These documents are ST-1, ST-2, ST-3, and ST-4 steel product certification forms for the Historic Gallatin School Living Centre Preservation project, issued by the Department of General Services (DGS) under the RACP ME#5154-00 contract. The forms are specifically designed to verify the origin and manufacturing details of non-structural steel products used in the project, ensuring compliance with the Steel Products Procurement Act. The forms require detailed documentation from prime contractors and fabricators, mandating that steel products contain both U.S. and potentially foreign steel, with at least 75% of the product's cost being mined, produced, or manufactured in the United States.
The certification process involves multiple steps, including identifying specific steel products, contacting multiple suppliers/manufacturers, and providing detailed attestations about steel component origins. Contractors must submit these forms within 30 days of professional approval of a steel product submittal, and no steel product can be delivered on-site without DGS receiving and approving the appropriate ST form. Penalties for non-compliance can include significant consequences such as non-payment, product removal and replacement, and potential debarment from Commonwealth public works projects for up to five years. The forms emphasize transparency, requiring signatures from company presidents/vice presidents and secretaries/treasurers, and reserve the right for the Commonwealth to investigate and verify the submitted information.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ST-2
This form must be filled out for non-identifiable, non-structural steel products.
SECTION A To be filled out by the Purchaser, the firm that pays the Fabricator
Line #1 This is the name of the firm that is dealing directly with the Fabricator
Line #2 This is the purchaser’s mailing address.
Line #3 This is the purchaser’s business phone.
Line #4 This is the date the ST-2 form is sent to the fabricator.
Line #5 This is the DGS contract number or RACP ME#5154-00
Line #6 This is th RACP Project Name. Historic Gallatin School Living Centre Preservation
Line #7 This is the “steel product” being certified, such as a chiller, condenser, hollow metal doors. The prime contractor may not fill in the line with a description like “structural steel”, “heating unit” or “air conditioning Unit”. The model number, if any, of the steel product must be listed as indicated.
SECTION B To be filled out by the Fabricator, the firm that assembles the product listed on Line #7.
Line #1 This is the Fabricator’s name.
Line #2 This is the Fabricator’s mailing address.
Line #3 This is the Fabricator’s business phone.
Line #4 This is the date the Fabricator receives the ST-2 from the Purchaser.
Line #5 This is the Fabricator’s Federal I.D. number.
SECTION C
1. Language – No modifications, cross-outs or alterations of any type may be made to the language of this certification paragraph.
2. Signature – Two signatures are required on the ST-1 form. The Prime Contractor’s President/Vice President must sign on one line and the Secretary or Treasurer must sign as a witness. The names should be typed or printed beneath the signature lines. Failure to type in the names does not invalidate the ST form.
LINE #7 IS THE MOST CRITICAL PART OF THE FORM.
FAILURE TO PROPERTY FILL OUT LINE #7 ON EACH ST FORM
MAKES THE ENTIRE FORM INVALID AND A NEW FORM MUST BE
SUBMITTED.
ST-2 STEEL ORIGIN CERTIFICATION:
NON-IDENTIFIABLE, NON-STRUCTURAL STEEL
This form must be executed by the Purchaser and the Fabricator of any item containing steel that is not structural steel. This form must be submitted to the APM within 30 days from the date the Professional approved a submittal listing a “steel product”. No steel product may be delivered on-site unless DGS has received the ST form. Structural steel is defined as steel products used as a basic structural element or a project (i.e. steel beams, columns, decking stairways, reinforcing bars, pipes, etc.). Purchasers of structural steel products (contractors or subcontractors) must provide bills of lading, invoices and mill certifications that the steel was manufactured in the United States instead of this form. The Fabricator shall be herein defined as the firm that assembles the component parts of the product to be purchased. The Department of General Services will accept the certification of firms that are earlier in the chain of purchase (i.e.
manufacturers of components, steel suppliers) in lieu of the Fabricator.
A. TO BE COMPLETED BY THE PURHCASER:
1. Name of purchasing firm:
2. Firm’s address:
3. Firm’s phone number: 4. Date submitted to Fabricator:
5. Contract No. DGS 6. Contract Title:
7. Steel Product Certified:
Model:
B TO BE COMPLETED BY THE FABRICATOR/MANUFACTURER:
1. Name of firm:
2. Address of firm:
3. Firms phone number: 4. Date Received:
5. Federal Employer ID. No:
CERTIFICATION: I, the undersigned officer of the Fabricator/Manufacturer, do certify that our firm assembled/fabricated the components to the steel products listed in Section A, Item 7, and that all steel components therein are comprised of steel that is melted and/or fabricated in the United States. I understand that, by signing this document, I certify that I have received assurances from the suppliers/manufacturers of the components that said components do not contain foreign manufactured steel. I further understand that this document is subject to the provisions of the Unsworn Falsification to Authorities Act (18 P.S. § 4904). I also understand that I am subject to the provisions of the Steel Products Procurement Act (73 P.S. § 1881, et. seq.) which provides penalties including, but not limited to, debarment from supplying any products for Commonwealth of Pennsylvania Public works projects for a period of five (5) years for violations therein. I agree to provide documentation supporting these facts if requested by the Commonwealth. The Commonwealth reserves the right to pursue any action deemed necessary to protect the Commonwealth’s interest and ensure compliance with the laws of the Commonwealth.
