2_Stuart Bathrooms SOI.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
Monongahela National Forest, Stuart Bathroom Replacement Federal contract opportunity
Solicitation number
12445523Q0089
Issued by
Department of Agriculture Forest Service

About this file

This document contains a schedule of items and instructions for an independent government cost estimate (IGE) for the Stuart Bathroom Roof Replacement project on the Monongahela National Forest. The Forest Service is soliciting bids for roof replacement on two bathrooms under solicitation number 12445523Q0089. The schedule of items lays out the base bid and optional items, which include removing and disposing of the existing roofing systems and installing new roofing systems on both buildings, as well as removing and replacing rafter insulation. The period of performance is from June 26, 2023 to September 15, 2023. The IGE instructions provide guidance on preparing an independent cost estimate using the same level of detail as requested from contractors, including any assumptions used.

View the file

Other files for this federal contract opportunity

Other files attached to Monongahela National Forest, Stuart Bathroom Replacement, newest first.
File Type Posted
12445523Q0089 Amendmen 1 SF 30.pdf PDF
wv24.txt TXT text file
8_Stuart Bathroom Roof Replacement Specifications.pdf PDF
5_Stuart Bathrooms Eval. Criteria.pdf PDF
9_Stuart Bathrooms Close-Up Map.pdf PDF
12445523Q0089 Monongahela Stuart Roof RFQ.docx DOCX document
3_Stuart Bathrroms SOW.pdf PDF
10_Stuart Bathrooms Vicinity Map.pdf PDF
12445523Q0089 SF 1442(8_2014).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

INSTRUCTIONS: HOW TO USE THIS FORM

Independent Government Estimate (IGE)
No specific format is required for an IGE; however this must be an independent estimate and not a reiteration of a contractor quote. The selected format should generally be in the same level of detail and manner that the Schedule of Items pricing we request from contractors. The estimate should state any underlying assumptions or rationale used in formulating the estimate. Initially the CO will use the IGE to determine the estimated value of the procurement and to identify the appropriate procurement thresholds applicable to the solicitation. Later the IGE is compared to prices received to evaluate an offeror’s understanding of the government requirements and in supporting a price reasonableness determination.

EXPLANATION OF TABS

Stand Alone IGE:Use if the below do not apply to your requirement.
Stand Alone IGE w/options:Use if you have a requirement where you know you have an ongoing/recurring need year after year.
IDIQ:Use if you have a need that is reoccurring or multi-year requirement.
Task Order:Use if you want to issue a order against an existing contract or agreement.

CONTRACT (NO OPTIONS)

SCHEDULE OF ITEMS

Monongahela National Forest PROJECT TITLE: Stuart Bathroom Roof Replacement

Period of Performance06/26/2023-09/15/2023
SCHEDULE OF ITEMS
BASE BID ITEM
NUMBERBASE ITEMS DESCRIPTIONMETHOD OF MEASUREMENTUNITQUANTITYUnit PriceTotal Price
0001MobilizationLSQLS1
0002Building 1 - Remove and Dispose of Existing Roofing System. Provide and Install New Roofing System (Sheathing, Underlayments, Fasteners, Flashing, Shakes, etc.)LSQLS1
Total
OPTION ITEM
NUMBEROPTIONAL ITEMS DESCRIPTIONMETHOD OF MEASUREMENTUNITQUANTITYUnit PriceTotal Price
1001Building 2 - Remove and Dispose of Existing Roofing System. Provide and Install New Roofing System (Sheathing, Underlayments, Fasteners, Flashing, Shakes, etc.)LSQLS1
1002Building 1 - Rafter Insulation Removal & ReplacementLSQLS1
1003Building 2 - Rafter Insulation Removal & ReplacementLSQLS1
Total
LSQ -LUMP SUM QUANTITY
AQ -ACTUAL QUANTITY
EA -EACH
SF -SQUARE FOOT
LF -LINEAR FOOT
LS -LUMPSUM