2-Project Drawings.pdf
PDF 13 MB Posted
- Solicitation number
- Not on record
- Issued by
- Centre County, Terre Hill Borough, Pennsylvania
About this file
Project Drawing Documents Summary
This is a comprehensive set of project drawings for the Oak Hall OH-20 Well Facility and Booster Pump Station, a capital construction project for the College Township Water Authority located in Centre County, Pennsylvania. The project encompasses the construction of a 1,000 gallon-per-minute (gpm) well facility with an associated 30-foot by 40-foot building, a separate booster pump station, clearwell, internal and yard piping systems, chemical feed systems, electrical infrastructure, instrumentation, HVAC, plumbing, related appurtenances, site paving, and restoration work at Oak Hall Regional Park in College Township. The drawings include architectural plans, structural foundations, civil site plans, mechanical and plumbing systems, electrical one-line diagrams, process and instrumentation diagrams (P&IDs), and erosion and sediment control (E&S) details across multiple disciplines. A mandatory pre-bid conference is scheduled for Wednesday, December 3, 2025 at 10:00 a.m. at College Township Offices, with bids due electronically via the PennBid Program by Tuesday, December 23, 2025 at 2:00 p.m. local time. Bidders must attend the pre-bid conference to be eligible for bid consideration, and all project documents are available at no cost through the PennBid system.
The project documents include detailed specifications and drawings prepared by Entech Engineering (Project No. 4139.056) and Aurora Architecture, issued for bidding on November 18, 2025. The well facility design includes a wet well with a minimum water level of 1,134.00 feet elevation and an operations floor at 1,137.50 feet elevation, featuring two 50-horsepower variable frequency drive (VFD) high-service pumps and one 60-horsepower VFD well pump capable of delivering 1,000 gpm at 150 feet total dynamic head. The booster pump stations utilize smaller pumps at different capacities. Site work requires coordination with existing utilities through Pennsylvania One Call (1-800-242-1776), field verification of underground utilities and site conditions prior to bidding, and implementation of erosion and sedimentation control measures during construction. The contractor is responsible for providing record drawings with surveyed locations upon project completion, maintaining mechanical joint restraint systems on all connections, and compliance with all local, state, and federal codes including the 2018 International Building Code and Pennsylvania prevailing wage requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-Project Manual.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL PROJECT NOTES
COLLEGE TOWNSHIP WATER AUTHORITY
OAK HALL OH-20 WELL FACILITY &
BOOSTER PUMP STATION
D R
AW
IN
G
IN
D
EX
, G
EN
ER
AL
P R
O
JE
C T
N O
TE
S, D R
AW
IN
G C
O N
VE
N
TI
O
N S
AN
D
M
AP
S G
EN
ER
AL
DRAWING CONVENTIONS
00 1000' 2000'
SCALE:1 1" = 2000'
LOCATION / TOPOGRAPHICAL MAP
SECTION INDICATOR
DETAIL INDICATOR
ELEVATION INDICATOR1
X-201
A X-301
A X-301
X-501
SCALE:1 1" = 1'-0"
