2-Sally Mauro Elementary School - Preliminary Plans 2-12-2026.pdf

PDF 33 MB Posted

Attached to
Carbon School District- Sally Mauro Remodel
Solicitation number
RA26-94
Issued by
Cache County, Hildale City, Utah

About this file

This is a preliminary architectural plan document for the Sally Mauro Elementary School remodel project undertaken by the Carbon School District in Helper, Utah. The project encompasses a comprehensive remodel of the existing 62,647 square-foot facility (61,366 square feet on the main floor and 1,281 square feet on the mezzanine). The design was prepared in accordance with the 2021 International Building Code and includes detailed architectural, structural, mechanical, plumbing, electrical, and fire protection plans. Key project specifications include Type II B construction classification, occupancy category E, seismic design category D, wind exposure C with 120 mph gust speeds, roof snow load of 33 PSF, and 100 percent fire sprinkler coverage. A mandatory pre-bid site visit is scheduled for 9:00 AM on February 18, 2026, at Sally Mauro Elementary located at 20 2nd Avenue, Helper, Utah 84526. Sealed proposals must be submitted to the Carbon School District offices no later than 3:00 PM MT on February 23, 2026, addressed to Jared Hansen, Maintenance Director. Questions regarding the bidding documents should be directed to Jacob Ricci at jacobr@kmaarchitects.com no later than 2:00 PM on February 19, 2026.

The project involves coordination among multiple design professionals, including KMA Architects, Inc. (architectural), Olsen & Peterson Engineering (mechanical), Acute Engineering (structural), and Resolut Group (electrical). The preliminary plans indicate an allowable building area of 42,750 square feet with a frontage increase calculation demonstrating 61.8 percent building perimeter with allowable open space. Soils engineering was performed by EarthTec Engineering in November 2018, establishing an allowable soil bearing capacity of 2,500 PSF. The document is marked "NOT FOR CONSTRUCTION—REFERENCE ONLY" and was dated February 6, 2026, indicating this is a preliminary planning document to guide the competitive bidding process rather than final construction documents.

View the file

Other files

File Type Posted
1-CMGC SALLY MAURO (1) (1) (1).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CARBON SCHOOL DISTRICT

SALLY MAURO ELEMENTARY REMODEL

CONCRETE

ENGINEERED FILL

BATT INSULATION

RIGID INSULATION

WOOD STUDS

EARTH

ASPHALT

BLOCKING

HARDWOOD

PLYWOOD

SHEET NOTE

GYPSUM BOARD

PROPERTY LINE

WALLTYPE TAG

WINDOW TYPE

CEILING HEIGHT

SECTION MARK

ELEVATION MARK

DETAIL TAG

BUILDING

ELEVATION MARK

ROOM NUMBER

BRICK

VENEER

STONE VENEER

HELPER, UTAH

PROJECT CONTACTS

GRAPHIC SYMBOLS PROJECT DATA INDEX OF DRAWINGS

VICINITY MAPRENDERING

20 2ND AVE

XXX

X

XXX

X

XXX

X

XXX

XX

X

X

ARCHITECTURAL

KMA ARCHITECTS, INC.

170 N MAIN STREET

SPANISH FORK, UTAH 84660

(801) 377-5062

MECHANICAL

OLSEN & PETERSON ENGINEERING

14 EAST 2700 SOUTH

SALT LAKE CITY, UTAH 84115

(801) 486-4646

OWNER STRUCTURAL

ACUTE ENGINEERING

744 SOUTH 400 EAST

OREM, UTAH 84097

(801) 299-9020

ELECTRICAL

RESOLUT GROUP

181 E 5600 SOUTH

MURRAY, UTAH 84107

(801) 530-3148

DOOR NUMBERXX

MAIN FLOOR AREA 61,366 SQ. FT.

MEZZANINE FLOOR AREA 1,281 SQ. FT.

TOTAL FLOOR AREA 62,647 SQ. FT.

INTERNATIONAL BUILDING CODE - 2021

TYPE OF CONSTRUCTION - ll B

BUILDING OCCUPANCY - E

SEISMIC DESIGN CATEGORY - D

SEISMIC OCCUPANCY CATEGORY - lll

WIND EXPOSURE - C

3 SECOND WIND GUST SPEED - 120 MPH

ROOF SNOW LOAD - 33 PSF

ROOF LOADS

LIVE LOAD - 20 PSF

DEAD LOAD - 25 PSF

SOILS REPORT BY - EARTHTEC ENGINEERING

DATED - NOV. 2018

ALLOWABLE SOIL BEARING - 2,500 PSF

FIRE PROTECTION - 100% FIRE

SPRINKLED

9'-0"

PROJECT SITE

SUNSET AVE

N

D A

V E

CARBON SCHOOL DISTRICT

251 WEST 400 NORTH

PRICE, UTAH 84501

(435) 637-1732

R

D A

V E

S

T A

V E

ARCHITECTURAL

ELECTRICAL

STRUCTURAL

MECHANICAL

PLUMBING AND FIRE PROTECTION

A0.0 - CODE COMPLIANCE SHEET

A0.4 - DEMO OVERALL FLOOR PLAN

A0.4A- DEMO AREA "A" FLOOR PLAN

A0.4B- DEMO AREA "B" FLOOR PLAN

A0.4C- DEMO AREA "C" FLOOR PLAN

A0.4D- DEMO AREA "D" FLOOR PLAN

A0.5- DEMO MEZZ. & BASMENT PLAN

A0.7- DEMO OVERALL ROOF PLAN

A0.7A- DEMO AREA "A" ROOF PLAN

A0.7B- DEMO AREA "B" ROOF PLAN

A0.7C- DEMO AREA "C" ROOF PLAN

A0.7D- DEMO AREA "D" ROOF PLAN

A1.1- OVERALL MAIN FLOOR PLAN

A1.1A- AREA "A" FLOOR PLAN

A1.1B- AREA "B" FLOOR PLAN

A1.1C- AREA "C" FLOOR PLAN

A1.1D- AREA "D" FLOOR PLAN

A1.2A - AREA "A" MEZZ FLOOR PLAN

A1.2B- AREA "B" MEZZ FLOOR PLAN

A1.2C- AREA "C" MEZZ FLOOR PLAN

A1.2D- AREA "D" MEZZ FLOOR PLAN

A1.4- WALLTYPES AND DETAILS

A2.1- OVERALL REFLECTED CLG PLAN

A2.1A- AREA "A" REFLECTED CLG PLAN

A2.1B- AREA "B" REFLECTED CLG PLAN

A2.1C- AREA "C" REFLECTED CLG PLAN

A2.1D- AREA "D" REFLECTED CLG PLAN

A2.2- OVERALL ROOF PLAN

A2.2A- AREA "A" ROOF PLAN

A2.2B- AREA "B" ROOF PLAN

A2.2C- AREA "C" ROOF PLAN

A2.2D- AREA "D" ROOF PLAN

A2.3- ROOF DETAILS

A5.1- DOOR SCHEDULE

A5.2- DOOR DETAILS

A5.3- WINDOW DETAILS

S0.1 - GENERAL STRUCTURAL NOTES

S0.2 - SPECIAL INSPECTIONS

S1.1A- FOUNDATION PLAN AREA 'A'

S1.1B- FOUNDATION PLAN AREA 'B'

S1.1C- FOUNDATION PLAN AREA 'C'

S1.1D- FOUNDATION PLAN AREA 'D'

S2.1A- FRAMING PLAN AREA 'A'

S2.1B- FRAMING PLAN AREA 'B'

S2.1C- FRAMING PLAN AREA 'C'

S2.1D- FRAMING PLAN AREA 'D'

P0.1 - BASEMENT PLUMBING DEMOLITION PLAN

P0.1A - PLUMBING DEMOLITION PLAN AREA 'A'

P0.1B - PLUMBING DEMOLITION PLAN AREA 'B'

P0.1C - PLUMBING DEMOLITION PLAN AREA 'C'

P0.1D - PLUMBING DEMOLITION PLAN AREA 'D'

P1.0 - BASEMENT PLUMBING PLAN

P1.1A - PLUMBING PLAN AREA 'A'

P1.1B - PLUMBING PLAN AREA 'B'

P1.1C - PLUMBING PLAN AREA 'C'

P1.1D - PLUMBING PLAN AREA 'D'

P4.1 - ENLARGED PLUMBING PLANS

P4.2 - ENLARGED PLUMBING PLANS

P4.3 - ENLARGED PLUMBING PLANS

P6.1 - PLUMBING DETAILS

FP1.1A - FIRE PROTECTION PLAN AREA 'A'

FP1.1B - FIRE PROTECTION PLAN AREA 'B'

FP1.1C - FIRE PROTECTION PLAN AREA 'C'

FP1.1D - FIRE PROTECTION PLAN AREA 'D'

FP6.1 - FIRE PROTECTION DETAILS

M0.1 - BASEMENT MECHANICAL DEMOLITION PLAN

M0.1A - MECHANICAL DEMOLITION PLAN AREA 'A'

M0.1B - MECHANICAL DEMOLITION PLAN AREA 'B'

M0.1C - MECHANICAL DEMOLITION PLAN AREA 'C'

M0.1D - MECHANICAL DEMOLITION PLAN AREA 'D'

M1.0 - BASEMENT MECHANICAL PLAN

M1.1A - MECHANICAL PLAN AREA 'A'

M1.1B - MECHANICAL PLAN AREA 'B'

M1.1C - MECHANICAL PLAN AREA 'C'

M1.1D - MECHANICAL PLAN AREA 'D'

M1.2 - MEZZANINE MECHANICAL PLANS

MP1.1 - OVERALL MECHANICAL PIPING PLAN

M4.1 - ENLARGED MECHANICAL PLANS

M5.1 - MECHANICAL SCHEDULES

M6.1 - MECHANICAL DETAILS

M6.2 - MECHANICAL DETAILS

E2.7 - LIGHTING SCHEDULES

E3.0 - POWER SYMBOLS AND NOTES

E3.1A- AREA 'A' MAIN FLOOR POWER PLAN

E3.1B- AREA 'B' MAIN FLOOR POWER PLAN

E3.1C- AREA 'C' MAIN FLOOR POWER PLAN

E3.1D- AREA 'D' MAIN FLOOR POWER PLAN

E3.2 - MEZZANINE & BASEMENT POWER PLAN

E3.4 - ELECTRICAL SCHEDULES

E3.5 - ONE - LINE DIAGRAM

E3.6 - PANELBOARD SCHEDULE

E3.7 - PANELBOARD SCHEDULE

E4.0 - SYMBOLS DIAGRAMS

E4.1A- AREA 'A' MAIN FLOOR SYSTEM PLAN

E4.1B- AREA 'B' MAIN FLOOR SYSTEM PLAN

E4.1C- AREA 'C' MAIN FLOOR SYSTEM PLAN

E4.1D- AREA 'D' MAIN FLOOR SYSTEM PLAN

E4.2 - MEZZANINE SYSTEMS PLAN

E0.1 - ELECTRICAL SYMBOLS AND NOTES

E0.6 - ELECTRICAL DIAGRAMS

E1.0 - SITE SYMBOLS AND NOTES

E1.1- OVERALL MAIN FLOOR PLAN

ED0.1 - DEMOLITOIN SYMBOLS & NOTES

ED1.1A - AREA 'A' MAIN FLOOR DEMO. PLAN

ED1.1B - AREA 'B' MAIN FLOOR DEMO. PLAN

ED1.1C - AREA 'C' MAIN FLOOR DEMO. PLAN

ED1.1D - AREA 'D' MAIN FLOOR DEMO. PLAN

ED2.1 - MEZZANINE & BASEMENT DEMO. PLAN

E2.0 - LIGHTING SYMBOLS AND NOTES

E2.1A - AREA 'A' MAIN FLOOR LIGHTING RCP

E2.1B - AREA 'B' MAIN FLOOR LIGHTING RCP

E2.1C - AREA 'C' MAIN FLOOR LIGHTING RCP

E2.1D - AREA 'D' MAIN FLOOR LIGHTING RCP

E2.2 - MEZZANINE LIGHTING RCP

DRAWN BY:

P R

O J E

C T

T

IT

L E

CHECKED BY:

DATE:

PROJECT #:

N

O R

T H

M

A I N

S

R

E E

T

S P

A N

I S

H

F

O R

K

U

T A

H

W W

W K

M A

A R

C H

I T

E C

T S

C

O M

REVISIONS:

T H

IS

P

R

IN

T A

N D

A L L I N

F O

R M

A T

IO

N

H E

R E

O N

I S

T H

E P

R O

P E

R T

Y O

F K

M A

A R

C H

IT

E

C T

S A

N D

S H

A L L N

O T

B E

U S

E D

O N

A N

Y O

T H

E R

J O

B W

IT

H

O U

T W

R

IT

T E

N P

E R

M

IS

S

IO

N O

F T

H E

A R

C H

IT

E

C T

/6

/2

:3 :5

A

M

S A

L L

Y M

A U

R O

E L E

M E

N T

A R

Y H

E L P

E R

U

T

C A

R B

O N

C O

U N

T Y

S C

H O

O L D

IS

T

R

IC

T

N

D A

V E

174824

STAFF

WC

FEB 2026

TITLE

N O

T F

O R

C O

N S

T R

U C

T

IO

N R

E F

E R

E N

C E

O N

LY

NOT FOR CONSTRUCTION

REFERENCE ONLY

Preliminary

02/06/2026 7:41:10 AM

Preliminary

02/06/2026 7:41:22 AM

W D

DN

DN

UP

ALLOWABLE AREA: -

ALLOWABLE AREA: -

ALLOWABLE AREA: -

ALLOWABLE AREA: -

BUILDING #1 AREA: -

BUILDING AREA: CALCULATIONS

BUILDING AREA #1 - ALLOWABLE BLDG AREA: SECTION 506.2.1

TABULAR AREA - TABLE 506.2 + (TABULAR AREA

NON-SPRINKLERED - TABLE 506.2 x FRONTAGE INCREASE

DUE TO FRONTAGE AS PER SECTION 506.3.