WITNESS:
(Seal)
Name: Name:
Secretary or Treasurer President or Vice President
ST-3
2-STEP ELIGIBILITY ANAYLSYS:
BEFORE A PRIME CONTRACTOR CAN SUBMIT AN ST-3,
THE FOLLOWING ANALYSIS MUST BE SATISFIED
STEP #1: The contractor must establish that the “product” contains BOTH:
• Steel melted in the USA
AND
• Foreign Steel
Note: Step #1 focuses upon the content of the “product”.
Note: The % need not be close; it can be 99-1, so long as there is both foreign and domestic steel in the “product”.
STEP #2: The contractor must establish that 75% of the cost of the “product” has been mined, produced or manufactured in the USA.
Note: Step #2 focuses upon the cost of the entire “product”, not just the steel within it.
SECTION A
Line #1 This is the Prime Contractor’s name.
Line #2 This is the Prime Contractor’s business address.
Line #3 This is the Prime Contractor’s phone number.
Line #4 This is the date the ST-3 is submitted to the fabricator.
Line #5 This is RACP ME# 5154-00
Line #6 This is the RACP Project Name. Historic Gallatin School Living Centre Preservation
Line #7 This is the “steel product” being certified, such as a chiller, condenser, hollow metal doors. The prime contractor may not fill in the line with a description like “structural steel”, “heating unit” or “air conditioning unit”. The model number, if any, or the steel product must be listed as indicated.
LINE #7 IS THE MOST CRITICAL PART OF THE FORM.
FAILURE TO PROPERLY FILL OUT LINE #7 ON EACH ST FORM
SUBMITTED.
SECTION B To be filled out by the Fabricator/Manufacturer, the firm that fabricates the product listed on Line A7.
Line #1 This is the Fabricator’s name.
Line #2 This is the Fabricator’s business address.
Line #3 This is the Fabricator’s business phone.
Line #4 This is the date the Fabricator receives the ST-3 from the purchaser.
Line #5 This is the Fabricator’s Federal I.D. Number.
Line #6 The Fabricator must insert the percentage of the cost of the articles, materials and supplies which have been mined, produced or manufactured in the U.S. for the product listed on Line #7.
SECTION C
1. Language – No modifications, cross-outs or alterations of any type may be made to the language of this certification paragraph.
2. Signature – Two signatures are required on the ST-3 form. The Fabricator’s President/Vice President must sign on one line and the Secretary or Treasurer must sign as a witness. The names should be typed or printed beneath the signature lines. Failure to type in the names does not validate the ST form.
NOTES on ST-3 Forms:
• It is not necessary to submit an ST-1 with the ST-3.
• DGS reserves the right to request additional documentation to support the percentage specified on Line 14. If the Fabricator/manufacturer refuses to produce such documentation and/or DGS deems it to be in the Commonwealth’s best interests, DGS may request the Office of Inspector General to investigate the submission of the ST-3 form.
ST-3
75% U.S. MANUFACTURE CERTIFICATION
The Steel Products Procurement Act (73 P.S. § 1881, et. seq.) allows the use of steel products with both foreign and domestic steel if at least 75 percent of the cost of the materials (including steel, rubber, wood, plastics, etc.) in the product are manufactured or produced, as the case may be, in the United States.
This form must be executed by a Fabricator of any item containing BOTH U.S. AND FOREIGN STEEL. The fabricator shall hereby be defined as the firm that assembles the component parts of the product to be purchased. The Department of General Services will accept the certification of firms that are earlier in the chain of purchase (i.e., manufacturers of components, steel suppliers) in lieu of the Fabricator.
This form must be submitted to the APM within 30 days from the date the Professional approves a submittal listing a “steel product”. No steel product may be delivered on-site unless DGS has received an ST form.
A. TO BE COMPLETED BY THE PRIME CONTRACTOR (PURCHASER):
1. Name of Contractor:
2. Address of Contractor:
3. Phone Number: 4. Date submitted to Fabricator:
5. Contract No. DGS: 6. Contract Title:
7. Steel Product Certified:
Model:
B. TO BE COMPLETED BY THE FABRICATOR/MANUFACTURER:
1. Name of Firm:
2: Address of Firm:
3: Firm’s Phone number: 4. Date Received:
5: Federal Employer ID No.
6Percentage of the cost of the articles, materials and supplies which have been mined, produced or manufactured in the U.S. for the product listed above on line 7:
CERTIFICATION: I, the undersigned Officer of the Fabricator/Manufacturer, do certify that our firm assembled/manufactured the components to the steel product listed in Section 7, that the steel in said product is both foreign and domestically manufactured, and that all the facts contained in this document are true. I agree to provide documentation supporting these facts if requested by the Commonwealth. I further understand that this document is subject to the provisions of the unsworn Falsification to Authorities Act (18 P.S. § 4904) and the Steel products Procurement Act (73 P.S. §1881, et seq.) which provide penalties including, but not limited to, debarment from supplying any products for Commonwealth of Pennsylvania public works projects for a period of five (5) years for violations therein.