DRAWING TITLE
DRAWING NUMBER
SECTION LETTER
DRAWING NUMBER
ELEVATION LETTER
IDENTIFICATION NUMBER/LETTER
DRAWING TITLE
A
SHEET KEYNOTE SYMBOL
DEMOLITION KEYNOTE
SYMBOL
PHOTOGRAPH INDICATOR
PHOTOGRAPH
IDENTIFICATION
DRAWING NUMBER
DETAIL NUMBER
A
TEXT
INDICATES EXIST
CONDITIONS/FEATURES
INDICATES NEW
WORK/FEATURES
DENOTES REFERENCE TO ENLARGED
PLANS WITH DRAWING NUMBER
INDICATED
X
XXX
REFERENCE: USGS 7.5 MINUTE SERIES (TOPOGRAPHIC MAP) STATE COLLEGE, PENNSYLVANIA
DRAWING INDEX
DWG. NO. DRAWING DESCRIPTION/TITLE BIDDING
GENERAL
G-001 DRAWING INDEX, GENERAL PROJECT NOTES, DRAWING CONVENTIONS AND MAPS X
G-002 DRAWING LEGENDS, SYMBOLS AND ABBREVIATIONS X
G-101 EXISTING AND PROPOSED CONDITIONS - AERIAL SITE PLAN X
G-601 COLLEGE TOWNSHIP WATER DISTRIBUTION SYSTEM SCHEMATIC X
G-602 OAK HALL OH-20 WELL FACILITY PROCESS AND INSTRUMENTATION DIAGRAM X
G-603 OAK HALL PARK BOOSTER PUMP STATION PROCESS AND INSTRUMENTATION DIAGRAM X
G-604 BRUSH VALLEY BOOSTER PUMP STATION PROCESS AND INSTRUMENTATION DIAGRAM X
EROSION AND SEDIMENTATION
ES-101 CONTROL PLANS X
ES-501 CONTROL NOTES X
ES-502 CONTROL DETAILS X
DEMOLITION
GED-401 OH-19 WELL BUILDING DEMOLITION PLAN, KEYED NOTES AND PHOTOGRAPHS X
CIVIL
C-101 OAK HALL AND BRUSH VALLEY FACILITY SITE PLANS X
C-102 PARK PAVEMENT RESTORATION PLAN X
C-401 ENLARGED YARD PIPING PLAN AND PHOTOGRAPHS X
C-402 ENLARGED BRUSH VALLEY BOOSTER STATION SITE AND METER VAULT PLANS X
C-501 CONSTRUCTION DETAILS X
C-502 CONSTRUCTION DETAILS AND SCHEDULES X
C-701 RESTORATION DETAILS X
STRUCTURAL
S-101 OAK HALL OH-20 WELL FACILITY WET WELL FOUNDATION PLAN X
S-102 OAK HALL OH-20 WELL FACILITY OPERATIONS FLOOR FOUNDATION PLAN X
S-103 BRUSH VALLEY BPS ELEC EQUIP PAVILLION FOUNDATION PLAN SECTION & DETS
S-301 OAK HALL OH-20 WELL FACILITY FOUNDATION SECTIONS X
S-501 OAK HALL OH-20 WELL FACILITY FOUNDATION SECTIONS AND DETAILS X
ARCHITECTURAL
A-101 CHANNEL LEVEL PLAN AND GENERAL NOTES X
A-102 PUMP ROOM FLOOR PLAN X
A-103 ROOF FRAMING PLAN X
A-104 ROOF PLAN X
A-201 ELEVATIONS X
A-301 BUILDING SECTIONS X
A-302 BUILDING SECTIONS X
A-303 BUILDING SECTIONS X
A-304 SECTION DETAILS X
A-501 DETAILS X
A-601 DOOR AND FINISH SCHEDULES AND DETAILS X
PROCESS
D-101 OAK HALL OH-20 WELL FACILITY WET WELL LEVEL PLAN AND NOTES X
D-102 OAK HALL OH-20 WELL FACILITY OPERATIONS LEVEL PLAN AND NOTES X
D-103 OAK HALL PARK BOOSTER PUMP STATION FLOOR PLAN, SECTION AND NOTES X
D-301 OAK HALL OH-20 WELL FACILITY SECTIONS X
D-501 PROCESS AND INSTRUMENTATION DETAILS X
MECHANICAL
M-101 OAK HALL OH-20 WELL FACILITY OPERATIONS LEVEL PLANS X
PLUMBING
P-101 OAK HALL OH-20 WELL FACILITY OPERATIONS LEVEL PLANS X
ELECTRICAL
E-101 OAK HALL OH-20 WELL FACILITY OPERATIONS LEVEL PLANS X
E-102 OAK HALL PARK BOOSTER PUMP STATION FLOOR PLAN, SECTION AND NOTES X
E-501 CONSTRUCTION DETAILS, GENERAL NOTES AND SCHEDULES X
E-502 CONSTRUCTION DETAILS X
E-601 WELL HOUSES AND BOOSTER STATION ONE LINE DIAGRAMS X
E-701 OAK HALL AND BRUSH VALLEY FACILITY SITE PLANS X
SCADA / TELEMETRY
T-101 SCADA INFRASTRUCTURE LOCATION MAP X
1. FIELD SURVEY BY BRINKASH & ASSOCIATES, INC.; DATED JULY 2021.
2. PROPERTY LINES SHOWN ARE APPROXIMATE AND HAVE NOT BEEN
SURVEYED OR FIELD VERIFIED.
3. THE LOCATION AND DIMENSIONS OF ALL SITE FEATURES SHOWN ARE
APPROXIMATE AND MUST BE VERIFIED IN THE FIELD BY THE
CONTRACTOR PRIOR TO BIDDING.
4. ALL UNDERGROUND UTILITIES SHALL BE LOCATED BY THE CONTRACTOR
PRIOR TO ANY EARTH MOVING ACTIVITIES, PURSUANT TO ACT 287.
UNDERGROUND UTILITY LOCATIONS MUST BE VERIFIED BY CALLING
1-800-242-1776.
5. ALL UNDERGROUND UTILITY LOCATIONS AND ELEVATIONS ON THE
CONSTRUCTION PLANS APPROXIMATE LOCATIONS DELINEATED FROM
LIMITED FIELD MARKINGS AND AVAILABLE RECORDS. THEREFORE, ANY
UTILITIES NOT SHOWN OR NOT LOCATED AS SHOWN, SHALL NOT BE THE
CAUSE OF THE CONTRACTOR TO DENY RESPONSIBILITY FOR
PROTECTION AND/OR REPAIR DURING CONSTRUCTION. CONTRACTOR
SHALL FIELD VERIFY ALL EXISTING FACILITIES AND PROVIDE ALL
PROTECTIVE MEASUREMENTS, RESTRAINTS AND APPURTENANCES AS
NECESSARY.
6. THESE DESIGN DRAWINGS MUST BE WORKED IN CONJUNCTION WITH THE
PROJECT MANUAL/SPECIFICATIONS.
7. RED LINED RECORD DRAWINGS SHALL BE SUBMITTED WITH EACH
APPLICATION FOR PAYMENT, ON AT A MINIMUM OF 11”X17” SIZED
DRAWING SHEETS, CLEARLY DELINEATING LIMITS OF COMPLETED WORK
FOR THAT PAY PERIOD, INCLUDING BUT NOT LIMITED TO HORIZONTAL
LOCATION OF WATER MAINS, VALVES BOXES, CURB STOPS, FIRE
HYDRANTS, BLOWOFFS, CORPORATIONS, FITTINGS, OTHER
APPURTENANCES, AND RESTORATION AREAS. UPON PROJECT
CLOSEOUT, THE CONTRACTOR SHALL FURNISH RECORD DRAWINGS
COMPLETED BY A PROFESSIONAL LAND SURVEYOR WITH SURVEYED
LOCATIONS OF ALL WATER MAIN AND WATER SERVICE FEATURES
INSTALLED BY THE CONTRACTOR.
8. CONTRACTOR SHALL PROVIDE ALL FITTINGS NECESSARY TO MAINTAIN
HORIZONTAL AND VERTICAL ALIGNMENT OF PIPELINES.
9. CONTRACTOR SHALL PROVIDE A MECHANICAL JOINT RESTRAINT SYSTEM
AT EACH CONNECTION TO A BEND, FITTING, VALVE, CAP, AND
CONNECTION TO EXISTING MAIN. PROVIDE RESTRAINED PUSH-ON JOINT
GASKETS AT EACH JOINT UP AND DOWN STREAM TO SECURE A
MECHANICAL JOINT ELBOW, BEND, FITTING, CAP OR VALVE.
10. CONTRACTOR SHALL USE, MAINTAIN AND PROVIDE ADEQUATE, PROPER
SHORING DEVICES ON SITE AT ALL TIMES. CONTRACTOR SHALL
CONFORM TO ALL LOCAL, STATE AND FEDERAL REGULATIONS.
4139.056
A
B
2 3
C
D
1 2 3
4 5 6
PROJECT NO.
APPROVED BY:
SCALE:
CHECKED BY:
PREPARED BY:
A
B
D
AT
E R
EV
4 5
IS
SU
ED
F
O R
/R
EV
IS
ED
C
AP
PD
D
DRAWING NO.
Entech Engineering - Printed: Nov. 18, 2025 H:\0004139.056\04-CAD\SheetFiles\G-001.dwgLa st
E di te d by : s ba pt is ta
/1
8/
BI
D
D
IN
G M
JD
G-001
MJD
DJH
PDM
AS NOTED
C O
LL
EG
E
TO
W N
SH
IP
W
AT
ER
A
U
TH
O R
IT
Y
C O
LL
EG
E
TO
W N
SH
IP
, C
EN
TR
E
C O
U N
TY
, P
EN
N
SY
LV
AN
IA
O
AK
H
AL
L O
H -2
W
EL
L
FA
C
IL
IT
Y
BO
O
ST
ER
S
TA
TI
O
N
OFFICE ADDRESS:
1481 EAST COLLEGE AVE.
STATE COLLEGE, PA. 16801
ISSUED FOR
BIDDING
NOVEMBER 18, 2025
OAK HALL OH-20
WELL FACILITY
LAT: 40° 47' 24.7"N
LONG: -77° 47' 46.3"W
BRUSH VALLEY BOOSTER
PUMP STATION
LAT: 40° 48' 43.5"N
LONG: -77° 48' 42.4"W
1-800-242-1776
(TOLL FREE)
"Pa. Law requires advance notification"
PA ONE CALL FOR DESIGN
COORDINATE PA PROJECT #: 12691678
SERIAL NUMBER ISSUED:
20253033246 - FINAL (BRUSH VALLEY ROAD)
DESIGN PA ONE CALL
UTILITY RESPONSE ADDRESS CONTACT INFORMATION CONTACT PERSON
BELLEFONTE BOROUGH 236 WEST LAMB STREET
BELLEFONTE, PA. 16823
EMAIL: mauman@bellefontepa.gov
PHONE: 814-355-1501 EXT. 221 MATT AUMAN
COLLEGE TOWNSHIP 1481 E. COLLEGE AVE.