38,000 + 9,500 x .50

38,000 + 4,750 = 42,750 SQ. FT.

42,750 SQ. FT.

42,062 SQ. FT. (COMPLIES)

FRONTAGE INCREASE: -

BUILIDNG PERIMETER:-

FRONTAGE INCREASE:-

FRONTAGE INCREASE: -

FRONTAGE INCREASE: -

BUILDING AREA: CALCULATIONS

BUILDING AREA #1 - FRONTAGE INCREASE: SECTION 506.3.3

FRONTAGE INCREASE DETERMINED BY THE CALCULATING

PERCENTAGE OF THE BUILDING PERIMETER WITH

ALLOWABLE OPEN SPACE USING TABEL 506.3.3 TO

DETERMINE THE ALLOWED FRONTAGE INCREASE BASED

ON THE CALCULATED BUILDING PERIMETER PERCENTAGE.

If = (F/P) * 100

If = (626/1013) * 100

If = 61.8

If = 0.50

(PERCENTAGE 50%<75% AND OPEN SPACE 25' < 30')

BUILDING CODES

2015 - 2015 - 2015 - 2014 - 2006 -

2013 -

2015 -

2015 - 2009 -

INTERNATIONAL BUILDING CODE

INTERNATIONAL PLUMBING CODE

INTERNATIONAL MECHANICAL CODE

INTERNATIONAL ELECTRICAL CODE NFPA 70

INTERNATIONAL FIRE CODE AND NFPA 13,

STANDARD FOR THE INSTALLTION OF

SPRINKLER SYSTEMS

NFPA 101, LIFE SAFETY CODE NFPA

AMERICANS WITH DISABLITIES ACT

INTERNATIONAL ENERGY CONSERVATION

CODE

INTERNATIONAL FUEL GAS CODE

ANSI. A117.1

LEGENDS AND SYMBOLS

KB

FE

FEC

2 HOUR FIRE SEPARATION WALL WITH 4'-0" MIN.

UPPER FLOOR/ROOF PROTECTION OFFSET ON

EACH SIDE. SEE DETAILS ON SHEET A0.1

1 HOUR FIRE SEPARATION WALL

FIRE RETARDANT TREATED FLOOR/ROOF

STRUCTURE ABOVE (AREA SHOWS OVERLAP

OF1ST FLOOR AND 2ND FLOOR BUILDING FIRE

AREAS)

DOOR OPENING FIRE RATINGS (MINUTES)

KNOX BOX - SEE SPECS

BRACKET MOUNTED FIRE EXTINGUISHER

FIREWALL TYPES - COORDINATE WITH SHEET A0.1

NEW FIRE EXTINGUISHER CABINETS

Statewide Amendments and Additions to the International Fire Code Incorporated as Part of Sate Fire Code 15A-5-204 Amendments and Additions to IFC related to Fire Protections Systems, Chapter 9, Section 906.1 Group E: Additional Exception as follows: "In new and existing Group E occupancies equipped with quick response sprinklers, portable fire extinguishers shall be required only in locations specified in items 2 through 6."

Item #2 - Within 30 feet of commerical cooking equipment.

Item #3 - In areas where flammable or combustible liquads are stored, used, or dispensed.

Item #4 - On each floor of structures under construction, except Group R-3.

Item #5 - Where required by the International Fire Code sections indicate in Table 906.1 Item #6 - Special-Hazard areas, including but not limited to laboratories, computer rooms, and generator rooms, where required by the fire code official.

THIS SHEET IS INTENDED TO BE VIEWED IN COLOR

X

BUILDING AREA

BUILDING 1

BUILDING 2

BUILDING 3

TOTAL BLDG AREA:

42,062 SQ. FT.

14,600 SQ. FT.

6,043 SQ. FT.

62,705 SQ. FT.

BUILDING CRITERIA

(ADMINISTRATION, COMPUTER ROOMS,

KITCHEN, MEDIA CENTER, RESOURCE,

GYMNASIUM, AND CLASSROOMS)

SQUARE FOOTAGE:

CONSTRUCTION TYPE:

OCCUPANCY GROUP:

NUMBER OF OCCUPANTS:

60,378 SQ. FT.

V-B E

C O

O L E

R

8'-0 1/2"

120°

BUILDING #3

BUILDING #1

BUILDING #2

ALLOWABLE AREA: -

ALLOWABLE AREA: -

ALLOWABLE AREA: -

ALLOWABLE AREA: -

BUILDING #1 AREA: -

BUILDING AREA: CALCULATIONS

BUILDING AREA #2 - ALLOWABLE BLDG AREA: SECTION 506.2.1

TABULAR AREA - TABLE 506.2 + (TABULAR AREA

NON-SPRINKLERED - TABLE 506.2 x FRONTAGE INCREASE

DUE TO FRONTAGE AS PER SECTION 506.3.

38,000 + 9,500 x .21

38,000 + 1,995 = 39,995 SQ. FT.

39,995 SQ. FT.

14,600 SQ. FT. (COMPLIES)

ALLOWABLE AREA: -

ALLOWABLE AREA: -

ALLOWABLE AREA: -

ALLOWABLE AREA: -

BUILDING #1 AREA: -

BUILDING AREA: CALCULATIONS

BUILDING AREA #3 - ALLOWABLE BLDG AREA: SECTION 506.2.1

TABULAR AREA - TABLE 506.2 + (TABULAR AREA

NON-SPRINKLERED - TABLE 506.2 x FRONTAGE INCREASE

DUE TO FRONTAGE AS PER SECTION 506.3.

38,000 + 9,500 x 0

38,000 + 0 = 38,000 SQ. FT.

38,000 SQ. FT.

6,043 SQ. FT. (COMPLIES)

FRONTAGE INCREASE: -

BUILIDNG PERIMETER:-

FRONTAGE INCREASE:-

FRONTAGE INCREASE: -

FRONTAGE INCREASE: -

BUILDING AREA: CALCULATIONS

BUILDING AREA #2 - FRONTAGE INCREASE: SECTION 506.3.3

FRONTAGE INCREASE DETERMINED BY THE CALCULATING

PERCENTAGE OF THE BUILDING PERIMETER WITH

ALLOWABLE OPEN SPACE USING TABEL 506.3.3 TO

DETERMINE THE ALLOWED FRONTAGE INCREASE BASED

ON THE CALCULATED BUILDING PERIMETER PERCENTAGE.

If = (F/P) * 100

If = (249/526) * 100

If = 47.34

If = 0.21

(PERCENTAGE 50% <75% AND OPEN SPACE 25' < 30')

FRONTAGE INCREASE: -

BUILIDNG PERIMETER:-

FRONTAGE INCREASE:-

FRONTAGE INCREASE: -

FRONTAGE INCREASE: -

BUILDING AREA: CALCULATIONS

BUILDING AREA #3 - FRONTAGE INCREASE: SECTION 506.3.3

FRONTAGE INCREASE DETERMINED BY THE CALCULATING

PERCENTAGE OF THE BUILDING PERIMETER WITH

ALLOWABLE OPEN SPACE USING TABEL 506.3.3 TO

DETERMINE THE ALLOWED FRONTAGE INCREASE BASED

ON THE CALCULATED BUILDING PERIMETER PERCENTAGE.

If = (F/P) * 100

If = (70/324) * 100

If = 21.60

If = 0

(PERCENTAGE 50% <75% AND OPEN SPACE 25' < 30')

DRAWN BY:

P R

O J E

C T

T

IT

L E

CHECKED BY:

DATE:

PROJECT #:

N

O R

R

E E

T S

P A

N I S

H

F

O R

K

U

T A

H

W W

W K

M A

A R

C H

I T

E C

T S

C

O M

REVISIONS:

T H

IS

P

R

IN

T A

N D

A L L I N

F O

R M

A T

IO

N

H E

R E

O N

I S

T H

E P

R O

P E

R T

Y O

F K

M A

A R

C H

IT

E

C T

S A

N D

S H

A L L N

O T

B E

U S

E D

O N

A N

Y O

T H

E R

J O

B W

IT

H

O U

T W

R

IT

T E

N P

E R

M

IS

S

IO

N O

F T

H E

A R

C H

IT

E

C T

A s i n d ic a te d /5

/2

:2

:3

A

M

S A

L L Y

M A

U R

O E

L E

M E

N T

A R

Y H

E L P

E R

U

T

C A

R B

O N

C O

U N

T Y

S C

H O

O L D

IS

T

R

IC

T

N

D A

V E

174824

BRS

JR

FEB 2026

A0.0 1/16" = 1'-0"

CODE COMPLIANCE MAIN FLOOR PLAN

N O

T F

O R

C O

N S

T R

U C

T

IO

N R

E F

E R

E N

C E

O N

LY

DN

DN

UP

- APPROXIMATE LOCATION OF SAW-CUTTING

FOR NEW SEWER LINE. CONTRACTOR IS TO

BACKFILL AND INSTALL A NEW SLAB AFTER

INSTALLATION - COORDINATE WITH PLUMBING

PLANS

DEMOLITION LEGEND

C O

O L E

R

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

KINDERGARTEN

GIRLS RESTROOM

BOYS RESTROOM

STORAGE

STORAGE

CORRIDOR

JANITOR STORAGE

ATHLECTIC

STORAGE

INSTRUMENT

STORAGE

TABLE STORAGE

FOYER

STORAGE

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CORRIDOR

CORRIDOR

LEARNING CENTER

SUPPLY

NURSE

LOUNGE

OFFICE

TEACHERS WORK

AREA

LIBRARIAN

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

TEAM OFFICE

WORK AREA

CORRIDOR

KITCHEN

MULTI-PURPOSE

CHAIR STORAGE

RESOURCE

A126 STORAGE

A113

CLASSROOM

A114

CLASSROOM

A115

CLASSROOM

A116

CLASSROOM

A125

CLASSROOM

A124

CLASSROOM

A123

CLASSROOM

A122

CLASSROOM

A119

CLASSROOM

A118

CLASSROOM

A117

CLASSROOM

A120CLASSROOM

A121

ATRIUM

A127

GIRLS RESTROOM

A106

BOYS RESTROOM

A105

CUSTODIAN

A109

STORAGE

B101

GYMNASIUM

B100

GENERAL DEMOLITION NOTES

1 - CONTRACTOR TO PROVIDE PLYWOOD

SHEATHING, INSULATION, AND MEMBRANE FOR

WALLS & ROOF TO PROTECT INTERIOR FROM

WEATHER DURING DEMOLITION AND

CONSTRUCTION.

2 - ALL PLUMBING, HVAC, & ELECTRICAL WILL

BE RE-ROUTED OR MODIFIED TO ALLOW

COMPLETE CONTINUITY OF UTILITY SERVICE

FOR SCHOOL OPERATION DURING

CONSTRUCTION.

3 - CONTRACTOR SHALL COORDINATE

DEMOLITION WITH DISTRICT AND ASBESTOS

REMOVAL CONTRACTOR. (ASBESTOS

ABATEMENT BY DISTRICT)

4 - STAGING TO BE DETERMINED BY GENERAL

CONTRACTOR. (COSTS FOR TEMPORARY

STAGING BY CONTRACTOR.)

5 - CONSTRUCTION FENCING SEPARATE NEW

CONSTRUCTION AND DEMOLITION FROM ALL

STUDENT ACTIVITY. (COSTS FOR TEMPORARY

CONSTRUCTION FENCING BY CONTRACTOR.)

6 - CONSTRUCTION AND DEMOLITION ACCESS

TO BE DETERMINED BY GENERAL

CONTRACTOR AND OWNER.

7 - ASBESTOS ABATEMENT BY DISTRICT.

8 - CONTRACTOR SHALL REVIEW THE

PLUMBING, MECHANICAL AND ELECTRICAL

SHEETS FOR ADDITIONAL INFORMATION ON

THE DEMOLITION OF PARTS OF THE BUILDING.

