The seven critical scope of work elements that must be addressed include client identification, intended users and use, type of opinion and value definition, effective date, relevant property characteristics, and assignment conditions. Appraisers are required to personally inspect the subject property, contact property owners or representatives, verify legal descriptions through multiple methods, and clearly identify and explain any hypothetical conditions or extraordinary assumptions adopted in the analysis.
The cheat sheet specifies additional reporting requirements including descriptions of investigation and analysis methodology, the geographical area and time span searched for market data, types of market data researched, and references and data sources relied upon. Appraisers must discuss the applicability of all valuation approaches and justify the exclusion of any approach. The document emphasizes the requirement to make a larger parcel determination in every appraisal, apply the unit rule to value property as a whole rather than as separate components, and develop reconciliation to a final value opinion. For the Panagiotes property, which involves a partial acquisition through conservation restriction, the work requires separate valuations of the larger parcel before and after acquisition, allocation and damages analysis, and production of exhibits including location maps, comparable sales maps, plot plans, photographs, title evidence, and appraiser qualifications.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2016 UASFLA Standards Scope of Work cheat sheet
The first step in the appraisal process is to identify the appraisal problem to be solved. To do so, the appraiser and the client must address seven critical assignment elements presented in the Uniform Appraisal Standards for Federal Land Acquisitions (UASFLA) Section 1.2. (Scope of Work). 2.3.1.8 Description of Scope of Work states the appraiser shall use this section of the report to identify the seven (7) critical elements that defined the appraisal problem to be solved.
1. Client (1.2.1) o Provided in the Statement of Work (SOW)
2. Intended users (1.2.2) o Provided in SOW
3. Intended use (1.2.3) o Provided in SOW
4. Type of Opinion and definition of value (1.2.4) o Provided in SOW, must use definition 1.2.4 for federal acquisitions
5. Effective date (1.2.5) o Typically is the last date of inspection
6. Relevant characteristics about the subject property (1.2.6) also referred to as property characteristics (2.3.1.8) o Property Interest(s) to be appraised (1.2.6.1) Provided in SOW o Legal description (1.2.6.2) Provided in SOW
• Appraiser should still verify the legal description o On the ground during a physical inspection of the property o With the owner of the property (if possible) o Comparing it with aerial or other available maps o Comparing it with public records
There is no reporting requirement of the actual legal description in this section of the report as it is required to be reported under the factual data section. However, it would be helpful to report the legal description was provided and verified to be accurate. If the appraiser discovers a significant error or inconsistency the appraiser should consult the client for clarification before proceeding with the appraisal.
o Property Inspections (1.2.6.3) The appraiser (the lead/contracted appraiser) must personally inspect the subject property o Contacting landowners (1.2.6.4)
During the course of inspecting the subject property, the appraiser is expected to meet with property owner or representative, if possible
• Contact information provided in SOW The owner or owner’s designated representative must be given an opportunity to accompany the appraiser on the property inspection
7. Assignment conditions (1.2.7) o Instructions, hypothetical conditions, extraordinary assumptions (1.2.7.1) Includes any special instructions which are typically in writing and provided in the SOW Only hypothetical conditions and extraordinary assumptions provided in the SOW are to be included
2016 UASFLA Standards Scope of Work cheat sheet o The appraiser has the burden of clearly identifying and explaining the implications of any hypothetical condition or extraordinary assumption adopted. The required explanation and discussion of the implications of such hypothetical conditions or extraordinary assumptions must be included in this portion of the appraisal report. Each hypothetical condition and extraordinary assumption must be labeled as such and any legal instructions must be included in the addenda of the report. (2.3.1.8) o Jurisdictional Exceptions (1.2.7.1.2) Provided in SOW o See 1.2.7.3 through 1.2.7.6 for additional items considered part of the assignment conditions o Larger Parcel (1.2.7.3.1) Essential to the appraiser's conclusion of highest and best use is the determination of the larger parcel. The appraiser must make a larger parcel determination in every appraisal conducted under these standards, even in minor partial acquisitions in which the appraiser is instructed not to do a complete before and after appraisal.
o Unit Rule (1.2.7.3.2) The unit rule requires valuing the property as a whole rather than the sum of the values of the various interests into which it has been carved - such as lessor and lessee, or life tenant and the holder of the remainder. This requirement holds true in circumstances where the physical components of the property are held under different ownership such as the surface estate, mineral rights, water rights, or timber. Even when the physical components of a property are under the same ownership, it is improper to separately value the various components (improvements, minerals, standing timber, crops, and land) and then add them up. This procedure results in an improper summation or cumulative appraisal, which is inconsistent with both federal appraisal standards and USPAP.
o
Additional reporting requirements under scope of work:
• Should describe:
o The investigation and analysis in developing the appraisal o The geographical area and time span searched for market data o Include a description of the type of market data researched and the extent of market data confirmation o State references and data sources relied upon in developing the appraisal
• Shall discuss:
o The applicability of all approaches o The exclusion of any approach to value
File details come from the government source that posted it. Updated .