This is a Cost Schedule attachment for a fiber reinforced asphalt procurement by the City of West Jordan, Utah, Public Works Department. The City is soliciting bids to supply PG64-28, SP-3/8, 50Nd Fiber Reinforced Asphalt or PG64-34, SP-3/8, 50Nd Fiber Reinforced Asphalt for Class II roads in accordance with 2017 APWA Specifications 32 12 03 and 32 12 05. The total quantity required is 12,000 tons of material. The specifications require that RAP (recycled asphalt pavement) shall not exceed 15 percent by weight, asphalt content shall not be less than 5.5 percent, air voids may be as low as 3 percent if necessary, and fiber reinforcement must be either FORTA FI Fiber or ACE XP Polymer Fiber.
The cost schedule requires bidders to submit pricing on a per-ton basis for pick-up at the vendor's location, with the material to be delivered to 7960 S. 4000 W., West Jordan, Utah. Vendors must specify the one-way distance in miles between their location and the City's Public Works facility and calculate a factored pick-up cost per mile. The total bid price shall be based on the overall cost of furnishing 12,000 tons of material, with award determination made on the lowest total cost. Bidders must provide company name and contact information on the cost schedule form.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-WJPW26031801 2026 Fiber Reinforced Asphalt.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment A-Pick-Up
WJPW26031801- 2026 FIBER REINFORCED ASPHALT ATTACHMENT A- COST SCHEDULE
ITEM-Material UNITS Pick-up unit Cost per ton Pick-up unit Cost of 12,000 tons Pick-up location address One-way distance Between Vendor location and Public Works 7960 S. 4000 W. West Jordan, UT (List distance in Miles) City Factored Pick up Cost per mile Calculated cost per ton with city pick-up factor applied to pick up unit cost (based upon a Round-trip basis) *Total over all cost of 12,000 tons
| APWA 32 12 05 Class II Roads | ||||||
| PG64-28, SP-3/8, 50Nd Fiber Reinforced Asphalt | TONS | $ - 0 | $ 6.78 | $ - 0 | $ - 0 | |
| APWA 32 12 05 Class II Roads | ||||||
| PG64-34, SP-3/8, 50Nd Fiber Reinforced Asphalt | TONS | $ - 0 | $ 6.78 | $ - 0 | $ - 0 | |
| *Award shall be based upon the Total over all cost of 12,000 tons | ||||||