9 - PATCH AND REPAIR EXISTING CONDITIONS

AS REQUIRED DUE TO NEW CONSTRUCTION

AND DEMOLITION

ROOFING DEMOLITION NOTE

A - CONTRACTOR TO INCLUDE ANY NEW ROOF

DECKING, 6" RIGID INSULATION, CURBING,

METAL ROOF PANELS AND SHEET MEMBRANE

ROOFING AT ANY ROOF PENETRATION DUE TO

CONSTRUCTION. COORDINATE ALL ROOF

PENETRATIONS WITH STRUCTURAL,

MECHANICAL, ELECTRICAL, AND KITCHEN

SHEETS FOR ROOF REPAIRS

B - CONTRACTOR TO ADD NEW PLYWOOD

DECKING, 6" RIGID INSULATION, METAL ROOF

PANELS AND ROOF MEMBRANCE OVER

OPENING CREATED AT CURBS BY REMOVAL OF

ANY EXISTING UNITS. REFER TO MECHANICAL

DEMOLITION SHEET FOR LOCATIONS.

CONCRETE GRINDING NOTE

PROVIDE 2000 SQ. FT. OF CONCRETE FLOOR GRINDING FOR

NEW CONSTRUCTION. (THIS APPLIES TO ALL FLOORS OTHER

THAN POLISHED CONCRETE FLOOR AREAS.) CONCRETE

FLOORS SHALL BE GROUND SMOOTH AND LEVEL TO WITHIN

+/- 1/8" WITHIN A 10'-0" RADIUS. THE CONTRACTOR SHALL ALSO

PROVIDE A UNIT COST PER SQ. FT. FOR THIS GRINDING. THE

CONTRACTOR SHALL ERECT AND MAINTAIN DUST BARRIERS IN

THE AREA THE CONCRETE GRINDING IS TAKING PLACE.

CONCRETE FLOOR NOTE

CONTRACTOR TO PREPARE THE NEW CONCRETE FLOORS

FOR THE INSTALLATION OF ALL THE FLOOR FINISHES AS

REQUIRED BY THE ARCHITECT AND OWNER.

DRAWN BY:

P R

O J E

C T

T

IT

L E

CHECKED BY:

DATE:

PROJECT #:

N

O R

R

E E

T S

P A

N I S

H

F

O R

K

U

T A

H

W W

W K

M A

A R

C H

I T

E C

T S

C

O M

REVISIONS:

T H

IS

P

R

IN

T A

N D

A L L I N

F O

R M

A T

IO

N

H E

R E

O N

I S

T H

E P

R O

P E

R T

Y O

F K

M A

A R

C H

IT

E

C T

S A

N D

S H

A L L N

O T

B E

U S

E D

O N

A N

Y O

T H

E R

J O

B W

IT

H

O U

T W

R

IT

T E

N P

E R

M

IS

S

IO

N O

F T

H E

A R

C H

IT

E

C T

A s i n d ic a te d /5

/2

:2

:5

A

M

S A

L L Y

M A

U R

O E

L E

M E

N T

A R

Y H

E L P

E R

U

T

C A

R B

O N

C O

U N

T Y

S C

H O

O L D

IS

T

R

IC

T

N

D A

V E

174824

BRS

JR

FEB 2026

A0.4

1/16" = 1'-0"

OVERALL DEMOLITION FLOOR PLAN

N O

R T

H

N O

T F

O R

C O

N S

T R

U C

T

IO

N R

E F

E R

E N

C E

O N

LY

DN

DN

C O

O L E

R

TB

TB

TB

MB

MB

TV

TB

MB

TB

TV

TV

TB

MB MB

TB

TV MBMB

MB

MB

TB

MB

TV

TB

TB

TB

TB

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

8 8

(ABOVE)

(ABOVE)

6'-6"

11'-1 1/2"

A117E

(ABOVE)

A119E

A118E

B107E

B108E

- APPROXIMATE LOCATION OF SAW-CUTTING

FOR NEW SEWER LINE. CONTRACTOR IS TO

BACKFILL AND INSTALL A NEW SLAB AFTER

INSTALLATION - COORDINATE WITH PLUMBING

PLANS

DEMOLITION LEGEND

GENERAL DEMOLITION NOTES

1 - CONTRACTOR TO PROVIDE PLYWOOD

SHEATHING, INSULATION, AND MEMBRANE FOR

WALLS & ROOF TO PROTECT INTERIOR FROM

WEATHER DURING DEMOLITION AND

CONSTRUCTION.

2 - ALL PLUMBING, HVAC, & ELECTRICAL WILL

BE RE-ROUTED OR MODIFIED TO ALLOW

COMPLETE CONTINUITY OF UTILITY SERVICE

FOR SCHOOL OPERATION DURING

CONSTRUCTION.

3 - CONTRACTOR SHALL COORDINATE

DEMOLITION WITH DISTRICT AND ASBESTOS

REMOVAL CONTRACTOR. (ASBESTOS

ABATEMENT BY DISTRICT)

4 - STAGING TO BE DETERMINED BY GENERAL

CONTRACTOR. (COSTS FOR TEMPORARY

STAGING BY CONTRACTOR.)

5 - CONSTRUCTION FENCING SEPARATE NEW

CONSTRUCTION AND DEMOLITION FROM ALL

STUDENT ACTIVITY. (COSTS FOR TEMPORARY

CONSTRUCTION FENCING BY CONTRACTOR.)

6 - CONSTRUCTION AND DEMOLITION ACCESS

TO BE DETERMINED BY GENERAL

CONTRACTOR AND OWNER.

7 - ASBESTOS ABATEMENT BY DISTRICT.

8 - CONTRACTOR SHALL REVIEW THE

PLUMBING, MECHANICAL AND ELECTRICAL

SHEETS FOR ADDITIONAL INFORMATION ON

THE DEMOLITION OF PARTS OF THE BUILDING.

9 - PATCH AND REPAIR EXISTING CONDITIONS

AS REQUIRED DUE TO NEW CONSTRUCTION

AND DEMOLITION

ROOFING DEMOLITION NOTE

A - CONTRACTOR TO INCLUDE ANY NEW ROOF

DECKING, 6" RIGID INSULATION, CURBING,

METAL ROOF PANELS AND SHEET MEMBRANE

ROOFING AT ANY ROOF PENETRATION DUE TO

CONSTRUCTION. COORDINATE ALL ROOF

PENETRATIONS WITH STRUCTURAL,

MECHANICAL, ELECTRICAL, AND KITCHEN

SHEETS FOR ROOF REPAIRS

B - CONTRACTOR TO ADD NEW PLYWOOD

DECKING, 6" RIGID INSULATION, METAL ROOF

PANELS AND ROOF MEMBRANCE OVER

OPENING CREATED AT CURBS BY REMOVAL OF

ANY EXISTING UNITS. REFER TO MECHANICAL

DEMOLITION SHEET FOR LOCATIONS.

CONCRETE GRINDING NOTE

PROVIDE 2000 SQ. FT. OF CONCRETE FLOOR GRINDING FOR

NEW CONSTRUCTION. (THIS APPLIES TO ALL FLOORS OTHER

THAN POLISHED CONCRETE FLOOR AREAS.) CONCRETE

FLOORS SHALL BE GROUND SMOOTH AND LEVEL TO WITHIN

+/- 1/8" WITHIN A 10'-0" RADIUS. THE CONTRACTOR SHALL ALSO

PROVIDE A UNIT COST PER SQ. FT. FOR THIS GRINDING. THE

CONTRACTOR SHALL ERECT AND MAINTAIN DUST BARRIERS IN

THE AREA THE CONCRETE GRINDING IS TAKING PLACE.

CONCRETE FLOOR NOTE

CONTRACTOR TO PREPARE THE NEW CONCRETE FLOORS

FOR THE INSTALLATION OF ALL THE FLOOR FINISHES AS

REQUIRED BY THE ARCHITECT AND OWNER.

KEY PLAN

AREA "A"

AREA "B"

AREA "C"

AREA "D"

DRAWN BY:

P R

O J E

C T

T

IT

L E

CHECKED BY:

DATE:

PROJECT #:

N

O R

R

E E

T S

P A

N I S

H

F

O R

K

U

T A

H

W W

W K

M A

A R

C H

I T

E C

T S

C

O M

REVISIONS:

T H

IS

P

R

IN

T A

N D

A L L I N

F O

R M

A T

IO

N

H E

R E

O N

I S

T H

E P

R O

P E

R T

Y O

F K

M A

A R

C H

IT

E

C T

S A

N D

S H

A L L N

O T

B E

U S

E D

O N

A N

Y O

T H

E R

J O

B W

IT

H

O U

T W

R

IT

T E

N P

E R

M

IS

S

IO

N O

F T

H E

A R

C H

IT

E

C T

A s i n d ic a te d /5

/2

:2

:1

A

M

S A

L L Y

M A

U R

O E

L E

M E

N T

A R

Y H

E L P

E R

U

T

C A

R B

O N

C O

U N

T Y

S C

H O

O L D

IS

T

R

IC

T

N

D A

V E

174824

BRS

JR

FEB 2026

A0.4A

1/8" = 1'-0"

DEMO FLOOR PLAN AREA "A"

SHEET NOTES

1 - EXISTING DOOR AND FRAME TO BE REMOVED - PREPARE

OPENING FOR NEW DOOR AND FRAME - SEE DOOR SCHEDULE

2 - EXISTING WINDOW AND FRAME TO BE REMOVED - PREPARE

OPENING FOR NEW WINDOW AND FRAME

3 - REMOVE AND STORE TACK BOARD, TV, OR MARKERBOARD.

PROTECT DURING CONSTRUCTION. THIS IS TO BE REINSTALLED

IN SAME LOCATION AFTER NEW CONSTRUCTION IS COMPLETED.

PROVIDE BACKING AS REQUIRED

4 - REMOVE EXISTING MILLWORK AND COUTNER TOP AS REQUIRED

FOR NEW PLUMBING. STORE AND REINSTALL MILLWORK AND

COUNTER TOP ONCE CONSTUCTION IS COMPLETED. PATCH AND

REPAIR AS NEEDED.

5 - REMOVE EXISTING CEILING, LIGHT FIXTURES, AND MECHANICAL

EQUIPMENT. PREPARE FOR NEW CEILING, LIGHT FIXTURES AND

MECHANICAL EQUIPMENT.SEE MECHANICAL, PLUMBING AND

ELECTRICAL SHEETS

6 - EXISTING FLOORING TO BE REMOVED. FLOOR IS TO BE

PREPARED FOR NEW FLOORING. COORDINATE WITH FLOOR

PLANS AND FINISH SCHEDULE.

7 - EXISTING DOOR & HARDWARE TO BE REMOVED AND STORED

DURING CONSTRUCTION. PATCH AND REPAIR ANY DAMAGES TO

THE DOOR FRAME DUE TO CONSTRUCTION. REINSTALL DOOR

AND HARDWARE ONCE CONSTRUCTION IS COMPLETED.

8 - EXISTING SHOWER POLE TO BE REMOVED

9 - EXISTING KITCHEN EQUIPMENT IS TO BE DISCONNECTED

STORED DURING CONSTRUCTION AND REINSTALLED BACK TO

ORIGINAL WORKING ORDER AFTER CONSTRUCTION.

(CONTRACTOR IS TO COORDIANTE WITH OWNER, HEALTH

DEPARTMENT AND FIRE MARSHAL ON THE RE-INSTALLATION.)

10 - SAW-CUTTING APPROXIMATE LOCATION, REMOVE AND

REPLACE FLOORING AS NEEDED TO ALLOW ACCESS FOR NEW

SEWER - COORDINATE WITH PLUMBING

11 - EXISTING PLUMBING FIXTURE TO BE REMOVED - SEE PLUMBING

SHEETS

12 - EXISTING MILLWORK TO BE REMOVED.

13 - EXISTING TACK BOARD TO BE REMOVED

14 - EXISTING WALL TO BE REMOVED

N O

R T

H

SHEET NOTES

15 - EXISTING DOOR AND FRAME TO BE REMOVED.

16 - WALL MOUNTED STEEL LADDER TO BE REMOVED

17 - PLUMBING FIXTURES TO BE REMOVED AND REINSTALLED

AFTER CONSTRUCTION

N O

T F

O R

C O

N S

T R

U C

T

IO

N R

E F

E R

E N

C E

O N

LY

MB

TB

TB

TB

TB

TV

MB

MB

TV MBMB

MB

TB

MB

MB

MB

MB TB

MB

MB

TV

MB

TB

TB

TB

TB

TB

TB

TB

TB

TB

MB

MB

TBTB

TV

TB

MB

TB

TB

TV

MB

TB

TB

TV

3 3

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

B116E

B115E

(ABOVE)

B107E

B108E

- APPROXIMATE LOCATION OF SAW-CUTTING

FOR NEW SEWER LINE. CONTRACTOR IS TO

BACKFILL AND INSTALL A NEW SLAB AFTER

INSTALLATION - COORDINATE WITH PLUMBING

PLANS

DEMOLITION LEGEND

GENERAL DEMOLITION NOTES

1 - CONTRACTOR TO PROVIDE PLYWOOD

SHEATHING, INSULATION, AND MEMBRANE FOR

WALLS & ROOF TO PROTECT INTERIOR FROM

WEATHER DURING DEMOLITION AND

CONSTRUCTION.

