2-Provo Temple Storm Drain Construction Drawings.pdf

PDF 2 MB Posted

Attached to
Provo City Storm Drain Materials
Solicitation number
PR2026001029
Issued by
Utah

About this file

This construction drawing document, prepared for Provo City, provides detailed plans and profiles for the Provo Temple Storm Drain project, encompassing two separate work areas along Temple Drive and 1060 East. The project involves the installation of reinforced concrete pipe (RCP) in multiple sizes, storm drain manholes (SDMH), and catch basins across two sheets with a scale of 1" = 60' and 1" = 20' respectively. Sheet 1 (Temple Drive) details approximately 771.8 feet of 24-inch concrete pipe installed at various slopes (6.67% to 7.00%), four 60-inch diameter storm drain manholes numbered 1 through 4, and four double catch basins with specific invert and rim elevations. Sheet 2 (1060 East) specifies approximately 275.5 feet of 15-inch concrete pipe at 0.33% slope, six 60-inch diameter storm drain manholes numbered 5 and 6 (with three existing sumps), and connections to existing infrastructure including an 8-inch sanitary sewer line, 6-inch waterline, and gas lateral that require field verification by the contractor.

The drawings indicate precise station locations, invert and rim elevations for all structures, and slope requirements for gravity-fed drainage systems. Installation specifications include double catch basin details per Provo City Detail P-315C, minimum slope requirements for 18-inch and 15-inch RCP installations, and notation that contractors must field-verify the locations and elevations of existing underground utilities. The two-sheet drawing set provides comprehensive design information for materials procurement and construction staging, with all elevation data referenced to a consistent datum and organized by station markers along the project corridors. No pricing, contract terms, award dates, or response deadlines are specified in this technical drawing document.

View the file

Other files

File Type Posted
1-Franklin Storm Drain Construction Drawings.pdf PDF
3-Contract Documents.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M H

SS 8in

W 6in

MHSS 8in SS 8in SS 8in SS 8in SS 8in SS 8in SS 8in SS 8in SS 8in

W 6in W 6in W 6in

W 6in W 6in W 6in W 6in W 6in W 6in W 6in W 6in

G 3in

G

STORM DRAIN

STORM DRAIN

STORM DRAIN

STORM DRAIN

7+72

0+

1+

2+

3+

4+

5+

6+

7+

2300 NORTH

IR

O

Q U

O

IS

D R

IV

E

E

AS

T

360.00' OF 24" CONCRETE PIPE @ 7.00% 360.00' OF 24" CONCRETE PIPE @ 7.00%

51.8' OF 24" CONCRETE PIPE @ 6.67%

60" Ø SDMH NO. 2

STA:0+51.81 OFF:0.00

MH

SS 8in SS 8in

W

2i n

G G

W 12in W 12in

INSTALL DOUBLE CATCH BASIN

RIM: 4886.49

18" INV OUT: 4882.49

SUMP: 4879.49

SEE PROVO CITY DETAIL P-315C

INSTALL DOUBLE CATCH BASIN

RIM: 4886.18

18" INV OUT: 4882.62

SUMP:4879.62

SEE PROVO CITY DETAIL P-315C

INSTALL DOUBLE CATCH BASIN

RIM: 4938.71

18" INV OUT: 4930.97

SUMP: 4927.97

SEE PROVO CITY DETAIL P-315C

INSTALL DOUBLE CATCH BASIN

RIM: 4938.75

18" INV OUT: 4931.17

SUMP: 4928.17

SEE PROVO CITY DETAIL P-315C

INSTALL 40' OF 18" RCP @ MIN. 1.00%

INSTALL 26' OF 18" RCP @ MIN. 1.00%

INSTALL 35' OF 18" RCP @ MIN. 1.00%

INSTALL 15' OF 18" RCP @ MIN. 1.00%

STORM DRAIN

60" Ø SDMH NO. 1

STA:2+75.48 OFF:0.00

60" Ø SDMH NO. 3

STA:4+11.81 OFF:0.00L

60" Ø SDMH NO. 4

STA:7+71.81 OFF:0.00

360.00' OF 24" CONCRETE PIPE @ 7.00%

360.00' OF 24" CONCRETE PIPE @ 7.00%

" Ø

S D

M H

N O

. 2

ST

AT

IO

N : 0

+5 1.

O

FF

SE

T:

.0

T R

IM

: 4

6.

" I N

V

IN

:4

2.

(E

" I

N V

O U

T:

.2

(W

" Ø

S D

M H

N O

. 3

ST

AT

IO

N : 4

+1 1.

O

FF

SE

T:

.0

LT

R

IM

: 4

2.

" I N

V

IN

:4

7.

(E

" I

N V

O U

T:

.4

(W

" Ø

S D

M H

N O

. 4

ST

AT

IO

N : 7

+7 1.

O

FF

SE

T:

.0

T R

IM

: 4

9.

