2_Stuart Bathrooms SOI.xlsx
XLSX spreadsheet 21 KB Posted
- Attached to
- Monongahela National Forest, Stuart Bathroom Replacement Federal contract opportunity
- Solicitation number
- 12445523Q0089
- Issued by
- Department of Agriculture Forest Service
About this file
This document contains a schedule of items and instructions for an independent government cost estimate (IGE) for the Stuart Bathroom Roof Replacement project on the Monongahela National Forest. The Forest Service is soliciting bids for roof replacement on two bathrooms under solicitation number 12445523Q0089. The schedule of items lays out the base bid and optional items, which include removing and disposing of the existing roofing systems and installing new roofing systems on both buildings, as well as removing and replacing rafter insulation. The period of performance is from June 26, 2023 to September 15, 2023. The IGE instructions provide guidance on preparing an independent cost estimate using the same level of detail as requested from contractors, including any assumptions used.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12445523Q0089 Amendmen 1 SF 30.pdf | ||
| wv24.txt | TXT text file | |
| 8_Stuart Bathroom Roof Replacement Specifications.pdf | ||
| 5_Stuart Bathrooms Eval. Criteria.pdf | ||
| 9_Stuart Bathrooms Close-Up Map.pdf | ||
| 12445523Q0089 Monongahela Stuart Roof RFQ.docx | DOCX document | |
| 3_Stuart Bathrroms SOW.pdf | ||
| 10_Stuart Bathrooms Vicinity Map.pdf | ||
| 12445523Q0089 SF 1442(8_2014).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
INSTRUCTIONS: HOW TO USE THIS FORM
| Independent Government Estimate (IGE) |
| No specific format is required for an IGE; however this must be an independent estimate and not a reiteration of a contractor quote. The selected format should generally be in the same level of detail and manner that the Schedule of Items pricing we request from contractors. The estimate should state any underlying assumptions or rationale used in formulating the estimate. Initially the CO will use the IGE to determine the estimated value of the procurement and to identify the appropriate procurement thresholds applicable to the solicitation. Later the IGE is compared to prices received to evaluate an offeror’s understanding of the government requirements and in supporting a price reasonableness determination. |
EXPLANATION OF TABS
| Stand Alone IGE: | Use if the below do not apply to your requirement. |
| Stand Alone IGE w/options: | Use if you have a requirement where you know you have an ongoing/recurring need year after year. |
| IDIQ: | Use if you have a need that is reoccurring or multi-year requirement. |
| Task Order: | Use if you want to issue a order against an existing contract or agreement. |
CONTRACT (NO OPTIONS)
SCHEDULE OF ITEMS
Monongahela National Forest PROJECT TITLE: Stuart Bathroom Roof Replacement
| Period of Performance | 06/26/2023-09/15/2023 |
| SCHEDULE OF ITEMS |
| BASE BID ITEM | |||||||
| NUMBER | BASE ITEMS DESCRIPTION | METHOD OF MEASUREMENT | UNIT | QUANTITY | Unit Price | Total Price | |
| 0001 | Mobilization | LSQ | LS | 1 | |||
| 0002 | Building 1 - Remove and Dispose of Existing Roofing System. Provide and Install New Roofing System (Sheathing, Underlayments, Fasteners, Flashing, Shakes, etc.) | LSQ | LS | 1 | |||
| Total |
| OPTION ITEM | |||||||
| NUMBER | OPTIONAL ITEMS DESCRIPTION | METHOD OF MEASUREMENT | UNIT | QUANTITY | Unit Price | Total Price | |
| 1001 | Building 2 - Remove and Dispose of Existing Roofing System. Provide and Install New Roofing System (Sheathing, Underlayments, Fasteners, Flashing, Shakes, etc.) | LSQ | LS | 1 | |||
| 1002 | Building 1 - Rafter Insulation Removal & Replacement | LSQ | LS | 1 | |||
| 1003 | Building 2 - Rafter Insulation Removal & Replacement | LSQ | LS | 1 | |||
| Total |
| LSQ - | LUMP SUM QUANTITY |
| AQ - | ACTUAL QUANTITY |
| EA - | EACH |
| SF - | SQUARE FOOT |
| LF - | LINEAR FOOT |
| LS - | LUMPSUM |