2 - ALL PLUMBING, HVAC, & ELECTRICAL WILL

BE RE-ROUTED OR MODIFIED TO ALLOW

COMPLETE CONTINUITY OF UTILITY SERVICE

FOR SCHOOL OPERATION DURING

CONSTRUCTION.

3 - CONTRACTOR SHALL COORDINATE

DEMOLITION WITH DISTRICT AND ASBESTOS

REMOVAL CONTRACTOR. (ASBESTOS

ABATEMENT BY DISTRICT)

4 - STAGING TO BE DETERMINED BY GENERAL

CONTRACTOR. (COSTS FOR TEMPORARY

STAGING BY CONTRACTOR.)

5 - CONSTRUCTION FENCING SEPARATE NEW

CONSTRUCTION AND DEMOLITION FROM ALL

STUDENT ACTIVITY. (COSTS FOR TEMPORARY

CONSTRUCTION FENCING BY CONTRACTOR.)

6 - CONSTRUCTION AND DEMOLITION ACCESS

TO BE DETERMINED BY GENERAL

CONTRACTOR AND OWNER.

7 - ASBESTOS ABATEMENT BY DISTRICT.

8 - CONTRACTOR SHALL REVIEW THE

PLUMBING, MECHANICAL AND ELECTRICAL

SHEETS FOR ADDITIONAL INFORMATION ON

THE DEMOLITION OF PARTS OF THE BUILDING.

9 - PATCH AND REPAIR EXISTING CONDITIONS

AS REQUIRED DUE TO NEW CONSTRUCTION

AND DEMOLITION

ROOFING DEMOLITION NOTE

A - CONTRACTOR TO INCLUDE ANY NEW ROOF

DECKING, 6" RIGID INSULATION, CURBING,

METAL ROOF PANELS AND SHEET MEMBRANE

ROOFING AT ANY ROOF PENETRATION DUE TO

CONSTRUCTION. COORDINATE ALL ROOF

PENETRATIONS WITH STRUCTURAL,

MECHANICAL, ELECTRICAL, AND KITCHEN

SHEETS FOR ROOF REPAIRS

B - CONTRACTOR TO ADD NEW PLYWOOD

DECKING, 6" RIGID INSULATION, METAL ROOF

PANELS AND ROOF MEMBRANCE OVER

OPENING CREATED AT CURBS BY REMOVAL OF

ANY EXISTING UNITS. REFER TO MECHANICAL

DEMOLITION SHEET FOR LOCATIONS.

CONCRETE GRINDING NOTE

PROVIDE 2000 SQ. FT. OF CONCRETE FLOOR GRINDING FOR

NEW CONSTRUCTION. (THIS APPLIES TO ALL FLOORS OTHER

THAN POLISHED CONCRETE FLOOR AREAS.) CONCRETE

FLOORS SHALL BE GROUND SMOOTH AND LEVEL TO WITHIN

+/- 1/8" WITHIN A 10'-0" RADIUS. THE CONTRACTOR SHALL ALSO

PROVIDE A UNIT COST PER SQ. FT. FOR THIS GRINDING. THE

CONTRACTOR SHALL ERECT AND MAINTAIN DUST BARRIERS IN

THE AREA THE CONCRETE GRINDING IS TAKING PLACE.

CONCRETE FLOOR NOTE

CONTRACTOR TO PREPARE THE NEW CONCRETE FLOORS

FOR THE INSTALLATION OF ALL THE FLOOR FINISHES AS

REQUIRED BY THE ARCHITECT AND OWNER.

KEY PLAN

AREA "A"

AREA "B"

AREA "C"

AREA "D"

DRAWN BY:

P R

O J E

C T

T

IT

L E

CHECKED BY:

DATE:

PROJECT #:

N

O R

R

E E

T S

P A

N I S

H

F

O R

K

U

T A

H

W W

W K

M A

A R

C H

I T

E C

T S

C

O M

REVISIONS:

T H

IS

P

R

IN

T A

N D

A L L I N

F O

R M

A T

IO

N

H E

R E

O N

I S

T H

E P

R O

P E

R T

Y O

F K

M A

A R

C H

IT

E

C T

S A

N D

S H

A L L N

O T

B E

U S

E D

O N

A N

Y O

T H

E R

J O

B W

IT

H

O U

T W

R

IT

T E

N P

E R

M

IS

S

IO

N O

F T

H E

A R

C H

IT

E

C T

A s i n d ic a te d /5

/2

:2

:2

A

M

S A

L L Y

M A

U R

O E

L E

M E

N T

A R

Y H

E L P

E R

U

T

C A

R B

O N

C O

U N

T Y

S C

H O

O L D

IS

T

R

IC

T

N

D A

V E

174824

BRS

JR

FEB 2026

A0.4B1/8" = 1'-0"

DEMO FLOOR PLAN AREA "B"

SHEET NOTES

1 - EXISTING DOOR AND FRAME TO BE REMOVED - PREPARE

OPENING FOR NEW DOOR AND FRAME - SEE DOOR SCHEDULE

2 - EXISTING WINDOW AND FRAME TO BE REMOVED - PREPARE

OPENING FOR NEW WINDOW AND FRAME

3 - REMOVE AND STORE TACK BOARD, TV, OR MARKERBOARD.

PROTECT DURING CONSTRUCTION. THIS IS TO BE REINSTALLED

IN SAME LOCATION AFTER NEW CONSTRUCTION IS COMPLETED.

PROVIDE BACKING AS REQUIRED

4 - REMOVE EXISTING MILLWORK AND COUTNER TOP AS REQUIRED

FOR NEW PLUMBING. STORE AND REINSTALL MILLWORK AND

COUNTER TOP ONCE CONSTUCTION IS COMPLETED. PATCH AND

REPAIR AS NEEDED.

5 - EXISTING FLOORING TO BE REMOVED. FLOOR IS TO BE

PREPARED FOR NEW FLOORING. COORDINATE WITH FLOOR

PLANS AND FINISH SCHEDULE.

6 - REMOVE EXISTING CEILING, LIGHT FIXTURES, AND MECHANICAL

EQUIPMENT. PREPARE FOR NEW CEILING, LIGHT FIXTURES AND

MECHANICAL EQUIPMENT.SEE MECHANICAL, PLUMBING AND

ELECTRICAL SHEETS

7 - EXISTING DOOR & HARDWARE TO BE REMOVED AND STORED

DURING CONSTRUCTION. PATCH AND REPAIR ANY DAMAGES TO

THE DOOR FRAME DUE TO CONSTRUCTION. REINSTALL DOOR

AND HARDWARE ONCE CONSTRUCTION IS COMPLETED.

8 - SAW-CUTTING APPROXIMATE LOCATION, REMOVE AND

REPLACE FLOORING AS NEEDED TO ALLOW ACCESS FOR NEW

SEWER - COORDINATE WITH PLUMBING

9 - EXISTING PLUMBING FIXTURE TO BE REMOVED - SEE PLUMBING

SHEETS

10 - EXISTING DOOR AND FRAME TO BE REMOVED.

11 - EXISTING MILLWORK TO BE REMOVED.

12 - PLUMBING FIXTURES TO BE REMOVED AND REINSTALLED

AFTER CONSTRUCTION

N O

R T

H

N O

T F

O R

C O

N S

T R

U C

T

IO

N R

E F

E R

E N

C E

O N

LY

UP

TB

TV

TB

MB

TB

TV

MB

TB

TB

TB

TV

MB

TB

MB

TV

MB

TV

MB

MB

TV

MB

TB

TB

TV

MB

MB

MB

MB

TV

TB

TB

MB

TV

MB

MB

TV

TB

MB

TV

TV

TB

MB

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

- APPROXIMATE LOCATION OF SAW-CUTTING

FOR NEW SEWER LINE. CONTRACTOR IS TO

BACKFILL AND INSTALL A NEW SLAB AFTER

INSTALLATION - COORDINATE WITH PLUMBING

PLANS

DEMOLITION LEGEND

GENERAL DEMOLITION NOTES

1 - CONTRACTOR TO PROVIDE PLYWOOD

SHEATHING, INSULATION, AND MEMBRANE FOR

WALLS & ROOF TO PROTECT INTERIOR FROM

WEATHER DURING DEMOLITION AND

CONSTRUCTION.

2 - ALL PLUMBING, HVAC, & ELECTRICAL WILL

BE RE-ROUTED OR MODIFIED TO ALLOW

COMPLETE CONTINUITY OF UTILITY SERVICE

FOR SCHOOL OPERATION DURING

CONSTRUCTION.

3 - CONTRACTOR SHALL COORDINATE

DEMOLITION WITH DISTRICT AND ASBESTOS

REMOVAL CONTRACTOR. (ASBESTOS

ABATEMENT BY DISTRICT)

4 - STAGING TO BE DETERMINED BY GENERAL

CONTRACTOR. (COSTS FOR TEMPORARY

STAGING BY CONTRACTOR.)

5 - CONSTRUCTION FENCING SEPARATE NEW

CONSTRUCTION AND DEMOLITION FROM ALL

STUDENT ACTIVITY. (COSTS FOR TEMPORARY

CONSTRUCTION FENCING BY CONTRACTOR.)

6 - CONSTRUCTION AND DEMOLITION ACCESS

TO BE DETERMINED BY GENERAL

CONTRACTOR AND OWNER.

7 - ASBESTOS ABATEMENT BY DISTRICT.

8 - CONTRACTOR SHALL REVIEW THE

PLUMBING, MECHANICAL AND ELECTRICAL

SHEETS FOR ADDITIONAL INFORMATION ON

THE DEMOLITION OF PARTS OF THE BUILDING.

9 - PATCH AND REPAIR EXISTING CONDITIONS

AS REQUIRED DUE TO NEW CONSTRUCTION

AND DEMOLITION

CONCRETE GRINDING NOTE

PROVIDE 2000 SQ. FT. OF CONCRETE FLOOR GRINDING FOR

NEW CONSTRUCTION. (THIS APPLIES TO ALL FLOORS OTHER

THAN POLISHED CONCRETE FLOOR AREAS.) CONCRETE

FLOORS SHALL BE GROUND SMOOTH AND LEVEL TO WITHIN

+/- 1/8" WITHIN A 10'-0" RADIUS. THE CONTRACTOR SHALL ALSO

PROVIDE A UNIT COST PER SQ. FT. FOR THIS GRINDING. THE

CONTRACTOR SHALL ERECT AND MAINTAIN DUST BARRIERS IN

THE AREA THE CONCRETE GRINDING IS TAKING PLACE.

CONCRETE FLOOR NOTE

CONTRACTOR TO PREPARE THE NEW CONCRETE FLOORS

FOR THE INSTALLATION OF ALL THE FLOOR FINISHES AS

REQUIRED BY THE ARCHITECT AND OWNER.

ROOFING DEMOLITION NOTE

A - CONTRACTOR TO INCLUDE ANY NEW ROOF

DECKING, 6" RIGID INSULATION, CURBING,

METAL ROOF PANELS AND SHEET MEMBRANE

ROOFING AT ANY ROOF PENETRATION DUE TO

CONSTRUCTION. COORDINATE ALL ROOF

PENETRATIONS WITH STRUCTURAL,

MECHANICAL, ELECTRICAL, AND KITCHEN

SHEETS FOR ROOF REPAIRS

B - CONTRACTOR TO ADD NEW PLYWOOD

DECKING, 6" RIGID INSULATION, METAL ROOF

PANELS AND ROOF MEMBRANCE OVER

OPENING CREATED AT CURBS BY REMOVAL OF

ANY EXISTING UNITS. REFER TO MECHANICAL

DEMOLITION SHEET FOR LOCATIONS.

