CPFF Task Order
| To be used for Cost Plus Fixed Fee Task Order | | | | | |
| Standard Labor Category | Fully-Burdened Labor Rates (Excluding Fee) | | | | |
| Base Period | | Option 1 | | Option 2 |
| Contract Year 1 | Contract Year 2 | Contract Year 3 | Contract Year 4 | Contract Year 5 |
| 6/1/21 - 5/31/22 | 6/1/22 - 5/31/23 | 6/1/23 - 5/31/24 | 6/1/24 - 5/31/25 | 6/1/25 - 5/31/26 |
| Program Manager | $OFI | $OFI | $OFI | $OFI | $OFI |
| Manager | $OFI | $OFI | $OFI | $OFI | $OFI |
| Supervisor | $OFI | $OFI | $OFI | $OFI | $OFI |
| Safety Manager | $OFI | $OFI | $OFI | $OFI | $OFI |
| Engineer I | $OFI | $OFI | $OFI | $OFI | $OFI |
| Engineer II | $OFI | $OFI | $OFI | $OFI | $OFI |
| Engineer III | $OFI | $OFI | $OFI | $OFI | $OFI |
| Quality Engineer I | $OFI | $OFI | $OFI | $OFI | $OFI |
| Quality Engineer II | $OFI | $OFI | $OFI | $OFI | $OFI |
| Safety Engineer | $OFI | $OFI | $OFI | $OFI | $OFI |
| System Operator I | $OFI | $OFI | $OFI | $OFI | $OFI |
| System Operator II | $OFI | $OFI | $OFI | $OFI | $OFI |
| Technician I | $OFI | $OFI | $OFI | $OFI | $OFI |
| Technician II | $OFI | $OFI | $OFI | $OFI | $OFI |
| Technician III | $OFI | $OFI | $OFI | $OFI | $OFI |
| Craft I | $OFI | $OFI | $OFI | $OFI | $OFI |
| Craft II | $OFI | $OFI | $OFI | $OFI | $OFI |
| Craft III | $OFI | $OFI | $OFI | $OFI | $OFI |
| Laborer | $OFI | $OFI | $OFI | $OFI | $OFI |
| Driver | $OFI | $OFI | $OFI | $OFI | $OFI |
| IT Professional I | $OFI | $OFI | $OFI | $OFI | $OFI |
| IT Professional II | $OFI | $OFI | $OFI | $OFI | $OFI |
| IT Professional III | $OFI | $OFI | $OFI | $OFI | $OFI |
| Drafter I | $OFI | $OFI | $OFI | $OFI | $OFI |
| Drafter II | $OFI | $OFI | $OFI | $OFI | $OFI |
| Drafter III | $OFI | $OFI | $OFI | $OFI | $OFI |
| Business Specialist I | $OFI | $OFI | $OFI | $OFI | $OFI |
| Business Specialist II | $OFI | $OFI | $OFI | $OFI | $OFI |
| Business Specialist III | $OFI | $OFI | $OFI | $OFI | $OFI |
| Administration Specialist I | $OFI | $OFI | $OFI | $OFI | $OFI |
| Administration Specialist II | $OFI | $OFI | $OFI | $OFI | $OFI |
| Administration Specialist III | $OFI | $OFI | $OFI | $OFI | $OFI |
| G&A to be Applied to Non-Labor Resources (NLRs) Rates | OFI% | OFI% | OFI% | OFI% | OFI% |
| Fee Rate Percentage | OFI% | OFI% | OFI% | OFI% | OFI% |
Draft RFP No. 80JSC020R0034 SECTION B
FFP Delivery Order
| To be used for Firm Fixed Price Delivery Order | | | | | |
| Standard Labor Category | Base Labor Rates | | | | |
| Base Period | | Option 1 | | Option 2 |
| Contract Year 1 | Contract Year 2 | Contract Year 3 | Contract Year 4 | Contract Year 5 |
| 6/1/21 - 5/31/22 | 6/1/22 - 5/31/23 | 6/1/23 - 5/31/24 | 6/1/24 - 5/31/25 | 6/1/25 - 5/31/26 |
| Program Manager | $OFI | $OFI | $OFI | $OFI | $OFI |
| Manager | $OFI | $OFI | $OFI | $OFI | $OFI |
| Supervisor | $OFI | $OFI | $OFI | $OFI | $OFI |
| Safety Manager | $OFI | $OFI | $OFI | $OFI | $OFI |
| Engineer I | $OFI | $OFI | $OFI | $OFI | $OFI |
| Engineer II | $OFI | $OFI | $OFI | $OFI | $OFI |
| Engineer III | $OFI | $OFI | $OFI | $OFI | $OFI |
| Quality Engineer I | $OFI | $OFI | $OFI | $OFI | $OFI |
| Quality Engineer II | $OFI | $OFI | $OFI | $OFI | $OFI |
| Safety Engineer | $OFI | $OFI | $OFI | $OFI | $OFI |
| System Operator I | $OFI | $OFI | $OFI | $OFI | $OFI |
| System Operator II | $OFI | $OFI | $OFI | $OFI | $OFI |
| Technician I | $OFI | $OFI | $OFI | $OFI | $OFI |
| Technician II | $OFI | $OFI | $OFI | $OFI | $OFI |
| Technician III | $OFI | $OFI | $OFI | $OFI | $OFI |
| Craft I | $OFI | $OFI | $OFI | $OFI | $OFI |
| Craft II | $OFI | $OFI | $OFI | $OFI | $OFI |
| Craft III | $OFI | $OFI | $OFI | $OFI | $OFI |
| Laborer | $OFI | $OFI | $OFI | $OFI | $OFI |
| Driver | $OFI | $OFI | $OFI | $OFI | $OFI |
| IT Professional I | $OFI | $OFI | $OFI | $OFI | $OFI |
| IT Professional II | $OFI | $OFI | $OFI | $OFI | $OFI |
| IT Professional III | $OFI | $OFI | $OFI | $OFI | $OFI |
| Drafter I | $OFI | $OFI | $OFI | $OFI | $OFI |
| Drafter II | $OFI | $OFI | $OFI | $OFI | $OFI |
| Drafter III | $OFI | $OFI | $OFI | $OFI | $OFI |