" I N

V O

U T:

.7

(W

" Ø

S D

M H

N O

. 1

ST

AT

IO

N : 2

+7 5.

O

FF

SE

T:

.0

T R

IM

: 4

5.

" I N

V

IN

:4

8.

(N

" I

N V

IN

:4

8.

(E

51.8' OF 24" CONCRETE PIPE @ 6.67%

SCALE: 1" = 60' (11"x 17" SHEET SIZE)

TE

M

PL

E

DR

IV

E

PL

AN

P

RO

FI

LE

PR

O

VO

T

EM

PL

E

ST

O

RM

D

RA

IN

RE

VI

SI

O N

S

UT1

SHEET 1 OF 2

N O

DA

TE

DE

SC

RI

PT

IO

N

300 6030

0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00

MH

SS 8in SS 8in SS 8in SS 8in SS 8in SS 8in SS 8in SS 8in SS 8in SS 8in

SD

5i n

W 6in W 6in W 6in W 6in W 6in W 6in W 6in W 6in W 6in W 6in

1060 EAST

TE

M

PL

E

D R

IV

E

SS

in

SS

in

SS

in

SS

in

W in W in

W in W in

W in

G in G in

G 3in G 3in G 3in G 3in G 3in G 3in G 3in G 3in G 3in G 3in

G G

G

G G

CORE AND CONNECT NEW PIPE

TO EXISTING STRUCTURE

CORE AND CONNECT NEW PIPE

TO EXISTING STRUCTURE

EXISTING 60" Ø SUMP NO. 3

STA:1+39.19 OFF:0.00

ST

O

R M

D R

AI

N

99.0' OF 15" CONCRETE PIPE @ 0.33% ST

O

R M

D R

AI

N

STORM DRAIN

0+

1+

2+

2+

ST

O

R M

D R

AI

N

INSTALL 8' OF 15" RCP @ MIN. 0.5%

CORE AND CONNECT NEW PIPE

TO EXISTING STRUCTURE

EXISTING 60" Ø SUMP NO. 1

RIM: 4882.45

SUMP: 4876.55

12" FL IN: 4879.81 (W)

12" FL OUT: 4879.81 (E)

INSTALL 8' OF 15" RCP @ MIN. 0.5%

EXISTING 60" Ø SUMP NO. 2

RIM: 4882.28

SUMP: 4876.08

12" FL IN: 4879.98 (W)

12" FL OUT: 4879.98 (E)

STORM DRAIN

40.2' OF 15" CONCRETE PIPE @ 0.33% 136.3' OF 15" CONCRETE PIPE @ 0.33%

CORE AND CONNECT NEW PIPE

TO EXISTING STRUCTURE

60" Ø SDMH NO. 1

STA:2+75.48 OFF:0.00

STORM DRAIN

EXISTING 8" SANITARY SEWER LINE

STA:2+37.23

ELEV:4873.80

CONTRACTOR TO FIELD VERIFY LOCATION AND ELEVATION

LOOP EXISTING 6" WATERLINE

STA:2+44.66

ELEV:4877.52

FIELD VERIFY LOCATION AND ELEVATION

EXISTING GAS LATERAL

STA:1+29.01

ELEV:4881.42

FIELD VERIFY LOCATION AND ELEVATION

99.0' OF 15" CONCRETE PIPE @ 0.33% 40.2' OF 15" CONCRETE PIPE @ 0.33% 136.3' OF 15" CONCRETE PIPE @ 0.33%

" Ø

S D

M H

N O

. 5

ST

AT

IO

N : 0

+0 0.

O

FF

SE

T:

.0

T R

IM

: 4

3.

" F L

IN

: 4

9.

(W

" I N

V O

U T:

.6

(S

" Ø

S D

M H

N O

. 6

ST

AT

IO

N : 0

+9 9.

O

FF

SE

T:

.0

T R

IM

: 4

2.

" I N

V

FL

IN

: 4

9.

(W

" I N

V

IN

:4

9.

(N

" I

N V

O U

T:

.3

(S

EX

IS

TI

N

G

0" Ø

S U

M P

N O

. 3

ST

AT

IO

N : 1

+3 9.

O

FF

SE

T:

.0

T R

IM

: 4

2.

SU

M P:

6.

" I

N V

IN

:4

9.

(N

" I N

V O

U T:

.2

(S

" Ø

S D

M H

N O

. 1

ST

AT

IO

N : 2

+7 5.

O

FF

SE

T:

.0

T R

IM

: 4

5.

" I N

V

IN

:4

8.

(N

" I

N V

IN

:4

8.

(E

SCALE: 1" = 20' (11"x 17" SHEET SIZE)

E

AS

T

PL

AN

P

RO

FI

LE

PR

O

VO

T

EM

PL

E

ST

O

RM

D

RA

IN

RE

VI

SI

O N

S

UT2

SHEET 2 OF 2

N O

DA

TE

DE

SC

RI

PT

IO

N

100 2010

0+00 1+00 2+00

File details come from the government source that posted it. Updated .