KEY PLAN

AREA "A"

AREA "B"

AREA "C"

AREA "D"

DRAWN BY:

P R

O J E

C T

T

IT

L E

CHECKED BY:

DATE:

PROJECT #:

N

O R

R

E E

T S

P A

N I S

H

F

O R

K

U

T A

H

W W

W K

M A

A R

C H

I T

E C

T S

C

O M

REVISIONS:

T H

IS

P

R

IN

T A

N D

A L L I N

F O

R M

A T

IO

N

H E

R E

O N

I S

T H

E P

R O

P E

R T

Y O

F K

M A

A R

C H

IT

E

C T

S A

N D

S H

A L L N

O T

B E

U S

E D

O N

A N

Y O

T H

E R

J O

B W

IT

H

O U

T W

R

IT

T E

N P

E R

M

IS

S

IO

N O

F T

H E

A R

C H

IT

E

C T

A s i n d ic a te d /5

/2

:2

:4

A

M

S A

L L Y

M A

U R

O E

L E

M E

N T

A R

Y H

E L P

E R

U

T

C A

R B

O N

C O

U N

T Y

S C

H O

O L D

IS

T

R

IC

T

N

D A

V E

174824

BRS

JR

FEB 2026

A0.4C

1/8" = 1'-0"

DEMO FLOOR PLAN AREA "C"

SHEET NOTES

1 - REMOVE EXISTING CEILING, LIGHT FIXTURES, AND MECHANICAL

EQUIPMENT. PREPARE FOR NEW CEILING, LIGHT FIXTURES AND

MECHANICAL EQUIPMENT.SEE MECHANICAL, PLUMBING AND

ELECTRICAL SHEETS

2 - SAW-CUTTING APPROXIMATE LOCATION, REMOVE AND

REPLACE FLOORING AS NEEDED TO ALLOW ACCESS FOR NEW

SEWER - COORDINATE WITH PLUMBING

3 - EXISTING DOOR & HARDWARE TO BE REMOVED AND STORED

DURING CONSTRUCTION. PATCH AND REPAIR ANY DAMAGES TO

THE DOOR FRAME DUE TO CONSTRUCTION. REINSTALL DOOR

AND HARDWARE ONCE CONSTRUCTION IS COMPLETED.

4 - PLUMBING FIXTURES TO BE REMOVED AND REINSTALLED

AFTER CONSTRUCTION

N O

R T

H

N O

T F

O R

C O

N S

T R

U C

T

IO

N R

E F

E R

E N

C E

O N

LY

- APPROXIMATE LOCATION OF SAW-CUTTING

FOR NEW SEWER LINE. CONTRACTOR IS TO

BACKFILL AND INSTALL A NEW SLAB AFTER

INSTALLATION - COORDINATE WITH PLUMBING

PLANS

DEMOLITION LEGEND

GENERAL DEMOLITION NOTES

1 - CONTRACTOR TO PROVIDE PLYWOOD

SHEATHING, INSULATION, AND MEMBRANE FOR

WALLS & ROOF TO PROTECT INTERIOR FROM

WEATHER DURING DEMOLITION AND

CONSTRUCTION.

2 - ALL PLUMBING, HVAC, & ELECTRICAL WILL

BE RE-ROUTED OR MODIFIED TO ALLOW

COMPLETE CONTINUITY OF UTILITY SERVICE

FOR SCHOOL OPERATION DURING

CONSTRUCTION.

3 - CONTRACTOR SHALL COORDINATE

DEMOLITION WITH DISTRICT AND ASBESTOS

REMOVAL CONTRACTOR. (ASBESTOS

ABATEMENT BY DISTRICT)

4 - STAGING TO BE DETERMINED BY GENERAL

CONTRACTOR. (COSTS FOR TEMPORARY

STAGING BY CONTRACTOR.)

5 - CONSTRUCTION FENCING SEPARATE NEW

CONSTRUCTION AND DEMOLITION FROM ALL

STUDENT ACTIVITY. (COSTS FOR TEMPORARY

CONSTRUCTION FENCING BY CONTRACTOR.)

6 - CONSTRUCTION AND DEMOLITION ACCESS

TO BE DETERMINED BY GENERAL

CONTRACTOR AND OWNER.

7 - ASBESTOS ABATEMENT BY DISTRICT.

8 - CONTRACTOR SHALL REVIEW THE

PLUMBING, MECHANICAL AND ELECTRICAL

SHEETS FOR ADDITIONAL INFORMATION ON

THE DEMOLITION OF PARTS OF THE BUILDING.

9 - PATCH AND REPAIR EXISTING CONDITIONS

AS REQUIRED DUE TO NEW CONSTRUCTION

AND DEMOLITION

ROOFING DEMOLITION NOTE

A - CONTRACTOR TO INCLUDE ANY NEW ROOF

DECKING, 6" RIGID INSULATION, CURBING,

METAL ROOF PANELS AND SHEET MEMBRANE

ROOFING AT ANY ROOF PENETRATION DUE TO

CONSTRUCTION. COORDINATE ALL ROOF

PENETRATIONS WITH STRUCTURAL,

MECHANICAL, ELECTRICAL, AND KITCHEN

SHEETS FOR ROOF REPAIRS

B - CONTRACTOR TO ADD NEW PLYWOOD

DECKING, 6" RIGID INSULATION, METAL ROOF

PANELS AND ROOF MEMBRANCE OVER

OPENING CREATED AT CURBS BY REMOVAL OF

ANY EXISTING UNITS. REFER TO MECHANICAL

DEMOLITION SHEET FOR LOCATIONS.

CONCRETE GRINDING NOTE

PROVIDE 2000 SQ. FT. OF CONCRETE FLOOR GRINDING FOR

NEW CONSTRUCTION. (THIS APPLIES TO ALL FLOORS OTHER

THAN POLISHED CONCRETE FLOOR AREAS.) CONCRETE

FLOORS SHALL BE GROUND SMOOTH AND LEVEL TO WITHIN

+/- 1/8" WITHIN A 10'-0" RADIUS. THE CONTRACTOR SHALL ALSO

PROVIDE A UNIT COST PER SQ. FT. FOR THIS GRINDING. THE

CONTRACTOR SHALL ERECT AND MAINTAIN DUST BARRIERS IN

THE AREA THE CONCRETE GRINDING IS TAKING PLACE.

CONCRETE FLOOR NOTE

CONTRACTOR TO PREPARE THE NEW CONCRETE FLOORS

FOR THE INSTALLATION OF ALL THE FLOOR FINISHES AS

REQUIRED BY THE ARCHITECT AND OWNER.

KEY PLAN

AREA "A"

AREA "B"

AREA "C"

AREA "D"

DRAWN BY:

P R

O J E

C T

T

IT

L E

CHECKED BY:

DATE:

PROJECT #:

N

O R

R

E E

T S

P A

N I S

H

F

O R

K

U

T A

H

W W

W K

M A

A R

C H

I T

E C

T S

C

O M

REVISIONS:

T H

IS

P

R

IN

T A

N D

A L L I N

F O

R M

A T

IO

N

H E

R E

O N

I S

T H

E P

R O

P E

R T

Y O

F K

M A

A R

C H

IT

E

C T

S A

N D

S H

A L L N

O T

B E

U S

E D

O N

A N

Y O

T H

E R

J O

B W

IT

H

O U

T W

R

IT

T E

N P

E R

M

IS

S

IO

N O

F T

H E

A R

C H

IT

E

C T

A s i n d ic a te d /5

/2

:2

:4

A

M

S A

L L Y

M A

U R

O E

L E

M E

N T

A R

Y H

E L P

E R

U

T

C A

R B

O N

C O

U N

T Y

S C

H O

O L D

IS

T

R

IC

T

N

D A

V E

174824

BRS

JR

FEB 2026

A0.4D

1/8" = 1'-0"

DEMO FLOOR PLAN AREA "D"

SHEET NOTES

1 - SAW-CUTTING APPROXIMATE LOCATION, REMOVE AND

REPLACE FLOORING AS NEEDED TO ALLOW ACCESS FOR NEW

SEWER - COORDINATE WITH PLUMBING

2 - PLUMBING FIXTURES TO BE REMOVED AND REINSTALLED

AFTER CONSTRUCTION

N O

R T

H

N O

T F

O R

C O

N S

T R

U C

T

IO

N R

E F

E R

E N

C E

O N

LY

KEY PLAN

AREA "A"

AREA "B"

AREA "C"

AREA "D"

DRAWN BY:

P R

O J E

C T

T

IT

L E

CHECKED BY:

DATE:

PROJECT #:

N

O R

R

E E

T S

P A

N I S

H

F

O R

K

U

T A

H

W W

W K

M A

A R

C H

I T

E C

T S

C

O M

REVISIONS:

T H

IS

P

R

IN

T A

N D

A L L I N

F O

R M

A T

IO

N

H E

R E

O N

I S

T H

E P

R O

P E

R T

Y O

F K

M A

A R

C H

IT

E

C T

S A

N D

S H

A L L N

O T

B E

U S

E D

O N

A N

Y O

T H

E R

J O

B W

IT

H

O U

T W

R

IT

T E

N P

E R

M

IS

S

IO

N O

F T

H E

A R

C H

IT

E

C T

A s i n d ic a te d /5

/2

:2

:4

A

M

S A

L L Y

M A

U R

O E

L E

M E

N T

A R

Y H

E L P

E R

U

T

C A

R B

O N

C O

U N

T Y

S C

H O

O L D

IS

T

R

IC

T

N

D A

V E

174824

BRS

JR

FEB 2026

A0.5

1/8" = 1'-0"

MEZZANINE FLOOR PLAN AREA "A"

1/8" = 1'-0"

MEZZANINE FLOOR PLAN AREA "B"

1/8" = 1'-0"

MEZZANINE FLOOR PLAN AREA "C"

1/8" = 1'-0"

MEZZANINE FLOOR PLAN AREA "D"

1/8" = 1'-0"

BASEMENT

N O

T F

O R

C O

N S

T R

U C

T

IO

N R

E F

E R

E N

C E

O N

LY

DRAWN BY:

P R

O J E

C T

T

IT

L E

CHECKED BY:

DATE:

PROJECT #:

N

O R

R

E E

T S

P A

N I S

H

F

O R

K

U

T A

H

W W

W K

M A

A R

C H

I T

E C

T S

C

O M

REVISIONS:

T H

IS

P

R

IN

T A

N D

A L L I N

F O

R M

A T

IO

N

H E

R E

O N

I S

T H

E P

R O

P E

R T

Y O

F K

M A

A R

C H

IT

E

C T

S A

N D

S H

A L L N

O T

B E

U S

E D

O N

A N

Y O

T H

E R

J O

B W

IT

H

O U

T W

R

IT

T E

N P

E R

M

IS

S

IO

N O

F T

H E

A R

C H

IT

E

C T

/1

/5

/2

:2

:4

A

M

S A

L L Y

M A

U R

O E

L E

M E

N T

A R

Y H

E L P

E R

U

T

C A

R B

O N

C O

U N

T Y

S C

H O

O L D

IS

T

R

IC

T

N

D A

V E

174824

BRS

JR

FEB 2026

A0.7

1/16" = 1'-0"

OVERALL DEMOLITION ROOF PLAN

N O

R T

H

N O

T F

O R

C O

N S

T R

U C

T

IO

N R

E F

E R

E N

C E

O N

LY

KEY PLAN

AREA "A"

AREA "B"

AREA "C"

AREA "D"

DRAWN BY:

P R

O J E

C T

T

IT

L E

CHECKED BY:

DATE:

PROJECT #:

N

O R

R

E E

T S

P A

N I S

H

F

O R

K

U

T A

H

W W

W K

M A

A R

C H

I T

E C

T S

C

O M

REVISIONS:

T H

IS

P

R

IN

T A

N D

A L L I N

F O

R M

A T

IO

N

H E

R E

O N

I S

T H

E P

R O

P E

R T

Y O

F K

M A

A R

C H

IT

E

C T

S A

N D

S H

A L L N

O T

B E

U S

E D

O N

A N

Y O

T H

E R

J O

B W

IT

H

O U

T W

R

IT

T E

N P

E R

M

IS

S

IO

N O

F T

H E

A R

C H

IT

E

C T

A s i n d ic a te d /5

/2

:2

:4

A

M

S A

L L Y

M A

U R

O E

L E

M E

N T

A R

Y H

E L P

E R

U

T

C A

R B

O N

C O

U N

T Y

S C

H O

O L D

IS

T

R

IC

T

N

D A

V E

174824

BRS

JR

FEB 2026

A0.7A

1/8" = 1'-0"

DEMO ROOF PLAN AREA "A"

SHEET NOTES

1 - EXISTING ROOF DOME TO BE REMOVED FOR NEW MECHANICAL

UNITS

2 - EXISTING ROOF MEMBRANE TO BE REMOVED.

N O

R T

H

N O

T F

O R

C O

N S

T R

U C

T

IO

N R

E F

E R

E N

C E

O N

LY

KEY PLAN

AREA "A"

AREA "B"

AREA "C"

AREA "D"

DRAWN BY:

P R

O J E

C T

T

IT

L E

CHECKED BY:

DATE:

PROJECT #:

N

O R

R

E E

T S

P A

N I S

H

F

O R

K

U

T A

H

W W

W K

M A

A R

C H

I T

E C

T S

C

O M

REVISIONS:

T H

IS

P

R

IN

T A

N D

A L L I N

F O

R M

A T

IO

N

H E

R E

O N

I S

T H

E P

R O

P E

R T

Y O

F K

M A

A R

C H

IT

E

C T

S A

N D

S H

A L L N

O T

B E

U S

E D

O N

A N

Y O

T H

E R

J O

B W

IT

H

O U

T W

R

IT

T E

N P

E R

M

IS

S

IO

N O

F T

H E

A R

C H

IT

E

C T

A s i n d ic a te d /5

/2

:2

:4

A

M

S A

L L Y

M A

U R

O E

L E

M E

N T

A R

Y H

E L P

E R

U

T

C A

R B

O N

C O

U N

T Y

S C

H O

O L D

IS

T

R

IC

T

N

D A

V E

174824

BRS

JR

FEB 2026

A0.7B 1/8" = 1'-0"

DEMO ROOF PLAN AREA "B"

N O

R T

H

SHEET NOTES

1 - EXISTING ROOF DOME TO BE REMOVED FOR NEW MECHANICAL

UNITS

2 - EXISTING ROOF MEMBRANE TO BE REMOVED.