| Business Specialist I | $OFI | $OFI | $OFI | $OFI | $OFI |
| Business Specialist II | $OFI | $OFI | $OFI | $OFI | $OFI |
| Business Specialist III | $OFI | $OFI | $OFI | $OFI | $OFI |
| Administration Specialist I | $OFI | $OFI | $OFI | $OFI | $OFI |
| Administration Specialist II | $OFI | $OFI | $OFI | $OFI | $OFI |
| Administration Specialist III | $OFI | $OFI | $OFI | $OFI | $OFI |
| Coefficient Factors | Base Period | | Option 1 | | Option 2 |
| Contract Year 1 | Contract Year 2 | Contract Year 3 | Contract Year 4 | Contract Year 5 |
| 6/1/21 - 5/31/22 | 6/1/22 - 5/31/23 | 6/1/23 - 5/31/24 | 6/1/24 - 5/31/25 | 6/1/25 - 5/31/26 |
| Labor - Normal Work Hours | OFI% | OFI% | OFI% | OFI% | OFI% |
| Labor - Other Than Normal Work Hours | OFI% | OFI% | OFI% | OFI% | OFI% |
| Material & Equipment | OFI% | OFI% | OFI% | OFI% | OFI% |
| Subcontracted Work | OFI% | OFI% | OFI% | OFI% | OFI% |
Draft RFP No. 80JSC020R0034 SECTION B
Pre-Priced Items
| To be used for Pre-Priced Items | | | | | | | |
| Pre-Priced Line Items | | | Base Period | | Option 1 | | Option 2 |
| | | Contract Year 1 | Contract Year 2 | Contract Year 3 | Contract Year 4 | Contract Year 5 |
| Identifier | Title | Unit | 6/1/21 - 5/31/22 | 6/1/22 - 5/31/23 | 6/1/23 - 5/31/24 | 6/1/24 - 5/31/25 | 6/1/25 - 5/31/26 |
| a | Common Electrical | | | | | | |
| a.1 | Cap floor receptacle | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| a.2 | Activate existing floor receptacle | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| a.3 | Install new floor receptacle | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| a.4 | Install new floor receptacle on flooring containing asbestos | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| a.5 | Install 3/4" EMT conduit | Linear Foot | $OFI | $OFI | $OFI | $OFI | $OFI |
| a.6 | Install 3/4" EMT conduit in asbestos containing ceiling plenum | Linear Foot | $OFI | $OFI | $OFI | $OFI | $OFI |
| a.7 | Add a 20A breaker to an existing 120/208V electrical panel | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| a.8 | Install 3 12 AWG wiring in EMT | CLF | $OFI | $OFI | $OFI | $OFI | $OFI |
| a.9 | Install 3 12 AWG wiring in EMT in asbestos containing ceiling plenum | CLF | $OFI | $OFI | $OFI | $OFI | $OFI |
| a.10 | Install flexible metal conduit in existing wall | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| a.11 | Install new duplex wall receptacle | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| b | Television and Projector Mounts | | | | | | |
| b.1 | TV or Monitor Mount (Metal wall) | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| b.2 | TV or Monitor Mount (CMU block wall) | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| b.3 | TV or Monitor Mount (Gypsum board wall) | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| b.4 | TV or Monitor Mount (Gypsum board wall with truss) | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| b.5 | TV or Monitor Mount (CMU block wall with truss) | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| b.6 | TV or Monitor Mount (Metal wall with truss) | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| c | Common Architectural | | | | | | |
| c.1 | Construct two sided gypsum board wall (up to 10' high) | Square Foot | $OFI | $OFI | $OFI | $OFI | $OFI |
| c.2 | Install new 3'x7' door, hardware, and frame in new wall | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| c.3 | Install new 3'x7' door, hardware and frame in existing wall | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| c.4 | Substitute a Solid Wood Walnut Door Instead of a Birch Door | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| c.5 | Provide and Install mortise cypher lock in a door | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| c.6 | Install keyed lock in a door | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| c.7 | Replace asbestos containing flooring with vinyl tile | Square Foot | $OFI | $OFI | $OFI | $OFI | $OFI |
| c.8 | Replace small areas of asbestos containing vinyl tile flooring | Square Foot | $OFI | $OFI | $OFI | $OFI | $OFI |