STATE COLLEGE, PA. 16801
EMAIL: sadams@collegetownship.org
PHONE: 814-231-3021 SHANE ADAMS
CABLE PROTECTION SERVICES INC PO BOX 4816
MIDLOTHIAN, VA. 23112
EMAIL: debbie_king@cableps.com
PHONE: 804-562-3409 DEBBIE KING
VERIZON PENNSYLVANIA, LLC. 1050 VIRGINIA DRIVE
FORT WASHINGTON, PA. 19034
EMAIL: diane.c.redilla@verizon.com
PHONE: 215-591-6210 DIANE REDILLA
PENN STATE UNIVERSITY
UCES BUILDING
833 HASTINGS ROAD
UNIVERSITY PARK, PA. 16802
EMAIL: jam86@psu.edu
PHONE: 814-553-0662 JEFF MCDONALD
UNIVERSITY AREA JOINT AUTHORITY 1576 SPRING VALLEY RD.
STATE COLLEGE, PA. 16801
EMAIL: dbrown@uaja.org
PHONE: 814-238-5361 EXT. 7715 DAREN BROWN
PENNSYLVANIA ELECTRIC CO 341 WHITE POND DRIVE
AKRON, OH. 44320
EMAIL: madams@firstenergycorp.com
PHONE: 330-252-4013 MELLYSSA ADAMS
STATE COLLEGE BOROUGH WATER
AUTHORITY
1201 WEST BRANCH ROAD
STATE COLLEGE, PA. 16801
EMAIL: ashettler@scbwa.org
PHONE: 814-238-6766 EXT. 125 AUSTIN SHETTLER
1-800-242-1776
PE
NN
SY
LV
AN
IA ONE CALL SYSTEM
, INC
STOP-CALL BEFORE YOU D
IG
356.00
360 PROPOSED GRADE (MAJOR)
PROPOSED STORM DRAIN
PROPOSED WATER LATERAL
PROPOSED PAVED SURFACE
ROCK CONSTRUCTION ENTRANCE
PROPOSED CHAIN LINK FENCE
PROPOSED INLET
PROPOSED STORM DRAIN MANHOLE
PROPOSED YARD HYDRANT
PROPOSED GATE VALVE
PROPOSED PLUG VALVE
PROPOSED MECHANICAL JOINT FITTING
LIMIT OF DISTURBANCE
Bh SwD
B-5
EXISTING FACILITY TO BE REMOVED
EXISTING FACILITY TO BE MODIFIED
NEW BUILDING FACILITIES
SUPER SILT FILTER FABRIC FENCE
PROPOSED MACADAM ACCESS
ROAD/ STONE DRIVEWAY
EROSION CONTROL BLANKET STEEP SLOPES
PROPOSED WATER MAINW W
PROPOSED HYDRANT
RIP RAP OUTLET PROTECTION
SILT SACK INLET PROTECTION
PROPOSED CURB STOP
PROPOSED WATER METER & METER BOXWMB
CS
PROPOSED SANITARY LATERAL
PROPOSED SANITARY MAINSAN SAN
FILTER FABRIC FENCE - 30"
FILTER FABRIC FENCE - 18"
E E PROPOSED ELECTRIC
PROPOSED SANITARY MANHOLE
COMPOST SILT SOCK
356 PROPOSED GRADE (MINOR)
EROSION CONTROL SWALE MATTING
NPDES
PRE DEVELOPMENT DRAINAGE AREA
POST DEVELOPMENT DRAINAGE AREA
TIME OF CONCENTRATION> > >
TEXT PROPOSED TEXT
G
EN
ER
AL
D R
AW
IN
G L
EG
EN
D S, S
YM
BO
LS
A N
D A
BB
R
EV
IA
TI
O
N S
IN
ST
R U
M
EN
T
SY
M
BO
LS
MOUNTED BEHIND PANEL DOOR
ALARM LIGHT
NOT ACCESSIBLE TO OPERATOR
ACCESSIBLE TO OPERATOR
AUXILLIARY LOCATION
NOT ACCESSIBLE TO OPERATOR
ACCESSIBLE TO OPERATOR
COMPLEX OR UNDEFINED INTERLOCKI
D
IS
TR
IB
U
TE
D C
O N
TR
O
L
SH
AR
ED
IN
ST
R
U M
EN
TS
SY
M
BO
LS
PR
O
G R
AM
M
AB
LE
C O
N
TR
O
LL
ER
LO
C K
IN
TE
R
SY
M
BO
LS
SY
M
BO
LS
O R
MOUNTED LOCALLY
INSTRUMENTATION SYMBOL LEGEND
MOUNTED ON FACE OF PANEL
INDICATE
SCAN
LOW/LIGHT
CONTROL STATION
ORIFICE
SWITCH
RECORD/PRINT
TRANSMIT
INTEGRATE/TOTALIZE
VALVE
RELAY
MULTIFUNCTION
DRIVE/ACTUATE
MIDDLE
COMPUTING OR SIGNAL CONVERTING
SPEED/FREQUENCY
TEMPERATURE/TORQUE
POSITION
VISCOSITY/VIBRATION
MULTIVARIABLE
EVENT, STATE PRESENCE
W
X
Z
Y
WEIGHT
STATUS
R
S
T
V
U
REMOTE
QUANTITY
TURBIDITY
PRESSURE / VACUUM
MOISTURE/MALFUNCTIONM
O
P
N
Q
I
K
L
J
CURRENT
POWER
TIME
LEVEL
INSTRUMENTATION DEVICE SCHEDULE
ALARM
CONTROL
PRIMARY ELEMENT
HIGH
GLASS/GAUGE
MEASURED
VOLTAGE
DENSITY DIFFERENTIAL
CHLORINE
ANALYSIS
VARIABLE
FLOW RATE
D
E
G
H
F
HAND
A
B
C
BURNER
DELAY
FIRST LETTER
DISPLAY OR
OUTPUT FUNCTION
SUCCEEDING LETTERS
CIVIL LEGEND ABBREVIATIONS LEGEND
REFRIGERATOR
RESILIENT BASE
REINFORCE(D), REINFORCING
RISER, RADIUS
PAPER TOWEL DISPENSER
POINT, PRESSURE TREATED
PAPER TOWEL RECEPTACLE
POUNDS PER SQUARE INCH
POUNDS PER SQUARE FOOT
PLUMBING CONTRACTOR
SOLID SURFACE MATERIAL
SPECIAL WALL COVERING
RAIN WATER CONDUCTOR