N O

T F

O R

C O

N S

T R

U C

T

IO

N R

E F

E R

E N

C E

O N

LY

KEY PLAN

AREA "A"

AREA "B"

AREA "C"

AREA "D"

DRAWN BY:

P R

O J E

C T

T

IT

L E

CHECKED BY:

DATE:

PROJECT #:

N

O R

R

E E

T S

P A

N I S

H

F

O R

K

U

T A

H

W W

W K

M A

A R

C H

I T

E C

T S

C

O M

REVISIONS:

T H

IS

P

R

IN

T A

N D

A L L I N

F O

R M

A T

IO

N

H E

R E

O N

I S

T H

E P

R O

P E

R T

Y O

F K

M A

A R

C H

IT

E

C T

S A

N D

S H

A L L N

O T

B E

U S

E D

O N

A N

Y O

T H

E R

J O

B W

IT

H

O U

T W

R

IT

T E

N P

E R

M

IS

S

IO

N O

F T

H E

A R

C H

IT

E

C T

A s i n d ic a te d /5

/2

:2

:4

A

M

S A

L L Y

M A

U R

O E

L E

M E

N T

A R

Y H

E L P

E R

U

T

C A

R B

O N

C O

U N

T Y

S C

H O

O L D

IS

T

R

IC

T

N

D A

V E

174824

BRS

JR

FEB 2026

A0.7C

1/8" = 1'-0"

DEMO ROOF PLAN AREA "C"

N O

R T

H

N O

T F

O R

C O

N S

T R

U C

T

IO

N R

E F

E R

E N

C E

O N

LY

KEY PLAN

AREA "A"

AREA "B"

AREA "C"

AREA "D"

DRAWN BY:

P R

O J E

C T

T

IT

L E

CHECKED BY:

DATE:

PROJECT #:

N

O R

R

E E

T S

P A

N I S

H

F

O R

K

U

T A

H

W W

W K

M A

A R

C H

I T

E C

T S

C

O M

REVISIONS:

T H

IS

P

R

IN

T A

N D

A L L I N

F O

R M

A T

IO

N

H E

R E

O N

I S

T H

E P

R O

P E

R T

Y O

F K

M A

A R

C H

IT

E

C T

S A

N D

S H

A L L N

O T

B E

U S

E D

O N

A N

Y O

T H

E R

J O

B W

IT

H

O U

T W

R

IT

T E

N P

E R

M

IS

S

IO

N O

F T

H E

A R

C H

IT

E

C T

A s i n d ic a te d /5

/2

:2

:4

A

M

S A

L L Y

M A

U R

O E

L E

M E

N T

A R

Y H

E L P

E R

U

T

C A

R B

O N

C O

U N

T Y

S C

H O

O L D

IS

T

R

IC

T

N

D A

V E

174824

BRS

JR

FEB 2026

A0.7D

1/8" = 1'-0"

DEMO ROOF PLAN AREA "D"

N O

R T

H

SHEET NOTES

1 - EXISTING ROOF MEMBRANE TO BE REMOVED.

N O

T F

O R

C O

N S

T R

U C

T

IO

N R

E F

E R

E N

C E

O N

LY

DN

DN

UP

F

F

F

J

J

J

J

J

J

J

J

J

J

J J

J

J

J

F

F

F

GENERAL NOTES

A- 1/16TH INCH FLOOR PLAN IS SHOWN FOR

REFERENCE AND COORDINATION ONLY -

REFER TO 1/8TH INCH FLOOR PLANS AREA 'A'

AND AREA 'B' FOR DIMENSIONS AND LAYOUT.

B- ALL FULL HEIGHT WALLS TO BE SEALED

WITH FIRE STOP (FIRE SAFING) BETWEEN

TOP OF WALL AND ROOF DECKING.

C O

O L E

R

8'-0 1/2"

DRAWN BY:

P R

O J E

C T

T

IT

L E

CHECKED BY:

DATE:

PROJECT #:

N

O R

R

E E

T S

P A

N I S

H

F

O R

K

U

T A

H

W W

W K

M A

A R

C H

I T

E C

T S

C

O M

REVISIONS:

T H

IS

P

R

IN

T A

N D

A L L I N

F O

R M

A T

IO

N

H E

R E

O N

I S

T H

E P

R O

P E

R T

Y O

F K

M A

A R

C H

IT

E

C T

S A

N D

S H

A L L N

O T

B E

U S

E D

O N

A N

Y O

T H

E R

J O

B W

IT

H

O U

T W

R

IT

T E

N P

E R

M

IS

S

IO

N O

F T

H E

A R

C H

IT

E

C T

A s i n d ic a te d /5

/2

:2

:1

A

M

S A

L L Y

M A

U R

O E

L E

M E

N T

A R

Y H

E L P

E R

U

T

C A

R B

O N

C O

U N

T Y

S C

H O

O L D

IS

T

R

IC

T

N

D A

V E

174824

BRS

JR

FEB 2026

A1.1

1/16" = 1'-0"

OVERALL MAIN FLOOR PLAN

N O

R T

H

N O

T F

O R

C O

N S

T R

U C

T

IO

N R

E F

E R

E N

C E

O N

LY

DN

W

D

GENERAL DIMENSION NOTE

DUE TO ROUNDING, DIMENSION STRINGS MAY

DIFFER FROM OVER ALL DIMENSIONS.

OVERALL DIMENSIONS ARE TO TAKE

PRECEDENCE OVER DIMENSION STRINGS

C O

O L E

R

TB

MB

TB

TV

TB

TB

TB

MB

MB TV

TV

TB

MB MB

TB

MB TV MB

MB

MB

TV

MB

TB

TB

2 2

66 6 6

A103

A102

A105

A104

A101

A100

A106

A107

A108

A115E

A116E

O

O

O

O

O

O

O

B107E

B108E

A109

5'-0

2'-9 1/2"

P

A118

A119

A120

KEY PLAN

AREA "A"

AREA "B"

AREA "C"

AREA "D"

DRAWN BY:

P R

O J E

C T

T

IT

L E

CHECKED BY:

DATE:

PROJECT #:

N

O R

R

E E

T S

P A

N I S

H

F

O R

K

U

T A

H

W W

W K

M A

A R

C H

I T

E C

T S

C

O M

REVISIONS:

T H

IS

P

R

IN

T A

N D

A L L I N

F O

R M

A T

IO

N

H E

R E

O N

I S

T H

E P

R O

P E

R T

Y O

F K

M A

A R

C H

IT

E

C T

S A

N D

S H

A L L N

O T

B E

U S

E D

O N

A N

Y O

T H

E R

J O

B W

IT

H

O U

T W

R

IT

T E

N P

E R

M

IS

S

IO

N O

F T

H E

A R

C H

IT

E

C T

A s i n d ic a te d /5

/2

:2

:2

A

M

S A

L L Y

M A

U R

O E

L E

M E

N T

A R

Y H

E L P

E R

U

T

C A

R B

O N

C O

U N

T Y

S C

H O

O L D

IS

T

R

IC

T

N

D A

V E

174824

BRS

JR

FEB 2026

A1.1A

SHEET NOTES

1 - REINSTALL TACK BOARD, TV, OR MARKERBOARD IN EXISTING

LOCATION. PROVIDE BACKING AS REQUIRED

2 - EXISTING MILLWORK TO BE REPLACED AFTER NEW

CONSTRCUTION

3 - PLUMBING FIXTURES - SEE PLUMBING SHEETS

4 - DISPLAY TV - SEE ELECTRICAL SHEETS.

5 - TACK BOARD - SEE SPECS.

6 - MARKERBOARD - SEE SPECS.

7 - EXISTING MILLWORK TO REMAIN. PRESERVE AND PROTECT

DURING CONSTRUCTION

8 - EXISTING ALUMINUM WINDOW TO REMAIN.

9 - HOLLOW METAL DOOR AND FRAME (PAINTED) - SEE DOOR

SCHEDULE. COLOR AS SELECTED BY ARCHITECT.

10 - ALUMINUM ENTRY SYSTEM - SEE DOOR SCHEDULE.

11 - EXISTING DOOR AND FRAME TO REMAIN.

12 - EXISTING CONSTRUCTION TO REMAIN. CONTRACTOR TO PATCH

AND REPAIR AS REQUIRED DUE TO DEMOLITION AND NEW

CONSTRUCTION.

13 - EXISTING DOOR & HARDWARE TO BE REMOVED AND STORED

DURING CONSTRUCTION. PATCH AND REPAIR ANY DAMAGES TO

THE DOOR FRAME DUE TO CONSTRUCTION. REINSTALL DOOR

AND HARDWARE ONCE CONSTRUCTION IS COMPLETED.

14 - A.D.A. GRAB BARS - SEE SPECS.

15 - FOLDING SHOWER SEAT - SEE SPECS

16 - HOLLOW METAL DOOR FRAME (PAINTED) AND HARDWOOD

DOOR - SEE DOOR SCHEDULE.

17 - SHIP LADDER (N.I.C)

1/8" = 1'-0"

MAIN FLOOR PLAN AREA "A"

N O

R T

H

N O

T F

O R

C O

N S

T R

U C

T

IO

N R

E F

E R

E N

C E

O N

LY

GENERAL DIMENSION NOTE

DUE TO ROUNDING, DIMENSION STRINGS MAY

DIFFER FROM OVER ALL DIMENSIONS.

OVERALL DIMENSIONS ARE TO TAKE

PRECEDENCE OVER DIMENSION STRINGS

TB TB TB

MB

TB

TV

TV

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TV

TB

TB

MB

MB

MB

TV

MB

MB

MB

TBMB

MB

MBMBTVMB

MB

MB

MB

MB

TB

TV

TB

TB

TB

MB

TB

B100

B101 B102

B103

B104

B105

B106

O

OO

O

O

O

O

O

O

O

O

O

O

O

10 10

2 2

B107E

B108E

ZB109E

B111E

B110E

B112E

B113E

B114E

P

P P

3 3

B107

B108

B116

KEY PLAN

AREA "A"

AREA "B"

AREA "C"

AREA "D"

DRAWN BY:

P R

O J E

C T

T

IT

L E

CHECKED BY:

DATE:

PROJECT #:

N

O R

R

E E

T S

P A

N I S

H

F

O R

K

U

T A

H

W W

W K

M A

A R

C H

I T

E C

T S

C

O M

REVISIONS:

T H

IS

P

R

IN

T A

N D

A L L I N

F O

R M

A T

IO

N

H E

R E

O N

I S

T H

E P

R O

P E

R T

Y O

F K

M A

A R

C H

IT

E

C T

S A

N D

S H

A L L N

O T

B E

U S

E D

O N

A N

Y O

T H

E R

J O

B W

IT

H

O U

T W

R

IT

T E

N P

E R

M

IS

S

IO

N O

F T

H E

A R

C H

IT

E

C T

A s i n d ic a te d /5

/2

:2

:3

A

M

S A

L L Y

M A

U R

O E

L E

M E

N T

A R

Y H

E L P

E R

U

T

C A

R B

O N

C O

U N

T Y

S C

H O

O L D

IS

T

R

IC

T

N

D A

V E

174824

BRS

JR

FEB 2026

A1.1B

SHEET NOTES

1 - REINSTALL TACK BOARD, TV, OR MARKERBOARD IN EXISTING

LOCATION. PROVIDE BACKING AS REQUIRED

2 - EXISTING MILLWORK TO REMAIN. PRESERVE AND PROTECT

DURING CONSTRUCTION

3 - EXISTING MILLWORK TO BE REPLACED AFTER NEW

CONSTRCUTION

4 - PLUMBING FIXTURES - SEE PLUMBING SHEETS

5 - DISPLAY TV - SEE ELECTRICAL SHEETS.

6 - TACK BOARD - SEE SPECS.

7 - MARKERBOARD - SEE SPECS.

8 - EXISTING CONSTRUCTION TO REMAIN. CONTRACTOR TO PATCH

AND REPAIR AS REQUIRED DUE TO DEMOLITION AND NEW

CONSTRUCTION.

9 - HOLLOW METAL DOOR AND FRAME (PAINTED) - SEE DOOR

SCHEDULE. COLOR AS SELECTED BY ARCHITECT.

10 - EXISTING DOOR AND FRAME TO REMAIN.

