2-RFP 550669 - Attachment C Price Proposal - 3rd precinct Roof.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
CDD – 3rd Precinct Roof Replacement
Solicitation number
550669
Issued by
Wayne County, Detroit City, Michigan

About this file

This is a Price Proposal Attachment C for RFP 550669 submitted to the City of Detroit Office of Contracting and Procurement on behalf of the Construction and Demolition Department for a 3rd Precinct Roof Replacement project. The project involves installing a Duro-Last Roof System at the Detroit Police Department's 3rd Precinct facilities located at 2875 West Grand Blvd, Detroit, Michigan. The scope encompasses design services, permitting, and construction phases for roof replacement work. The proposal structure is divided into Phase 1 (Design Services) and Phase 2 (Construction Items), with provisions for design and permit drawings, awardee markup fees, general conditions, insurance and bonding, and alternate pricing for removing the existing roof membrane and adding 2-inch insulation.

The price proposal template requires bidders to provide fully burdened hourly labor rates for construction management personnel including Project Director, Project Manager, Project Superintendent, Project Engineer, Project Estimator, Accounting, Clerical, Journeyman for General Contractor, and other positions as applicable. Bidders must also submit a markup fee (applicable if construction costs are approximately $400,000), costs for general conditions including dumpsters, management fees, superintendency, cleanup, and equipment rental, as well as insurance and bond amounts. The template contains calculated fields in Column B that are protected from editing, indicating this is a standardized bidding document designed to ensure consistent cost proposal formatting across all submitting contractors.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

DPD 3rd Precinct Roof Replacement Price Proposal - Attachment C
DO NOT EDIT ANY OF THE B COLUMNS - THESE ARE CALCULATED FIELDS
Phase 1:
Design Services FeeAnticipated Duration/HoursComments
A. Design and Permit Drawings and/or documentation$ - 0- 0Include permit costs
Awardee Mark up Fee for Phase 1 if applicalbe and/or not included in A$ - 0
Phase 1 Sub Total:$ - 0
Phase 2: Construction
ItemsValue - CostsComments
1. Mark Up Fee$ - 0if construction cost is approx. $400,000.00
2. General Conditions - specify duration$ - 0This includes, dumpsters, management fees, superintendant, clean up costs and equipment rental fees, etc
3. Insurance and Bond$ - 0
3. Alternate pricing #1$ - 0remove existing roof membrane (existing balast rmoval is in scope of work) and add 2" insulation on existing insulation or decking
Construction Manager's Project Personnel*Hourly Rate**Provide Fully Burdened Labor Rates*
Project Director$ - 0
Project Manager$ - 0
Project Superintendent$ - 0
Project Engineer$ - 0
Project Estimator$ - 0
Accounting$ - 0
Clerical$ - 0
Journeyman for General Contractor$ - 0
Others:$ - 0
Others:$ - 0
Others:$ - 0
Others:$ - 0
Others:$ - 0

File details come from the government source that posted it. Updated .