ROUGH OPENING, ROOF OPENING
SOLID POLYMER FABRICATIONS
SQUARE FOOT
SPECIFICATION
TOILET PARTITION
VENT THROUGH ROOF
VINYL COMPOSITION TILE
VINYL COVE BASE
VENEER PLASTER, VAPOR PROOF
UNLESS NOTED OTHERWISE
TOILET PAPER DISPENSER
TOP OF SLAB
TOP OF STEEL
TOP OF WALL
TOP OF MASONRY
FINISHED
ABOVE
PLUMBING
MOUNTING
ESTIMATE
EQUIPMENT
EXHAUST
EXISTING
EQUAL
EACH WAY
FIRE ALARM
FLOOR DRAIN
EXTERIOR
EXPANSION
ELECTRIC WATER COOLER
FIRE EXTINGUISHER CABINET
FIRE EXTINGUISHER
FINISHED BY OTHERS
FINISH FLOOR ELEVATION
FIRE HOSE CABINET
CONTRACTOR INSTALLED
NON-FUSED DISCONNECT SWITCH
OPPOSITE
NUMBER / NORMALLY OPEN
NOMINAL
NOT IN CONTRACT
NOT TO SCALE
NOT APPLICABLE
OPENING
OVERHEAD
OVERALL / OUTSIDE AIR
OUTSIDE DIAMETER
OWNER FURNISHED
ON CENTER
WITHOUT
WOOD
WITH
UNDERCUT
VERTICAL
TYPICAL
AMERICAN STANDARD TESTING MATERIAL
CEILING
CLOSET
COLUMN
CONCRETE
CONSTRUCTION
CORRIDOR
COURSE(S)
CURB STOP, CORPORATION STOP
CARPET
CONTRACTOR
CONTINUOUS
CLEAN ROOM WALL PANEL
CONCRETE MASONRY UNIT
DOWN SPOUT
DRAWING
DOOR, DRAIN
DIAMETER
DIMENSION
EMERGENCY
ELECTRIC(AL)
ELEVATION
EACH
DRINKING FOUNTAIN
EXPANSION JOINT
EXPANSION JOINT
ELECTRICAL CONTRACTOR
DETAIL
ADJUSTABLE
ALTERNATE
ACOUSTIC
ABANDON
ASPHALT
APPROXIMATE
ALUMINUM
ACOUSTIC TILE CEILING
ABOVE FINISHED FLOOR
ARCHITECTURAL WOOD INSTITUTE
BOTTOM FOUNDATION ELEVATION
ARCHITECTURAL
BEAM
BRICK
BASEMENT
BOTTOM
BUILDING
BLOCKING
BITUMINOUS
BUILT UP ROOF
CENTERLINE
CATCH BASIN
CONTROL JOINT
CABINET
CENTER TO CENTER
AIR CONDITIONING
MECHANICAL/ELECTRICAL/PLUMBING
LOW POINT, LIGHTING PANEL
MEDIUM DENSITY OVERLAY
JANITOR, JANITOR'S CLOSET
LOUVER
MAXIMUM
METAL
MECHANICAL
MINIMUM
MECHANICAL JOINT
MOUNT(ED)
MISCELLANEOUS
MANUFACTURER
MANUFACTURING
INTERIOR
INSIDE DIAMETER
INFORMATION
ISOLATION JOINT
JOINT
LENGTH, LONG
LAMINATE(D)
LINEAR FOOT
HVAC CONTRACTOR
INSULATE, INSULATION
SUSPENDED
SYSTEM
TREAD, TOP
THICK(NESS)
TERRAZZO
TELEPHONE
TEMPERED
STEEL
STANDARD
STRUCTURAL
SHEET VINYL
STORAGE
SECTION
SIMILAR
SQUARE
SHOWER
ROOM
RUBBER TILE
SANITARY
SCHEDULE
GROUND
HEADER
HANDICAP(PED)
HOLLOW METAL
HARDWARE
HIGH
HEIGHT
HIGH POINT / HORSEPOWER
HANDRAIL
HORIZONTAL
GYPSUM WALLBOARD
HEATING, VENTILATING &
FLOOR
FIXTURE
FACE OF FINISH
FOUNDATION
FOOTING
GAUGE
FIREPROOF(ING)
GALVANIZED
GRAB BAR
FACE OF STUDS
GENERAL CONTRACTOR
FACE OF CONCRETE
FACE OF MASONRY
RETURN
REFERENCE
REQUIRED
REVISION
RESILIENT
RADIUS
QUANTITY
QUARRY TILE
RETURN AIR
ROOF DRAIN
PAIR
PARTITION
PAINTED
PLATE
PLASTER
PLACES
CLEAN-OUT
PREMOLDED JOINT FILLER
LEVEL / LAMINATED VENEER LUMBER
DEPARTMENT
BALANCING VALVE
CUBIC FEET PER MINUTE
AIR CONDITIONING CONDENSATE
CHLORINATED PVC PIPE
DOMESTIC COLD WATER
DOWN
ENTERING AIR TEMPERATURE
ENTERING DRY BULB
EXTERNAL STATIC PRESSURE
ENTERING WET BULB
ENTERING WATER TEMPERATURE
INVERT
JUNCTION BOX
KILOWATT
LEAVING AIR TEMPERATURE
MECHANICAL CONTRACTOR
NORMALLY CLOSED
PANEL
PRESSURE REGULATING VALVE
POLYVINYL CHLORIDE
REVOLUTIONS PER MINUTE
SUPPLY AIR
UNIT HEATER
VARIABLE SPEED DRIVE
VARIABLE FREQUENCY DRIVE
AIR HANDLING UNIT
ACCESS PANEL
FLEXIBLE CONNECTOR
FIN
PLBG
ABV
MTG
TOM
EST
FHC
FEE
FEC
FBO
EXP
FE
FD
FA
EXT
EQUIP
EXIST
EWC
EXH
EQ
EW
OPP
OFCI
OPNG
OC
OD
OA
OH
NFDS
NA
NO
NOM
NTS
NIC
W/O
WD
W/
TOW, TW
TYP
TOS
TPTN
VERT
VTR
UNO
VCT
VCB
UC
VP
TSL
TP
CLG
DET
EA
EMER
ELEC
EJ
EC
EL/ELEV
EXP JT
DIA,Ø
DWG
DR
DS
DIM
DF
CONT
CORR
CRWP
CPT
CRS
CS
CONTR
CONC
COL
CLO
CMU
CONST
CAB
BUR
CJ
LC
CC
CB
BRK
BSMT
BLDG
BLKG
BOT, BTM
BM
BIT
ALUM
ARCH
ASPH
ASTM
BFE
AWI
APPROX
ACT
ADJ
AFF
ALT
ATC
ABDN
LVR
MFG
MISC
MT(D)
MJ
MIN
MANUF.