11 - EXISTING DOOR & HARDWARE TO BE REMOVED AND STORED

DURING CONSTRUCTION. PATCH AND REPAIR ANY DAMAGES TO

THE DOOR FRAME DUE TO CONSTRUCTION. REINSTALL DOOR

AND HARDWARE ONCE CONSTRUCTION IS COMPLETED.

12 - HOLLOW METAL DOOR FRAME (PAINTED) AND HARDWOOD

DOOR - SEE DOOR SCHEDULE.

13 - SHIP LADDER (N.I.C)

1/8" = 1'-0"

MAIN FLOOR PLAN AREA "B"

N O

R T

H

N O

T F

O R

C O

N S

T R

U C

T

IO

N R

E F

E R

E N

C E

O N

LY

TV

TB

TV

MB

TB

TB

TB

TB

2 2

2 2

TV

TV

TB

MB

MB

MB

TV

TV

TB

MB

TB

MB

MB

TV

TV

MB

MB

MB

MB

TV

TV

MB

TB

MB

TV

TV

MB

TB

TB

TB

TB

6 6

7 7

MB

MB

KEY PLAN

AREA "A"

AREA "B"

AREA "C"

AREA "D"

DRAWN BY:

P R

O J E

C T

T

IT

L E

CHECKED BY:

DATE:

PROJECT #:

N

O R

R

E E

T S

P A

N I S

H

F

O R

K

U

T A

H

W W

W K

M A

A R

C H

I T

E C

T S

C

O M

REVISIONS:

T H

IS

P

R

IN

T A

N D

A L L I N

F O

R M

A T

IO

N

H E

R E

O N

I S

T H

E P

R O

P E

R T

Y O

F K

M A

A R

C H

IT

E

C T

S A

N D

S H

A L L N

O T

B E

U S

E D

O N

A N

Y O

T H

E R

J O

B W

IT

H

O U

T W

R

IT

T E

N P

E R

M

IS

S

IO

N O

F T

H E

A R

C H

IT

E

C T

A s i n d ic a te d /5

/2

:2

:4

A

M

S A

L L Y

M A

U R

O E

L E

M E

N T

A R

Y H

E L P

E R

U

T

C A

R B

O N

C O

U N

T Y

S C

H O

O L D

IS

T

R

IC

T

N

D A

V E

174824

BRS

JR

FEB 2026

A1.1C

1/8" = 1'-0"

MAIN FLOOR PLAN AREA "C"

SHEET NOTES

1 - EXISTING MILLWORK TO REMAIN. PRESERVE AND PROTECT

DURING CONSTRUCTION

2 - EXISTING PLUMBING FIXTURES TO REMAIN - SEE PLUMBING

SHEETS.

3 - DISPLAY TV - SEE ELECTRICAL SHEETS.

4 - TACK BOARD - SEE SPECS.

5 - MARKERBOARD - SEE SPECS.

6 - EXISTING DOOR AND FRAME TO REMAIN.

7 - EXISTING ALUMINUM WINDOW TO REMAIN.

N O

R T

H

N O

T F

O R

C O

N S

T R

U C

T

IO

N R

E F

E R

E N

C E

O N

LY

KEY PLAN

AREA "A"

AREA "B"

AREA "C"

AREA "D"

DRAWN BY:

P R

O J E

C T

T

IT

L E

CHECKED BY:

DATE:

PROJECT #:

N

O R

R

E E

T S

P A

N I S

H

F

O R

K

U

T A

H

W W

W K

M A

A R

C H

I T

E C

T S

C

O M

REVISIONS:

T H

IS

P

R

IN

T A

N D

A L L I N

F O

R M

A T

IO

N

H E

R E

O N

I S

T H

E P

R O

P E

R T

Y O

F K

M A

A R

C H

IT

E

C T

S A

N D

S H

A L L N

O T

B E

U S

E D

O N

A N

Y O

T H

E R

J O

B W

IT

H

O U

T W

R

IT

T E

N P

E R

M

IS

S

IO

N O

F T

H E

A R

C H

IT

E

C T

A s i n d ic a te d /5

/2

:2

:5

A

M

S A

L L Y

M A

U R

O E

L E

M E

N T

A R

Y H

E L P

E R

U

T

C A

R B

O N

C O

U N

T Y

S C

H O

O L D

IS

T

R

IC

T

N

D A

V E

174824

BRS

JR

FEB 2026

A1.1D

1/8" = 1'-0"

MAIN FLOOR PLAN AREA "D"

N O

R T

H

SHEET NOTES

1 - EXISTING DOOR AND FRAME TO REMAIN.

N O

T F

O R

C O

N S

T R

U C

T

IO

N R

E F

E R

E N

C E

O N

LY

EXISTING MEZZ.

FLOOR TO BE CUT

AND REMOVED

NEW WOOD FRAMED

LANDING

DRAWN BY:

P R

O J E

C T

T

IT

L E

CHECKED BY:

DATE:

PROJECT #:

N

O R

R

E E

T S

P A

N I S

H

F

O R

K

U

T A

H

W W

W K

M A

A R

C H

I T

E C

T S

C

O M

REVISIONS:

T H

IS

P

R

IN

T A

N D

A L L I N

F O

R M

A T

IO

N

H E

R E

O N

I S

T H

E P

R O

P E

R T

Y O

F K

M A

A R

C H

IT

E

C T

S A

N D

S H

A L L N

O T

B E

U S

E D

O N

A N

Y O

T H

E R

J O

B W

IT

H

O U

T W

R

IT

T E

N P

E R

M

IS

S

IO

N O

F T

H E

A R

C H

IT

E

C T

/8

/5

/2

:2

:5

A

M

S A

L L Y

M A

U R

O E

L E

M E

N T

A R

Y H

E L P

E R

U

T

C A

R B

O N

C O

U N

T Y

S C

H O

O L D

IS

T

R

IC

T

N

D A

V E

174824

BRS

JR

FEB 2026

A1.2A

1/8" = 1'-0"

MEZZANINE FLOOR PLAN

N O

R T

H

N O

T F

O R

C O

N S

T R

U C

T

IO

N R

E F

E R

E N

C E

O N

LY

R

O J E

C T

T

IT

L E

CHECKED BY:

DATE:

PROJECT #:

N

O R

R

E E

T S

P A

N I S

H

F

O R

K

U

T A

H

W W

W K

M A

A R

C H

I T

E C

T S

C

O M

REVISIONS:

T H

IS

P

R

IN

T A

N D

A L L I N

F O

R M

A T

IO

N

H E

R E

O N

I S

T H

E P

R O

P E

R T

Y O

F K

M A

A R

C H

IT

E

C T

S A

N D

S H

A L L N

O T

B E

U S

E D

O N

A N

Y O

T H

E R

J O

B W

IT

H

O U

T W

R

IT

T E

N P

E R

M

IS

S

IO

N O

F T

H E

A R

C H

IT

E

C T

/8

/5

/2

:2

:5

A

M

S A

L L Y

M A

U R

O E

L E

M E

N T

A R

Y H

E L P

E R

U

T

C A

R B

O N

C O

U N

T Y

S C

H O

O L D

IS

T

R

IC

T

N

D A

V E

174824

BRS

JR

FEB 2026

A1.2B 1/8" = 1'-0"

MEZZANINE FLOOR PLAN

N O

R T

H

N O

T F

O R

C O

N S

T R

U C

T

IO

N R

E F

E R

E N

C E

O N

LY

P R

O J E

C T

T

IT

L E

CHECKED BY:

DATE:

PROJECT #:

N

O R

R

E E

T S

P A

N I S

H

F

O R

K

U

T A

H

W W

W K

M A

A R

C H

I T

E C

T S

C

O M

REVISIONS:

T H

IS

P

R

IN

T A

N D

A L L I N

F O

R M

A T

IO

N

H E

R E

O N

I S

T H

E P

R O

P E

R T

Y O

F K

M A

A R

C H

IT

E

C T

S A

N D

S H

A L L N

O T

B E

U S

E D

O N

A N

Y O

T H

E R

J O

B W

IT

H

O U

T W

R

IT

T E

N P

E R

M

IS

S

IO

N O

F T

H E

A R

C H

IT

E

C T

/8

/5

/2

:2

:5

A

M

S A

L L Y

M A

U R

O E

L E

M E

N T

A R

Y H

E L P

E R

U

T

C A

R B

O N

C O

U N

T Y

S C

H O

O L D

IS

T

R

IC

T

N

D A

V E

174824

BRS

JR

FEB 2026

A1.2C

1/8" = 1'-0"

MEZZANINE FLOOR PLAN

N O

R T

H

N O

T F

O R

C O

N S

T R

U C

T

IO

N R

E F

E R

E N

C E

O N

LY

R

O J E

C T

T

IT

L E

CHECKED BY:

DATE:

PROJECT #:

N

O R

R

E E

T S

P A

N I S

H

F

O R

K

U

T A

H

W W

W K

M A

A R

C H

I T

E C

T S

C

O M

REVISIONS:

T H

IS

P

R

IN

T A

N D

A L L I N

F O

R M

A T

IO

N

H E

R E

O N

I S

T H

E P

R O

P E

R T

Y O

F K

M A

A R

C H

IT

E

C T

S A

N D

S H

A L L N

O T

B E

U S

E D

O N

A N

Y O

T H

E R

J O

B W

IT

H

O U

T W

R

IT

T E

N P

E R

M

IS

S

IO

N O

F T

H E

A R

C H

IT

E

C T

/8

/5

/2

:2

:5

A

M

S A

L L Y

M A

U R

O E

L E

M E

N T

A R

Y H

E L P

E R

U

T

C A

R B

O N

C O

U N

T Y

S C

H O

O L D

IS

T

R

IC

T

N

D A

V E

174824

BRS

JR

FEB 2026

A1.2D

1/8" = 1'-0"

MEZZANINE FLOOR PLAN

N O

R T

H

N O

T F

O R

C O

N S

T R

U C

T

IO

N R

E F

E R

E N

C E

O N

LY

VARIES

EXISTING WALL

EXISTING 8" ATLAS

BRICK

5/8" TYPE 'X' GYPSUM BOARD

3 5/8" METAL STUD FRAMING

@ 16" O.C.

2" THICK CONTINUOUS

SPRAY IN FOAM

INSULATION - SEE SPECS.

1' - 2"

5"

5/8" GYPSUM BOARD

(BOTH SIDES)

3 5/8" METAL STUD FRAMING

@ 16" O.C. INSTALL METAL

FRAMING BLOCKING

CHANNELS AS PER SPECS.

DASHED LINE INDICATES

CERAMIC TILE OR STAINLESS

STEEL PANEL (WHERE OCCURS)

DRAWN BY:

P R

O J E

C T

T

IT

L E

CHECKED BY:

DATE:

PROJECT #:

N

O R

R

E E

T S

P A

N I S

H

F

O R

K

U

T A

H

W W

W K

M A

A R

C H

I T

E C

T S

C

O M

REVISIONS:

T H

IS

P

R

IN

T A

N D

A L L I N

F O

R M

A T

IO

N

H E

R E

O N

I S

T H

E P

R O

P E

R T

Y O

F K

M A

A R

C H

IT

E

C T

S A

N D

S H

A L L N

O T

B E

U S

E D

O N

A N

Y O

T H

E R

J O

B W

IT

H

O U

T W

R

IT

T E

N P

E R

M

IS

S

IO

N O

F T

H E

A R

C H

IT

E

C T

/4

/5

/2

:2

:5

A

M

S A

L L Y

M A

U R

O E

L E

M E

N T

A R

Y H

E L P

E R

U

T

C A

R B

O N

C O

U N

T Y

S C

H O

O L D

IS

T

R

IC

T

N

D A

V E

174824

BRS

JR

FEB 2026

A1.4

3/4" = 1'-0"

1 WALLTYPE 1

3/4" = 1'-0"

2 WALLTYPE 2

3/4" = 1'-0"

3 WALLTYPE 3

N O

T F

O R

C O

N S

T R

U C

T

IO

N R

E F

E R

E N

C E

O N

LY

CEILING LEGEND

2'x4' ACCOUSTIC

CEILING TILE (TYPE I)

2'x2' ACCOUSTIC

CEILING TILE

CEILING HEIGHT

LIGHT FIXTURES

MECHANICAL

DIFFUSERS

9'-0"

EXPOSED FRAMING

(PAINTED)

PRE-FINISHED METAL

SOFFIT

TECTUM SOUND

PANELS

GENERAL NOTES

A - PRIOR TO INSTALLATION OF THE CEILING SYSTEM,

ALL MECHANICAL, ELECTRICAL, FIRE PROTECTION AND

CEILING SUB-CONTRACTORS SHALL COORDINATE THEIR

WORK WITH THE REFLECTED CEILING PLAN. IF ANY

CONFLICTS OCCUR, CONSULT THE ARCHITECT FOR

VERIFICATION.

B - ALL CEILING HEIGHTS ARE BASED OFF OF THE

FINISHED FLOOR ELEVATION IN THEIR RESPECTIVE

AREAS.

