20. 22-026437 Task Requirement SOW.pdf

PDF 106 KB Posted

Attached to
MMAC Mechanical Construction Solicitation Federal contract opportunity
Solicitation number
6973GH-22-R-00065
Issued by
Department of Transportation Federal Aviation Administration Franchise Acquisition Services

View the file

Other files for this federal contract opportunity

Other files attached to MMAC Mechanical Construction Solicitation, newest first.
File Type Posted
CSR RTU5.jpg JPG image
Solicitation 6973GH-22-R-00065 Amend 00001.pdf PDF
CSR RTU9.jpg JPG image
3. Chapter_33-Construction Safety.pdf PDF
5. Past Performance Information Form.doc DOC document
17. Division 26 Electrical.pdf PDF
18. Division 27 Communication.pdf PDF
1. Client Auth. Letter.doc DOC document
4. Contractor's Release.pdf PDF
6. Past Performance Survey.doc DOC document
7. SF25 Performance Bond.pdf PDF
9. WD OK20210049 9-02-2022.pdf PDF
12. SOW Appendix B Substitution form.doc DOC document
13. SOW Appendix C AMKFM-224001 Revision 15.pdf PDF
14. SOW Appendix D Installed Equipment Data sheet.xlsx XLSX spreadsheet
15. SOW Appendix E Construction waste management.xls XLS spreadsheet
Solicitation 6973GH-22-R-00065.pdf PDF
2. Mech SOW 08.30.2022.pdf PDF
8. SF25A Payment Bond.pdf PDF
10. SOW Table of Contents 09.02.2022.doc DOC document
11. SOW Appendix A Submittal form.doc DOC document
21. Schedule B Task Requirement.xlsx XLSX spreadsheet
22. 22-026437 Task Requirement Bid Set Drawings.pdf PDF
16. SOW Appendix F EXCAVATION PERMIT v1.pdf PDF
19. Division 28 Electronic Safety and Security.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work 22-026437 305-CSR Room 101 Fix Humidity

1. Demolish existing roof top heat pumps, RTU-5 and RTU-9.

2. Provide and install new roof top heat pumps, RTU-5 and RTU-9

3. Reconnect ground loop water, condensate drainage, power, controls, etc. for a fully functional system.

4. Test and balance diffusers associated with the new heat pumps.

5. Work to be performed during normal working hours, other than work elements requiring outages

6. Construct in accordance with the attached drawing set and specification section 01010.

Period of Performance: 161 days

ADP7862.tmp
END TABLE OF CONTENTS

File details come from the government source that posted it. Updated .