MAX
MECH
MDO
MEP
MET
JAN
L
LAM
LF
LP
JT
INSUL
IJ
INFO
HC
INT
ID
SSM
STOR
SWC
STR
STD
TMPD
THK
TER
SYS
SUSP
T
TEL
STL
SV
SAN
SCH
RWC
SPEC
SHR
SPF
SECT
SIM
SQ
SF
RO
RT
RM
HORIZ
HVAC
HR
HT
H
HP
GWB
HDWR
GND
H/C
HM
HDR
FOS
GALV
FTG
FP
GC
GB
GA
FIXT
FOF
FOM
FOC
FDN
FLR
QTY
RAD
REFR.
REQD
REINF
REF
REV
RET
RES
RB
RD
QT
RA
R
PNT(D)
PLCS
PTR
PTN
PTD
PSF
PR
PT
PSI
P
PL
PC
CO
PMJF
LVL
DEPT
AHU
AP
FLEX
BV
CFM
COND
CPVC
CW
DN
EAT
DB
ESP
EWT
EWB
INV
JB
KW
LAT
MC
NC
PNL
PRV
PVC
RPM
SA
UH
VSD
VFD
MACADAMMAC
WASTE WATERWW
GALLONGAL
PLYWOODPLY
LEVEL SENSORLS
LEVEL ELEMENTLE
LEVEL TRANSDUCER / TRANSMITERLT
MASONRY OPENINGMO
DUCTILE IRON PIPEDI, DIP
CAST IRON PIPECI, CIP
UNNAMED TRIBUTARYUNT
MOTOR CONTROL PANELMCP
MICRO SCREEN CONTROL PANELMSCP
HAND SWITCHHS
FLOW INDICATING TRANSMITTERFIT
ANALYSIS INDICATING TRANSMITTERAIT
PLUG VALVEPV
STOP GATESG
OL
G
HP
J
NEW EXPOSED WIRING IN RACEWAY
NEW WIRING CONCEALED IN CEILING, WALL OR
UNDERGROUND
BRANCH CIRCUIT HOMERUN TO PANEL, NUMBER OF
ARROWS = NUMBER OF RACEWAYS. ALPHA-NUMERIC
DESIGNATION = PANEL - CIRCUIT #
CONDUIT TURNING DOWN
CONDUIT TURNING UP
POLE-MOUNTED LUMINAIRE, TYPE AS INDICATED ON
LUMINAIRE SCHEDULE ON SHEET E-501. EXISTING
SWITCHED BRANCH CIRCUITS SHALL BE MODIFIED TO
POWER NEW EQUIPMENT. LETTER = FIXTURE TYPE
(PER SCHEDULE)
LUMINAIRE, TYPE AS INDICATED ON LUMINAIRE
SCHEDULE ON SHEET E-501. LETTER = FIXTURE TYPE
(PER SCHEDULE), NUMBER = CIRCUIT # IN LOCAL
120/208V PANEL, LOWER CASE LETTER MATCHES
CONTROLLING SWITCH(ES).
DUPLEX RECEPT. MOUNTED AT 18" A.F.F. UNLESS
OTHERWISE NOTED, NUMBER = CIRCUIT # IN LOCAL
120/208V PANEL
DUPLEX RECEPT. MOUNTED AT ABOVE COUNTER
(COORDINATE WITH FURNITURE PROVIDER), NUMBER =
CIRCUIT # IN LOCAL 120/208V PANEL
RECEPTACLE W/ INTEGRAL GROUND FAULT CIRCUIT
INTERRUPTER MOUNTED AT 18" A.F.F., NUMBER =
CIRCUIT # IN LOCAL 120/208V PANEL
RECEPTACLE W/ INTEGRAL GROUND FAULT CIRCUIT
INTERRUPTER, AND WEATHERPROOF-WHILE-IN-USE
COVERPLATE MOUNTED AT 18" A.F.F., NUMBER =
CIRCUIT # IN LOCAL 120/208V PANEL
LIGHTING SWITCH - NUMBER (WHERE USED) INDICATES
SWITCH TYPE (3 = 3-WAY, ETC...), LOWER CASE LETTER
MATCHES CONTROLLED LUMINAIRES.
JUNCTION BOX
MOTOR, HORSEPOWER AS INDICATED ON PLANS
EQUIPMENT DESIGNATION REFER TO GENERAL,
MECHANICAL & PLUMBING DRAWINGS FOR
SCHEDULES
FUSE
CIRCUIT BREAKER
FUSED DISCONNECT SWITCH
NON-FUSED DISCONNECT SWITCH
PULL OUT DISCONNECT
TRANSFORMER
GENERATOR
GROUND
NORMALLY OPEN CONTACT
NORMALLY CLOSED CONTACT
OVERLOAD RELAY
CONDUCTORS NOT CONNECTED
CONDUCTORS CONNECTED
DISTRIBUTION PANELBOARD, SWITCHBOARD OR
MOTOR CONTROL CENTER, SHOWN TO SCALE ON
PLANS
DISCONNECT SWITCH, TYPE AND SIZE AS INDICATED
ON DRAWINGS
HEAT TRACE POWER CONNECTION KIT
CONTROL STATION (TYPE AS SHOWN)
PHOTO CELL
GFI,14
ELECTRICAL SYMBOL LEGEND
LP1-14
WP,GFI,14
S3,b
A,13,b
C
AC,14
EXISTING EXPOSED WIRING IN RACEWAY
EXPLOSION PROOFXP
C CAMERA
M MOTION DETECTOR
DC DOOR CONTACT
IC CARD READER
P
PC
M vv
S
WATER P&ID LEGEND
8"
GATE VALVE
CHECK VALVE
BUTTERFLY VALVE
BALL VALVE
PLUG VALVE
EXISTING PIPING
NEW PIPING
E
VALVE W/ ACTUATOR
E - ELECTRIC
P - PNEUMATIC
KNIFE GATE VALVE
SOLENOID VALVE
Mg(OH)2
PIPING DOWN
PIPING UP
PIPE REDUCER
CHEMICAL PIPING
ELECTRICAL SIGNALS
(ANALOG & DIGITAL)
SCADA SYSTEM COMM. LINK
(RADIO, DATA HIGHWAY)
FIBER OPTIC CABLE
F.O.