2'x4' VINYL ACCOUSTIC

CEILING TILE (WASHABLE)

C1

5/8" GYP. BOARD

(TEXTURED AND

PAINTED)

C2

C5

C4

C6

C7

C1

5/8" GYP. BOARD

(TEXTURED AND EPOXY

PAINTED)

C3

5/8" GYP. BOARD CEILING

CLOUD

C8

WALL LINE

1" METAL "L"

MOLD

METAL GRID CLIP

AT WALL CONNECTION

LAY-IN CEILING

PANEL METAL "T"

GRID

#9 WIRE AT 4' O.C. TO

STRUCTURE ABOVE

1 1/2" MAIN RUNNER CHANNELS

AT 48" O.C.

#9 WIRES AT 36" O.C. TO

STRUCTURE ABOVE

7/8" HAT CHANNELS AT

16" O.C..

METAL "L" WALL/CEILING

MOLD

WALL LINE

5/8" TEXTURED AND PAINTED

GYPSUM BOARD

DASHED LINE INDICATES 12x12

GLUE UPCEILING TILE

(WHERE OCCURS)

DRAWN BY:

P R

O J E

C T

T

IT

L E

CHECKED BY:

DATE:

PROJECT #:

N

O R

R

E E

T S

P A

N I S

H

F

O R

K

U

T A

H

W W

W K

M A

A R

C H

I T

E C

T S

C

O M

REVISIONS:

T H

IS

P

R

IN

T A

N D

A L L I N

F O

R M

A T

IO

N

H E

R E

O N

I S

T H

E P

R O

P E

R T

Y O

F K

M A

A R

C H

IT

E

C T

S A

N D

S H

A L L N

O T

B E

U S

E D

O N

A N

Y O

T H

E R

J O

B W

IT

H

O U

T W

R

IT

T E

N P

E R

M

IS

S

IO

N O

F T

H E

A R

C H

IT

E

C T

A s i n d ic a te d /5

/2

:2

:5

A

M

S A

L L Y

M A

U R

O E

L E

M E

N T

A R

Y H

E L P

E R

U

T

C A

R B

O N

C O

U N

T Y

S C

H O

O L D

IS

T

R

IC

T

N

D A

V E

174824

BRS

JR

FEB 2026

A2.1

1/16" = 1'-0"

OVERALL MAIN FLOOR REFLECTED

3/4" = 1'-0"

LAY-IN CEILING

N O

R T

H

3/4" = 1'-0"

SUSPENDED CEILING DETAIL

N O

T F

O R

C O

N S

T R

U C

T

IO

N R

E F

E R

E N

C E

O N

LY

GENERAL NOTES

A - PRIOR TO INSTALLATION OF THE CEILING SYSTEM,

ALL MECHANICAL, ELECTRICAL, FIRE PROTECTION AND

CEILING SUB-CONTRACTORS SHALL COORDINATE THEIR

WORK WITH THE REFLECTED CEILING PLAN. IF ANY

CONFLICTS OCCUR, CONSULT THE ARCHITECT FOR

VERIFICATION.

B - ALL CEILING HEIGHTS ARE BASED OFF OF THE

FINISHED FLOOR ELEVATION IN THEIR RESPECTIVE

AREAS.

CEILING LEGEND

2'x4' ACCOUSTIC

CEILING TILE (TYPE I)

CEILING HEIGHT

LIGHT FIXTURES

MECHANICAL

DIFFUSERS

9'-0"

C1

5/8" GYP. BOARD

(TEXTURED AND

PAINTED)

C2

C1

5/8" GYP. BOARD

(TEXTURED AND EPOXY

PAINTED)

C3

9' - 0"

C1

9' - 0"

C1

9' - 0"

C1

9' - 0"

C1

8' - 0"

C1

8' - 5"

C1

8' - 0"

C1

8' - 0"

C1

8' - 0"

C5

8' - 0"

C1

8' - 5"

C1

8' - 0"

C1

8' - 0"

C1

8' - 0"

C1

A2.1

A2.1

A2.1

A2.1

A2.1

A2.1

A2.1

A2.1

A2.1

A2.11

A2.1

A2.1

A2.1

A2.1

A2.1

A2.1

A2.1

8' - 0"

C1

8' - 0"

C1

8' - 0"

C1

A2.1

A2.1

A2.1

A2.1

A2.1

9' - 0"

C2

A2.1

A2.1

A2.1

A2.1

A2.1

A2.1

A2.1

A2.1

A2.1

A2.1

A2.1

A2.1

A2.1

KEY PLAN

AREA "A"

AREA "B"

AREA "C"

AREA "D"

DRAWN BY:

P R

O J E

C T

T

IT

L E

CHECKED BY:

DATE:

PROJECT #:

N

O R

R

E E

T S

P A

N I S

H

F

O R

K

U

T A

H

W W

W K

M A

A R

C H

I T

E C

T S

C

O M

REVISIONS:

T H

IS

P

R

IN

T A

N D

A L L I N

F O

R M

A T

IO

N

H E

R E

O N

I S

T H

E P

R O

P E

R T

Y O

F K

M A

A R

C H

IT

E

C T

S A

N D

S H

A L L N

O T

B E

U S

E D

O N

A N

Y O

T H

E R

J O

B W

IT

H

O U

T W

R

IT

T E

N P

E R

M

IS

S

IO

N O

F T

H E

A R

C H

IT

E

C T

A s i n d ic a te d /5

/2

:2

:5

A

M

S A

L L Y

M A

U R

O E

L E

M E

N T

A R

Y H

E L P

E R

U

T

C A

R B

O N

C O

U N

T Y

S C

H O

O L D

IS

T

R

IC

T

N

D A

V E

174824

BRS

JR

FEB 2026

A2.1A

SHEET NOTES

1/8" = 1'-0"

MAIN FLOOR REFLECTED AREA "A"

N O

R T

H

N O

T F

O R

C O

N S

T R

U C

T

IO

N R

E F

E R

E N

C E

O N

LY

A - PRIOR TO INSTALLATION OF THE CEILING SYSTEM,

ALL MECHANICAL, ELECTRICAL, FIRE PROTECTION AND

CEILING SUB-CONTRACTORS SHALL COORDINATE THEIR

WORK WITH THE REFLECTED CEILING PLAN. IF ANY

CONFLICTS OCCUR, CONSULT THE ARCHITECT FOR

VERIFICATION.

B - ALL CEILING HEIGHTS ARE BASED OFF OF THE

FINISHED FLOOR ELEVATION IN THEIR RESPECTIVE

AREAS.

CEILING LEGEND

2'x4' ACCOUSTIC

CEILING TILE (TYPE I)

CEILING HEIGHT

LIGHT FIXTURES

MECHANICAL

DIFFUSERS

9'-0"

C1

5/8" GYP. BOARD

(TEXTURED AND

PAINTED)

C2

C1

5/8" GYP. BOARD

(TEXTURED AND EPOXY

PAINTED)

C3

9' - 0"

C1

9' - 0"

C1

9' - 0"

C1

9' - 0"

C1

9' - 0"

C1

9' - 0"

C1

9' - 0"

C1

9' - 0"

C1

8' - 0"

C1

8' - 0"

C18' - 0"

C1

8' - 0"

C1

9' - 0"

C1

9' - 0"

C1

8' - 0"

C1

8' - 0"

C1

A2.1

A2.1

A2.1

A2.1

A2.1

A2.1

A2.1

A2.1

A2.1

A2.1

A2.1

A2.1

A2.1

A2.1

A2.1

A2.1

KEY PLAN

AREA "A"

AREA "B"

AREA "C"

AREA "D"

DRAWN BY:

P R

O J E

C T

T

IT

L E

CHECKED BY:

DATE:

PROJECT #:

N

O R

R

E E

T S

P A

N I S

H

F

O R

K

U

T A

H

W W

W K

M A

A R

C H

I T

E C

T S

C

O M

REVISIONS:

T H

IS

P

R

IN

T A

N D

A L L I N

F O

R M

A T

IO

N

H E

R E

O N

I S

T H

E P

R O

P E

R T

Y O

F K

M A

A R

C H

IT

E

C T

S A

N D

S H

A L L N

O T

B E

U S

E D

O N

A N

Y O

T H

E R

J O

B W

IT

H

O U

T W

R

IT

T E

N P

E R

M

IS

S

IO

N O

F T

H E

A R

C H

IT

E

C T

A s i n d ic a te d /5

/2

:2

:5

A

M

S A

L L Y

M A

U R

O E

L E

M E

N T

A R

Y H

E L P

E R

U

T

C A

R B

O N

C O

U N

T Y

S C

H O

O L D

IS

T

R

IC

T

N

D A

V E

174824

BRS

JR

FEB 2026

A2.1B

SHEET NOTES

1/8" = 1'-0"

MAIN FLOOR REFLECTED AREA "B"

N O

R T

H

N O

T F

O R

C O

N S

T R

U C

T

IO

N R

E F

E R

E N

C E

O N

LY

9' - 0"

C1

9' - 0"

C1

9' - 0"

C1

9' - 0"

C1

9' - 0"

C1

9' - 0"

C1 9' - 0"

C1

9' - 0"

C1

9' - 0"

C1

9' - 0"

C1

9' - 0"

C1

9' - 0"

C1

9' - 0"

C1

9' - 0"

C1

A2.1

A2.1

A2.1

A2.1

A2.1

A2.1

A2.1

A2.1

A2.1

A2.1

A2.1

A2.1

A2.1

GENERAL NOTES

A - PRIOR TO INSTALLATION OF THE CEILING SYSTEM,

ALL MECHANICAL, ELECTRICAL, FIRE PROTECTION AND

CEILING SUB-CONTRACTORS SHALL COORDINATE THEIR

WORK WITH THE REFLECTED CEILING PLAN. IF ANY

CONFLICTS OCCUR, CONSULT THE ARCHITECT FOR

VERIFICATION.

B - ALL CEILING HEIGHTS ARE BASED OFF OF THE

FINISHED FLOOR ELEVATION IN THEIR RESPECTIVE

AREAS.

CEILING LEGEND

2'x4' ACCOUSTIC

CEILING TILE (TYPE I)

CEILING HEIGHT

LIGHT FIXTURES

MECHANICAL

DIFFUSERS

9'-0"

C1

5/8" GYP. BOARD

(TEXTURED AND

PAINTED)

C2

C1

5/8" GYP. BOARD

(TEXTURED AND EPOXY

PAINTED)

C3

KEY PLAN

AREA "A"

AREA "B"

AREA "C"

AREA "D"

DRAWN BY:

P R

O J E

C T

T

IT

L E

CHECKED BY:

DATE:

PROJECT #:

N

O R

R

E E

T S

P A

N I S

H

F

O R

K

U

T A

H

W W

W K

M A

A R

C H

I T

E C

T S

C

O M

REVISIONS:

T H

IS

P

R

IN

T A

N D

A L L I N

F O

R M

A T

IO

N

H E

R E

O N

I S

T H

E P

R O

P E

R T

Y O

F K

M A

A R

C H

IT

E

C T

S A

N D

S H

A L L N

O T

B E

U S

E D

O N

A N

Y O

T H

E R

J O

B W

IT

H

O U

T W

R

IT

T E

N P

E R

M

IS

S

IO

N O

F T

H E

A R

C H

IT

E

C T

A s i n d ic a te d /5

/2

:2

:1

A

M

S A

L L Y

M A

U R

O E

L E

M E

N T

A R

Y H

E L P

E R

U

T

C A

R B

O N

C O

U N

T Y

S C

H O

O L D

IS

T

R

IC

T

N

D A

V E

174824

BRS

JR

FEB 2026

A2.1C

SHEET NOTES

1/8" = 1'-0"

MAIN FLOOR REFLECTED AREA "C"

N O

R T

H

N O

T F

O R

C O

N S

T R

U C

T

IO

N R

E F

E R

E N

C E

O N

LY

A - PRIOR TO INSTALLATION OF THE CEILING SYSTEM,

ALL MECHANICAL, ELECTRICAL, FIRE PROTECTION AND

CEILING SUB-CONTRACTORS SHALL COORDINATE THEIR

WORK WITH THE REFLECTED CEILING PLAN. IF ANY

CONFLICTS OCCUR, CONSULT THE ARCHITECT FOR

VERIFICATION.

B - ALL CEILING HEIGHTS ARE BASED OFF OF THE

FINISHED FLOOR ELEVATION IN THEIR RESPECTIVE

AREAS.

CEILING LEGEND

2'x4' ACCOUSTIC

CEILING TILE (TYPE I)

CEILING HEIGHT

LIGHT FIXTURES

MECHANICAL

DIFFUSERS

9'-0"

C1

5/8" GYP. BOARD

(TEXTURED AND

PAINTED)

C2

C1

5/8" GYP. BOARD

(TEXTURED AND EPOXY

PAINTED)

C3

KEY PLAN

AREA "A"

AREA "B"

AREA "C"

AREA "D"

DRAWN BY:

P R

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .