Lejeune Schools AHU Flex Connector Replacement 2027, 2028
Solicitation number
N4008520R4133
Issued by

View the file

Other files

File Type Posted
Amend 0001 200702.pdf PDF
200702 DWGS 2.pdf PDF
200702 TTES-JPS AHU Flex Connector Replacement-SOW.pdf PDF
200702 DWGS 1.pdf PDF
200702 SPECS.pdf PDF
RFP 200702.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT DESCRIPTION

Lejeune Schools AHU Flexible Connector Replacement

The work includes: Repair/replace internal canvas fan connectors for fan housings at, Bitz Intermediate School, BLDG 2028 and Johnson Primary School BLDG 2027. Demo 22 unserviceable York discharge canvas connectors on 8 AHUs and 2 ERUs per school and associated hardware from main blowers. Provide new or fabricated flexible connectors using industry standard material.

Replace all hardware (cleats, corners, screws) associated with attaching new flexible connectors. Start York AHU’s and check for general operation, air flow and pressure.

And incidental related work: Dispose of all unserviceable materials off base.

The work shall be located at Johnson Primary, 2027 Stone Street, and Bitz Intermediate, 2028 Bevin Street, Camp Lejeune, North Carolina.

SPECIAL SCHEDULING

The facility/activity will remain in operation during the entire construction period. The Contractor shall conduct his operations so as to cause the least possible interference with normal operations of the facility/activity.

Within the overall project schedule, commence and complete the work in phases. Complete each phase as indicated.

PHASE DESCRIPTION SCHEDULED START DAY COMPLETION DAY

A No Phasing July 9, 2020_____August 14, 2020___ B ___________________________________________________ C ___________________________________________________

SUPERVISION

One person may fill the roles of Superintendent, Quality Control Manager, and Safety & Health Officer, if duly qualified for all three positions as defined in the project specification. If approved by NAVFAC