AIR PIPING
INSTRUMENTATION
AIR TUBING
AIR RELEASE VALVE
BACK PRESSURE
SUSTAINING VALVE
RELIEF VALVE
PIPING NOT CONNECTED
INSTRUMENTATION /
SENSOR
ULTRASONIC SENSOR
RADAR SENSOR
LEVEL (FLOAT) SWITCH
OIL FILLED GAUGE
PIPE TO FLOOR DRAIN
SPRAY NOZZLES
WATER SURFACE
MOTOR
PITOT TUBE
GAUGE WITH DIAPHRAM
FLEX COUPLER
M
FE-XX
0-XXX GPM
INLINE "FLOW ELEMENT" METER
SLIDE GATE
CENTRIFUGAL PUMP
MOTOR OPERATED DAMPER
CEILING MOUNTED DIFFUSER
FIRE DAMPER
DUCT SECTION, SUPPLY AIR
DUCT FLEXIBLE CONNECTION
DIRECTION OF FLOW
DUCT SIZE, FIRST FIGURE IS SHOWN
DUCT SECTION, RETURN AIR
TURNING VANES
BALANCING DAMPER
M
24"x12"
ITEM TO DEMOLISH
CONNECTION TO EXISTING
EQUIPMENT DESIGNATION
MECHANICAL SYMBOL LEGEND
4139.056
A
B
2 3
C
D
1 2 3
4 5 6
PROJECT NO.
APPROVED BY:
SCALE:
CHECKED BY:
PREPARED BY:
A
B
D
AT
E R
EV
4 5
IS
SU
ED
F
O R
/R
EV
IS
ED
C
AP
PD
D
DRAWING NO.
Entech Engineering - Printed: Nov. 18, 2025 H:\0004139.056\04-CAD\SheetFiles\G-002.dwgLa st
E di te d by : sb ap tis ta
/1
8/
BI
D
D
IN
G M
JD
G-002
MJD
DJH
PDM
AS NOTED
C O
LL
EG
E
TO
W N
SH
IP
W
AT
ER
A
U
TH
O R
IT
Y
C O
LL
EG
E
TO
W N
SH
IP
, C
EN
TR
E
C O
U N
TY
, P
EN
N
SY
LV
AN
IA
O
AK
H
AL
L O
H -2
W
EL
L
FA
C
IL
IT
Y
BO
O
ST
ER
S
TA
TI
O
N
PULSATION DAMPER
EX
IS
TI
N
G A
N D
P R
O
PO
SE
D
C O
N D
IT
IO
N S
- A
ER
IA
L
SI
TE
P
LA
N G
EN
ER
AL
4139.056
A
B
2 3
C
D
1 2 3
4 5 6
PROJECT NO.
APPROVED BY:
SCALE:
CHECKED BY:
PREPARED BY:
A
B
D
AT
E R
EV
4 5
IS
SU
ED
F
O R
/R
EV
IS
ED
C
AP
PD
D
DRAWING NO.
Entech Engineering - Printed: Nov. 18, 2025 H:\0004139.056\04-CAD\SheetFiles\G-101.dwgLa st
E di te d by : s ba pt is ta
/1
8/
BI
D
D
IN
G M
JD
G-101
MJD
DJH
PDM
AS NOTED
C O
LL
EG
E
TO
W N
SH
IP
W
AT
ER
A
U
TH
O R
IT
Y
C O
LL
EG
E
TO
W N
SH
IP
, C
EN
TR
E
C O
U N
TY
, P
EN
N
SY
LV
AN
IA
O
AK
H
AL
L O
H -2
W
EL
L
FA
C
IL
IT
Y
BO
O
ST
ER
S
TA
TI
O
N
GENERAL SHEET NOTES
1. REFER TO DRAWING G-001 FOR DRAWING INDEX, GENERAL PROJECT
NOTES, DRAWING CONVENTIONS AND MAPS.
2. REFER TO DRAWING G-002 FOR DRAWING LEGENDS, SYMBOLS AND
ABBREVIATIONS.
SCALE:1 1" = 200'
EXISTING AND PROPOSED CONDITIONS - AERIAL SITE PLAN
00 200' 400'
C-101
OAK HALL
FACILITY SITE PLAN
C-101
BRUSH VALLEY BOOSTER
STATION SITE PLAN
SP
R
IN
G
C R
EE
K
SPR
IN
G C
R
EEK
C O
LL
EG
E
TO
W N
SH
IP
W
AT
ER
D
IS
TR
IB
U
TI
O
N S
YS
TE
M S
C H
EM
AT
IC
G
EN
ER
AL
4139.056
A
B
2 3
C
D
1 2 3
4 5 6
PROJECT NO.
APPROVED BY:
SCALE:
CHECKED BY:
PREPARED BY:
A
B
D
AT
E R
EV
4 5
IS
SU
ED
F
O R
/R
EV
IS
ED
C
AP
PD
D
DRAWING NO.
Entech Engineering - Printed: Nov. 18, 2025 H:\0004139.056\04-CAD\SheetFiles\G-601.dwgLa st
E di te d by : s ba pt is ta
/1
8/
BI
D
D
IN
G M
JD
G-601
MJD
DJH
PDM
AS NOTED
C O
LL
EG
E
TO
W N
SH
IP
W
AT
ER
A
U
TH
O R
IT
Y
C O
LL
EG
E
TO
W N
SH
IP
, C
EN
TR
E
C O
U N
TY
, P
EN
N
SY
LV
AN
IA
O
AK
H
AL
L O
H -2
W
EL
L
FA
C
IL
IT
Y
BO
O
ST
ER
S
TA
TI
O
N
GENERAL SHEET NOTES
1. REFER TO DRAWING G-001 FOR DRAWING INDEX, GENERAL PROJECT
NOTES, DRAWING CONVENTIONS AND MAPS.
2. REFER TO DRAWING G-002 FOR DRAWING LEGENDS, SYMBOLS AND
ABBREVIATIONS.
