20_UT1-UT5 Modified Trenching Drawing - Aug 2016.pdf
PDF 39 KB Posted
- Attached to
- SABER IDIQ
- Solicitation number
- FA486125R0003
About this file
The document is a technical drawing detailing trench specifications for conduit and direct burial cables, dated August 2016. The diagram illustrates five different trench configurations (UT1-UT5) with varying compositions of backfill materials including sand, gravel, clean soil, compacted backfill, and concrete.
Key technical notes specify that trench depths and widths are to be determined in the unit descriptions, with requirements for cable installation, backfilling, and minimum clearance between power and communication cables. The legend defines four material types: sand/gravel/clean soil (cross-hatched), compacted backfill, undisturbed earth, and concrete. The drawing provides detailed cross-sectional views showing different trench types, including plain trenches, trenches with concrete encasement, trenches with concrete cap, directional bore, and plow configurations.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .