This is a Questions and Answers (Q&A) document related to a park restroom improvements project issued by Sigurd Town, Utah, in partnership with Jones & DeMille Engineering. The project involves construction improvements to park restrooms with flexible start dates at the contractor's discretion. The substantial completion deadline is May 1, 2027, with final completion required no later than May 15, 2027. Questions regarding the project were due in writing by October 16, 2026, at 12:00 pm, and bids were to be submitted electronically by October 20, 2026, at 11:00 am local time. The bidding documents are available from Sigurd Town at 595 N State Street, Sigurd, UT 84657, with inquiries directed to mayor@sigurdtown.gov. No pre-bid conference was scheduled for this project.

The Q&A clarifies that electrical work will be handled as a budget item with lighting choices made collaboratively during construction rather than being specified in advance plans. Similarly, plumbing and mechanical work will follow contractor suggestions within a budget framework, with specifications ensuring adequate freeze protection for the location and summer ventilation. The document indicates that complete MEP (mechanical, electrical, and plumbing) drawings were not provided in the initial bidding package, requiring contractors to develop detailed plans based on performance requirements and budget parameters rather than fixed specifications.

View the file

Other files

File Type Posted
1-Advertisement for Bids.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q-RFC #1 - there are no calendar dates or start date for the project. What is the anticipated start date and anticipated time frame?

A. Start date is up to the contractor, but final completion must occur no later than May 15, 2027. Substantially complete by May 1, 2027.

Q-RFC #2 - What is the final construction date for the project? Document 00 11 13 states "Final completion of May 15, 2027" however under Contract for Construction of a Small Project Article 4.01 Contract Times. It states, "substantially completed on or before April 1, 2027, and completed for final payment on or before April 15, 2027". What dates are correct?

A. Start date is up to the contractor, but final completion must occur no later than May 15, 2027. Substantially complete by May 1, 2027.

Q-I don’t see the referenced lighting plan or the complete MEP drawings in the files I received. Could you please send me the electrical/lighting, plumbing, and mechanical plans/specifications needed to complete the bid?

A. Electrical will be a budget and the town and contractor will make lighting choices during construction.

Q. Ok that’s fine now what about the plumbing and mechanical

A. It will be the same contractor suggestion and budget it must be sufficient to ensure that the plumbing does not freeze for our location and has ventilation for summer.