OAK HALL OH-20 WELL FACILITY
HSP-1 1000 GPM@125'TDH, 50 HP, VFD
HSP-2 1000 GPM@125'TDH, 50 HP, VFD
EL. 1137.5'
PLC
12" 12"
EL. 1163.0'
EL. 973.0'
OH-20 WELL PUMP
WP-1 1000 GPM@
150'TDH, 60 HP
8"
SCALE:1 NONE
COLLEGE TOWNSHIP WATER DISTRIBUTION SYSTEM SCHEMATIC
BRUSH VALLEY BPS
BP-3 & BP-4
25 GPM @140'TDH,
1.5 HP
BP-1 50 GPM@138'TDH, 3 HP
BP-2 50 GPM@138'TDH, 3 HP
ABANDONED
RTU
AK
H
AL
L O
H -2
W
EL
L
FA
C
IL
IT
Y
PR
O C
ES
S
AN
D
IN
ST
R U
M
EN
TA
TI
O N
D
IA
G R
AM
G
EN
ER
AL
4139.056
A
B
2 3
C
D
1 2 3
4 5 6
PROJECT NO.
APPROVED BY:
SCALE:
CHECKED BY:
PREPARED BY:
A
B
D
AT
E R
EV
4 5
IS
SU
ED
F
O R
/R
EV
IS
ED
C
AP
PD
D
DRAWING NO.
Entech Engineering - Printed: Nov. 18, 2025 H:\0004139.056\04-CAD\SheetFiles\G-602.dwgLa st
E di te d by : s ba pt is ta
/1
8/
BI
D
D
IN
G M
JD
G-602
MJD
DJH
PDM
AS NOTED
C O
LL
EG
E
TO
W N
SH
IP
W
AT
ER
A
U
TH
O R
IT
Y
C O
LL
EG
E
TO
W N
SH
IP
, C
EN
TR
E
C O
U N
TY
, P
EN
N
SY
LV
AN
IA
O
AK
H
AL
L O
H -2
W
EL
L
FA
C
IL
IT
Y
BO
O
ST
ER
S
TA
TI
O
N
GENERAL SHEET NOTES
1. REFER TO DRAWING G-001 FOR DRAWING INDEX, GENERAL PROJECT
NOTES, DRAWING CONVENTIONS AND MAPS.
2. REFER TO DRAWING G-002 FOR DRAWING LEGENDS, SYMBOLS AND
ABBREVIATIONS.
OAK HALL BOOSTER
PUMP STATION
SCALE:1 NONE
OAK HALL OH-20 WELL FACILITY PROCESS AND INSTRUMENTATION DIAGRAM
STATIC
123' BG
STRAINER
7 STAGES
OH-20 - WP-1
PITLESS ADAPTER
WELL PUMP
1000 GPM @
150'TDH, 60 HP
PUMPING LEVEL
133' BG
PUMP SETTING
190' BG
12" WELL ENDS EL.
TO BE VERIFIED
12"
12"Ø CASING
8"
CHEMICAL ROOM
F/F. EL. 1137.50'
RAW WATER
SAMPLE TAP1/2"
M
FE-401
0-1500 GPM
FIT
PLC
0-1500
GPM
12"
WET WELL
HSP1
VFD
HSP2
VFD
HSP-1
1000 GPM @
125' TDH - 50 HP
460-3-60
HSP-2
1000 GPM @
125' TDH - 50 HP
460-3-60
12"
ARV-04
12" M
FE-402
0-1500 GPM
FIT
0-1500
GPM PT
0-100
PSI
PLC
4"
12"x4"
0-100
PSI
1/ 2"
1/ 2"
ARV-03
2"
ARV-02
12"
12"
12" OVERFLOW
4"
TO
O H
-1
W
EL
L H
O U
SE
C
O N
N
EC
TI
O
N D
W G
. G -6
AIT
50 GALLON MIN.
CONTAINMENT PALLET
CORROSION
CONTROL
30 GALLON
OSHA
SAFETY
SIGNINHIBITOR
2"
1"
1- 1/
4"
1" M
FE
-4
0-
G
PM
1" M
FE
-4
0-
G
PM
0-200
PSI
1/ 2"S
SV-401
N.C.
1"
WT
PS
N .C
N
.C
0-300
PSI
1-1/4" 1"1-1/4"
1"
EDUCTOR
PLC
2"
2"
2"
2"
PLC
OXY
CALIBRATION
COLUMN
100 mL
MP-1
12 GPD
115-1-60
PUMP ROOM
F/F. EL. 1137.50'
ZS
PLC
5 1/2"
1"
TO SAMPLE SINK
AND HOSE BIBBS
3/ 4"
AIT
PLC
CL2
0-100
PSI
1/ 2"
PRV SET
@ 10 PSI
LIT
0-13
FTLIT
0-200
FT
PLC
LE-402
0-13 FT
LE-401
0-200 FT
HS
WP1
HOA
WT
PLC
PLC
HOA
0-100%
HS
HSP2
HOA
0-100%
HS
HSP1
PLC
PLC
PLC
WT
GRADE EL. 1163.50'
0' AGS
240 GALLON MIN.
CONTAINMENT PALLET
CORROSION
CONTROL
STORAGE
(TYP. 6 BARRELS)
VENT TO
ATMOSPHERE
ACV-1
PLC
PLC
PLC
2"
ARV-01
2"
YS
YS
YS
4" B
LO
W
-O
FF
PLC
YS
YH
12"x6"
12"x4"
TO DAYLIGHT
TO SYSTEM
AIT
PLC
1/ 2"
SRV-401
0-30 ppm
AE-401
PLC
TT
PLC
TT
PLC
WP1
VFD
0-100%
PRESSURE
RELIEF VALVE
PLC
F/F. EL. 1129.00'
MIN. WL. EL. 1134.00'
OVERFLOW EL. 1135.50'
AK
H
AL
L
PA
RK
B
O O
ST
ER
P
UM
P
ST
AT
IO
N
PR
O
CE
SS
A
ND
IN
ST
RU
M
EN
TA
TI
O N
DI
AG
RA
M
G
EN
ER
AL
4139.056
A
B
2 3
C
D
1 2 3
4 5 6
PROJECT NO.
APPROVED BY:
SCALE:
CHECKED BY:
PREPARED BY:
A
B
D
AT
E R
EV
4 5
IS
SU
ED
F
O R
/R
EV
IS
ED
C
AP
PD
D
DRAWING NO.
Entech Engineering - Printed: Nov. 18, 2025 H:\0004139.056\04-CAD\SheetFiles\G-603.dwgLa st
E di te d by : s ba pt is ta
/1
8/
BI
D
D
IN
G M
JD
G-603
MJD
DJH
PDM
AS NOTED
C O
LL
EG
E
TO
W N
SH
IP
W
AT
ER
A
U
TH
O R
IT
Y
C O
LL
EG
E
TO
W N
SH
IP
, C
EN
TR
E
C O
U N
TY
, P
EN
N
SY
LV
AN
IA
O
AK
H
AL
L O
H -2
W
EL
L
FA
C
IL
IT
Y
BO
O
ST
ER
S
TA
TI
O
N
GENERAL SHEET NOTES
1. REFER TO DRAWING G-001 FOR DRAWING INDEX, GENERAL PROJECT
NOTES, DRAWING CONVENTIONS AND MAPS.