The Commonwealth reserves the right to pursue any action deemed necessary to protect the Commonwealth’s interest and ensure compliance with the laws of the Commonwealth.
(Seal)
Secretary or Treasurer President or Vice Presiden
ST-4
This form may be submitted in circumstances where the Prime contractor believes that the “product” on Line #7 is not made in sufficient quantities to satisfy the requirements of the contract.
The information submitted by a Prime contractor is subject to verification by the Department. Any Prime contractor who executes a Purchase Order or other type of purchase agreement encompassing a “steel product” prior to receiving the Department’s written determination that the “steel product” listed on Line #7 of the ST-4 form is not manufactured in sufficient quantity to meet the requirements of the project does so at its own risk and faces penalties including, but not limited to, non-payment for the product; removal and replacement of the product at its own costs;
and/or an Office of Inspector General investigation which may lead to debarment.
Line #1 this is the Prime Contractor’s formal business name.
Line #2 This is the Prime Contractor’s business address.
Line #3 This is the Prime Contractor’s business phone.
Line #4 This is the date the ST-4 form is submitted to DGS. Office of the Budget.
Line #5 RACP ME#5154-00.
Line #6 RACP Project Name: Historic Gallatin School Living Centre Preservation
Line #7 This is the “steel product” being certified, such as a chiller, condenser, hollow metal doors. The prime contractor may not fill in the line with a description like “structural steel”, “heating unit” or air conditioning unit”.
Line #8 These four lines, (a) through (d), are to be filled out completely by the Prime Contractor. At least four suppliers/manufacturers must be contacted by the Prime Contractor to ascertain if the “product” on Line #7 is manufactured with domestic steel.
CERTIFICATION
1. Language – No modifications, cross-outs or alterations of any type may be made to the language of this certification paragraph.
2. Signature – Two signatures are required on the ST-4 form. The Prime Contractor’s President/Vice President must sign on one line and the Secretary or Treasurer must sign as a witness. The names should be typed or printed beneath the signature line. Failure to type in the names does not invalidate the ST form.
NOTE ON ST-4 FORMS:
•It is not necessary to submit an ST-1 form with an ST-4 form.
Domestic availability will be determined as of the date the ST-4 form is submitted to DGS for approval
LINE #7 IS THE MOST CRITICAL PART OF THE FORM.
FAILURE TO PROPERLY FILL OUT LINE #7 ON EACH ST FORM
SUBMITTED FOR APPROVAL.
ST-4 NOT DOMESTICALLY MANUFACTURED: PRIME CONTRACTOR
This form must be executed by the Prime Contractor and submitted to the APM within 30 days from the date the Professional approves a submittal listing a “steel product”. No steel product may be delivered on-site unless DGS has received, reviewed and provided written approval of the ST-4 form. An ST-4 form can only be submitted for approval when a steel product is not domestically produced in sufficient quantities. DGS will verify the accuracy of the information on the ST- 4 form and will contact additional suppliers/manufacturers to ascertain the availability of a domestic steel product.
1. Prime Contractor: 2. Address:
3. Phone Number: 4. Date Submitted: 5. Contract No.
DGS:
5. Contract Title: 7. Steel Product:
8. Suppliers/manufacturers contacted by the Prime Contractor that claimed that the above product is not produced/manufactured with U.S. manufactured steel. At least four Suppliers/Manufacturers are needed. Manufacturers listed in specifications must be contacted.
a. Firm Name: Phone Number:
Address:
Person Contacted:
Date Contacted:
b. Firm Name: Phone Number:
c. Firm Name: Phone Number:
d. Firm Name: Phone Number:
CERTIFICATION: I, the undersigned Officer of the Contractor, do certify that I have contacted the firms listed in Section 9, and was informed that said firms do not produce/manufacture the steel product listed on Line 7 with U.S. Steel in sufficient quantities to complete the above-referenced project. I understand that this document is subject to the provisions of the Unsworn Falsifications to Authorities Act (18 P.S.
§ 4904) and the Steel Products Procurement Act, which provide penalties including, but not limited to, debarment from bidding on any Commonwealth of Pennsylvania public works project for a period of five years. The Commonwealth reserves the right to pursue any action deemed necessary to protect the Commonwealth’s interest and ensure compliance with the laws of the Commonwealth.
(SEAL)
Secretary or Treasurer President or Vice President
Administrative Procedures 2017 Edition August 2018
| ST 2 STEEL ORIGIN CERTIFICATION CIty Mission Gallatin School |
| ST 3 CIty Mission Gallatin School |
| ST 4 CIty Mission Gallatin School |
File details come from the government source that posted it. Updated .