| c.9 | Provide and install new carpet | Square Foot | $OFI | $OFI | $OFI | $OFI | $OFI |
| c.10 | Provide and install new carpet on top of existing flooring | Square Foot | $OFI | $OFI | $OFI | $OFI | $OFI |
| d | Sidewalks | | | | | | |
| d.1 | Remove/replace exposed aggregate concrete sidewalk | Square Foot | $OFI | $OFI | $OFI | $OFI | $OFI |
| d.2 | Remove/replace broom finish concrete sidewalk | Square Foot | $OFI | $OFI | $OFI | $OFI | $OFI |
| d.3 | Install new 4” deep, broom finish concrete sidewalk | Square Foot | $OFI | $OFI | $OFI | $OFI | $OFI |
| e | Common Asbestos Procedures | | | | | | |
| e.1 | Provide asbestos containment barrier | Linear Foot | $OFI | $OFI | $OFI | $OFI | $OFI |
| e.2 | JPR #I-1 asbestos abatement Procedures | Square Foot | $OFI | $OFI | $OFI | $OFI | $OFI |
| e.3 | JPR #I-2 asbestos abatement Procedures | Square Foot | $OFI | $OFI | $OFI | $OFI | $OFI |
| e.4 | JPR #I-3 asbestos abatement Procedures | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| e.5 | JPR #II-1 asbestos abatement Procedures | Square Foot | $OFI | $OFI | $OFI | $OFI | $OFI |
| e.6 | JPR #II-2 asbestos abatement Procedures | Square Foot | $OFI | $OFI | $OFI | $OFI | $OFI |
| e.7 | JPR #III-4 asbestos abatement Procedures | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| e.8 | JPR #III-5 asbestos abatement Procedures | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| e.9 | JPR #III-7 asbestos abatement Procedures | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| e.10 | JPR #III-10 asbestos abatement Procedures | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| e.11 | JPR #III-11 asbestos abatement Procedures | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| f | Common Cleaning | | | | | | |
| f.1 | Power washing | 100 sq. ft. | $OFI | $OFI | $OFI | $OFI | $OFI |
| f.2 | Site sweeping | 1000 sq.ft. | $OFI | $OFI | $OFI | $OFI | $OFI |
| g | Street and Crosswalk Painting | | | | | | |
| g.1 | Crosswalk painting | Square Foot | $OFI | $OFI | $OFI | $OFI | $OFI |
| g.2 | Street and parking lot markings | Linear Foot | $OFI | $OFI | $OFI | $OFI | $OFI |
| h | Common Civil | | | | | | |
| h.1 | Water and Gas System Appurtenances | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| h.2 | Exterior and miscellaneous painting | Square Foot | $OFI | $OFI | $OFI | $OFI | $OFI |
| h.3 | Security bollards and staples painting | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| h.4 | Traffic control, warning, and hazard signs | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| h.5 | Provide new traffic control sign and mounting post | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| h.6 | Reserved Parking Space Designations (Stenciled) | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| h.7 | Provide and install metal name plate holders on curb stops | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
i Support for hurricane level 4 Each $OFI $OFI $OFI $OFI $OFI
| j | Nitrogen Delivery | | | | | | |
| j.1 | Small nitrogen delivery | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| j.2 | Standard nitrogen delivery | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| k | Interior Finishes | | | | | | |
| k.a | Interior Finish Mobilization | Job | $OFI | $OFI | $OFI | $OFI | $OFI |
| k.1 | Paint existing interior metal, masonry or gypsum board walls or ceilings | Square Foot | $OFI | $OFI | $OFI | $OFI | $OFI |
| k.2 | Paint existing metal or wood door | Side | $OFI | $OFI | $OFI | $OFI | $OFI |
