11. SOW Appendix A Submittal form.doc

DOC document 85 KB Posted

Attached to
MMAC Mechanical Construction Solicitation Federal contract opportunity
Solicitation number
6973GH-22-R-00065
Issued by
Department of Transportation Federal Aviation Administration Franchise Acquisition Services

View the file

Other files for this federal contract opportunity

Other files attached to MMAC Mechanical Construction Solicitation, newest first.
File Type Posted
CSR RTU5.jpg JPG image
CSR RTU9.jpg JPG image
Solicitation 6973GH-22-R-00065 Amend 00001.pdf PDF
3. Chapter_33-Construction Safety.pdf PDF
5. Past Performance Information Form.doc DOC document
17. Division 26 Electrical.pdf PDF
18. Division 27 Communication.pdf PDF
20. 22-026437 Task Requirement SOW.pdf PDF
16. SOW Appendix F EXCAVATION PERMIT v1.pdf PDF
19. Division 28 Electronic Safety and Security.pdf PDF
Solicitation 6973GH-22-R-00065.pdf PDF
2. Mech SOW 08.30.2022.pdf PDF
8. SF25A Payment Bond.pdf PDF
10. SOW Table of Contents 09.02.2022.doc DOC document
21. Schedule B Task Requirement.xlsx XLSX spreadsheet
22. 22-026437 Task Requirement Bid Set Drawings.pdf PDF
1. Client Auth. Letter.doc DOC document
4. Contractor's Release.pdf PDF
6. Past Performance Survey.doc DOC document
7. SF25 Performance Bond.pdf PDF
9. WD OK20210049 9-02-2022.pdf PDF
12. SOW Appendix B Substitution form.doc DOC document
13. SOW Appendix C AMKFM-224001 Revision 15.pdf PDF
14. SOW Appendix D Installed Equipment Data sheet.xlsx XLSX spreadsheet
15. SOW Appendix E Construction waste management.xls XLS spreadsheet
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR MANUFACTURER'S CERTIFICATES OF COMPLIANCE

DATE
SPEC. SECTION

SUBMISSION NO.

REVIEWAL REQUEST FOR THE FOLLOWING ITEMS - THIS SECTION WILL BE INITIATED BY THE CONTRACTOR

TO:
FROM:
CONTRACT NO./PROJECT NAME
CHECK ONE:

THIS IS A NEW SUBMITTAL

THIS IS A RESUBMITTAL OF

ITEM

NO

DESCRIPTION OF SUBMITTED ITEM(S)

(Type, Size, Model Number, Etc.)

TYPE OF SUBMITTAL (Mfg/Contr. Catalog Data; Shop Dwg; Sample; Etc.)
NO

OF COPIES

CONTRACT REFERENCE DOCUEMENT
IS SUBSTITUTION REQUESTED?
SPEC. PARA. NO.
DWG SHEET NO.
(CHECK ONE)

If Yes, Request Form Must Be Provided

YES

NO

REMARKS:

(Name of Contractor) FORM CS154/93

SHEET OF

I certify that the above submitted items have been reviewed in detail and are correct and in conformance with the Contract Documents and can be installed in the allocated spaces, except as other wise stated.

NAME AND SIGNATURE OF CONTRACTOR

DATE

EXAMPLE OF SUBMITTAL SCHEDULE

Page No. 1

08/31/92

OWNER

CITY, STATE

PROJECT TITLE

WEEKLY SUBMITTAL REPORT

DOCNO

SPEC TITLE

SPEC.

PARA NO

DESCRIPTION OF SUBMITTED ITEM

DATE

DATE TO

REVIEWER

01005.002

GENERAL PROVISIONS

01005 2.57

PROGRESS CHARTS

06/09/92 07/09/92

NET

01005.003

GENERAL PROVISIONS

01005 1.07.B

SCHEDULE OF VALUES

06/03/92 06/03/92

NET

01005.003A

GENERAL PROVISIONS

01005 1.07.B

SCHEDULE OF VALUES

06/08/92 06/10/92

NET

01005.045

GENERAL PROVISIONS

01005 1.01

EMERGENCY VEHICLE ACCESS

PLAN / FIRE LANE

07/21/92 07/22/92

NET

01005.2R1

GENERAL PROVISIONS

01005 2.57

PROGRESS CHARTS - REVISED

07/24/92 08/07/92

NET

01006.004

SPECIAL PROVISIONS

01006 1.13

SCHEDULE FOR SUBMITTALS

06/15/92 06/15/02

AAN

01621.030

ENVIRONMENT

PROTECTION

01621

EPA PLAN

06/29/92 07/10/92 R

01621.30R1

ENVIRONMENT

PROTECTION

01621

EPA PLAN

06/29/92 07/10/92

NET