2_Submittal Schedule.pdf
PDF 85 KB Posted
- Attached to
- Repair Launch Facility Concrete
- Solicitation number
- FA462626R0013
About this file
This document is a Schedule of Materials Submittals for the Repair Launch Facility Concrete project (NZAS 22-6000, Contract No. FA4626-26-R-0013).
The schedule outlines ten required contractor submittals with specified timing and documentation requirements. Key submissions include: Hot Work Permit (AF Form 592) and Work Clearance Request (AF IMT 103) prior to starting work; a Work Schedule due 30 days prior to starting work; weekly Work Schedule Notifications due every Tuesday by 0900; a Quality Control Plan due 10 days after Notice to Proceed; Site Security CEAL documentation due 30 days prior to starting work; a Construction Storm Water Package due 15 days prior to starting work; a Hazmat Final Report due 10 days prior to final acceptance; monthly Solid Waste Disposal and Diversion summaries due by the 10th of each month; and Product Data for concrete repair due prior to starting work. The document identifies the U.S. Air Force as the federal agency and specifies submission protocols through the Project Engineer, with notation fields for contractor notification dates, approval/disapproval status, and resubmittal tracking. All documents require certification of compliance, and various submissions must be coordinated with Missile Engineering and the contracting office before work initiation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 10_LF Concrete Q and A.pdf | ||
| 8_Past Performance Reference Sheet.pdf | ||
| 9_Subcontractor Consent.pdf | ||
| 1_Specs.pdf | ||
| 7_Section L and M.pdf | ||
| Solicitation - FA462626R0013.pdf | ||
| 5_WD MT20260077 (17May26).pdf | ||
| 3_Schedule of Drawings.pdf | ||
| 4_Project Drawings.pdf | ||
| 6_LF Concrete Bid Schedule.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 2 Repair Launch Facility Concrete FA4626-26-R-0013
SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.
FA4626-26-R-0013
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R A
W
IN
G S
SA
M
PL
E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
FA
C
TU
R
ER
'S
R
EC
O
M M
E N
D A
TI
O
N S
M A
N U
FA
C
TU
R
ER
'S
W
A R
R A
N
TY
C A
T A
L O
G D
A T
A
O
PE
R A
T
IN
G
IN
ST
R U
C
TI
O N
S
N O
T
IF
IC
A
T
IO
N
O T
H E
R
R E
Q U
IR
E
D S
U B
M
IS
SI
O
N
D
T E
(B
Y
C
N T
R A
C T
O R
D A
T E
R E
C E
IV
E
D I
C
N T
R A
C T
IN
G
D A
T E
T O
M
IS
SI
L
G
IN
E E
R
IN
G
R E
T U
R N
S U
SP
E
N
SE
D A
T E
SU
B
M
IT
T A
L N
U M
B E
R S
DATE CONTRACTOR NOTIFIED
C O
N T
R A
C T
SU
B M
IT
T
L
FI
A L
A
PP
R O
V A
L
REMARKS
APPROVED DIS-
APPROVED
1 GENERAL REQUIREMENTS 01 00 00 - 3.5.2
Hot Work Permit (AF Form 592) X PTSW
2 GENERAL REQUIREMENTS 01 00 00 - 3.5.3
Work Clearance Request (AF IMT 103) X PTSW
3 GENERAL REQUIREMENTS 01 00 00 - 3.6.2
Work Schedule X 30d
PTSW
4 GENERAL REQUIREMENTS 01 00 00 - 3.8
Weekly Work Schedule Notification X 1W Every Tuesday by 0900
5 GENERAL REQUIREMENTS 01 00 00 - 1.12,
3.13 & 3.14 Quality Control Plan X 10d
ANTP No less than 30 days PTSW
6 SITE SECURITY 01 10 00 - 1.5 CEAL X 30d
PTSW
ENVIRONMENTAL PROTECTION 01 36 00 -
2.3 & 4.2.2.1. Construction Storm Water Package
4 15d
PTSW
8 ENVIRONMENTAL PROTECTION 01 36 00 -
8.5 Hazmat Final Report 4 10d
PTFA
ENVIRONMENTAL PROTECTION 01 36 00 -
11.5 Summary of Solid Wast Disposal and
Diversion
X Monthl y
Due by the 10th of Each Month
10 CONCRETE REPAIR 03 01 00 - 1.4 Product Data X PTSW
Schedule of Abbreviations:
ANTP = After Notice To Proceed
PTFA = Prior To Final Acceptance
PTFI = Prior To Final Inspection
PTSW = Prior to Starting Work
W = Weekly
Number of Copies Required
NZAS 22-6000 Repair Launch Facility Concrete
AF Form 66 02:
2_Submittal Schedule-6/1/2026
SS-1
REQUIRED TECHNICAL SUBMITTALS
File details come from the government source that posted it. Updated .