| k.3 | Hang Government furnished fire extinguisher | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| k.4 | Install Government furnished pictures | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| k.5 | Remove Government furnished pictures | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| k.6 | Relocate or replace Government furnished pictures or temporarily remove and reinstall Government furnished pictures | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| k.7 | Purchase 3’X2’ White Dry-erase Board | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| k.8 | Purchase 4’x3’ White Dry-erase Board | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| k.9 | Purchase 6’x4’ White Dry-erase Board | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| k.10 | Purchase 8’x4’ White Dry-erase Board | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| k.11 | Purchase 3’x2’ Magnetic White Dry-erase Board | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| k.12 | Purchase 4’x3’ Magnetic White Dry-erase Board | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| k.13 | Purchase 6’x4’ Magnetic White Dry-erase Board | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| k.14 | Purchase 8’x4’ Magnetic White Dry-erase Board | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| k.15 | Purchase 3’x2’ Bulletin Board | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| k.16 | Purchase 4’x3’ Bulletin Board | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| k.17 | Purchase 6’x4’ Bulletin Board | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| k.18 | Purchase 8’x4’ Bulletin Board | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| k.19 | Purchase 3’x2’ Glass Dry-erase Board | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| k.20 | Purchase 4’x3’ Glass Dry-erase Board | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| k.21 | Purchase 6’x4’ Glass Dry-erase Board | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| k.22 | Purchase 8’x4’ Glass Dry-erase Board | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| k.23 | Remove Board | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| k.24 | Install Board (other than Glass Dry-erase Board) | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| k.25 | Install Glass Dry-erase Board (Gypsum board wall) | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| k.26 | Install Glass Dry-erase Board (CMU block wall) | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| k.27 | Install Glass Dry-erase Board (Metal wall) | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| k.28 | Relocate or replace board or temporarily remove and reinstall board (other than Glass Dry-erase Board) | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| k.29 | Provide and Install Interior Sign Starter Plate | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| k.30 | Provide and Install Interior Name Plate/Number Sign | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| Pre-Priced Design Costs For Projects With An Estimated Construction Value Less Than $160,001 | | | | | | |
| Construction Cost Range | Unit | Contract Year 1 | Contract Year 2 | Contract Year 3 | Contract Year 4 | Contract Year 5 |
| $0 - $2,500 | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| $2,501 - $5,000 | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| $5,001 - $10,000 | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| $10,001 - $20,000 | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| $20,001 - $40,000 | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| $40,001 - $80,000 | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
| $80,001 - $160,000 | Each | $OFI | $OFI | $OFI | $OFI | $OFI |
Draft RFP No. 80JSC020R0034 SECTION B
FFP, Est. Cost & Award Fee
| FIRM-FIXED PRICE, ESTIMATED COST AND AWARD FEE SCHEDULE | | | | | | | | |
| Contract Year | Period No. | Evaluation Period | Duration | Contract Type | Firm-Fixed Price | Available Award Fee | Estimated Cost | Estimated Cost and Award Fee |
| Phase-in | Phase-in | 61 days | 4/1/21 – 5/31/21 | Firm-Fixed Price | $OFI | | | |
| Year 1 | Base Period | 12 months | 6/1/21 - 5/31/22 | Cost-Plus Award Fee (CPAF) | | $OFI | $OFI | $OFI |
| Year 2 | Base Period | 12 months | 6/1/22 - 5/31/23 | CPAF | | $OFI | $OFI | $OFI |
| Year 3 | Option 1 | 12 months | 6/1/23 - 5/31/24 | CPAF | | $OFI | $OFI | $OFI |
| Year 4 | Option 1 | 12 months | 6/1/24 - 5/31/25 | CPAF | | $OFI | $OFI | $OFI |
| Year 5 | Option 2 | 12 months | 6/1/25 - 5/31/26 | CPAF | | $OFI | $OFI | $OFI |