2. REFER TO DRAWING G-002 FOR DRAWING LEGENDS, SYMBOLS AND
ABBREVIATIONS.
SCALE:1 NONE
OAK HALL PARK BOOSTER PUMP STATION PROCESS AND INSTRUMENTATION DIAGRAM
BP-1
50 GPM @
138' TDH - 3 HP
240-1-60
1-1/2"
BP-2
50 GPM @
138' TDH - 3 HP
240-1-60
2- 1/
2" S
U C
TI
O
N H
EA
D
ER
2- 1/
2" D
IS
C
H
AR
G E
H
EA
D
ER
0-160
PSI1/2"
FR
O
M O
H -2
W
EL
L
H O
U
SE
D W
G . G
-6
4"
P
SI
1-1/2"
BPCP
HOA HS
BP1
HOA HS
BP2
LS
BPCP
BPCPBPCP
PLC
JB
BPCP
PLC
PLC
5 PLC
PLC
0-160
PSI
F.
O
0-160
PSI1/2"
BR
US
H
VA
LL
EY
B O
O
ST
ER
P
UM
P
ST
AT
IO
N
PR
O
CE
SS
A
ND
IN
ST
RU
M
EN
TA
TI
O
N
DI
AG
RA
M G
EN
ER
AL
4139.056
A
B
2 3
C
D
1 2 3
4 5 6
PROJECT NO.
APPROVED BY:
SCALE:
CHECKED BY:
PREPARED BY:
A
B
D
AT
E R
EV
4 5
IS
SU
ED
F
O R
/R
EV
IS
ED
C
AP
PD
D
DRAWING NO.
Entech Engineering - Printed: Nov. 18, 2025 H:\0004139.056\04-CAD\SheetFiles\G-604.dwgLa st
E di te d by : s ba pt is ta
/1
8/
BI
D
D
IN
G M
JD
G-604
MJD
DJH
PDM
AS NOTED
C O
LL
EG
E
TO
W N
SH
IP
W
AT
ER
A
U
TH
O R
IT
Y
C O
LL
EG
E
TO
W N
SH
IP
, C
EN
TR
E
C O
U N
TY
, P
EN
N
SY
LV
AN
IA
O
AK
H
AL
L O
H -2
W
EL
L
FA
C
IL
IT
Y
BO
O
ST
ER
S
TA
TI
O
N
GENERAL SHEET NOTES
1. REFER TO DRAWING G-001 FOR DRAWING INDEX, GENERAL PROJECT
NOTES, DRAWING CONVENTIONS AND MAPS.
2. REFER TO DRAWING G-002 FOR DRAWING LEGENDS, SYMBOLS AND
ABBREVIATIONS.
BP-3
PITLESS BOOSTER UNIT
W/ SUBMERSIBLE PUMP
25 GPM @ 140' TDH
1.5 HP, 240-3-60
4" 2"
4"
38 PSI SUCTION
PRESSURE
8"
CS
CS
3/4"
1"
0-100
PSI
1/ 2"
METER VAULT
1/ 2"
3/ 4"
PT
2" 4"
4"
N .C
4" M
FE-411
0-100 GPM
0-100
GPM
4" 2"
PR
V
SE
T
PS
I
98 PSI DISCHARGE
PRESSURE
4"
4" BY-PASS
0-100
PSI
0-160
PSI
1/ 2"
1/ 2"
3/ 4"
PT
0-160
PSI
PP
HS
BP1
HOA
PCP-01
VFD
VFD
HS
BP2
FIT
BP-4
PITLESS BOOSTER UNIT
W/ SUBMERSIBLE PUMP
25 GPM @ 140' TDH
1.5 HP, 240-3-60
SCALE:1 NONE
PROCESS AND INSTRUMENTATION DIAGRAM
BRUSH VALLEY BOOSTER PUMP STATION
4" 2" 2" 4"
FH
8"
RTU-4
OIT
RTU
UTILITY
METER
MDS W/ MANUAL
PULL SWITCH
HYDRO
TANK
45 GAL.
LS
0-100%
HOA
0-100%
EL. 1112.00'
GEN. SET TERM
ENCLOSURE
MDS W/
MANUAL
XFER
VAULT
HATCH
6"
HYDRO
TANK
45 GAL.
1"
W
W W
R W W
RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW
RW
RW
OH-20
WELL
HOUSE
F/F EL.
1137.50'
.5
.5
FH
W
OhC
OhC
HaB HaB
HaB
HaB
OhB
OhB
TS
W W
W
FH
W W
C S
C S
MuB
MuC
OhC
OhC
OhC
No
LIMIT OF DISTURBANCE
SOILS
12" COMPOST FILTER SOCK
ROCK CONSTRUCTION ENTRANCE
C O
N
TR
O L
PL
AN
S
ER
O
SI
O N
A N
D S
ED
IM
EN
TA
TI
O
N
SCALE:1 1" = 30'
FACILITY SITE E&S PLAN
00 30' 60'
4139.056
A
B
2 3
C
D
1 2 3
4 5 6
PROJECT NO.
APPROVED BY:
SCALE:
CHECKED BY:
PREPARED BY:
A
B
D
AT
E R
EV
4 5
IS
SU
ED
F
O R
/R
EV
IS
ED
C
AP
PD
D
DRAWING NO.
Entech Engineering - Printed: Nov. 18, 2025 H:\0004139.056\04-CAD\SheetFiles\ES-101.dwgLa st
E di te d by : s ba pt is ta
/1
8/
BI
D
D
IN
G M
JD
ES-101
MJD
DJH
PDM
AS NOTED
C O
LL
EG
E
TO
W N
SH
IP
W
AT
ER
A
U
TH
O R
IT
Y
C O
LL
EG
E
TO
W N
SH
IP
, C
EN
TR
E
C O
U N
TY
, P
EN
N
SY
LV
AN
IA
O
AK
H
AL
L O
H -2
W
EL
L
FA
C
IL
IT
Y
BO
O
ST
ER
S
TA
TI
O
N
GENERAL SHEET NOTES
1. REFER TO DRAWING G-001 FOR DRAWING INDEX, GENERAL PROJECT
NOTES, DRAWING CONVENTIONS AND MAPS.
2. REFER TO DRAWING G-002 FOR DRAWING LEGENDS, SYMBOLS AND
ABBREVIATIONS.
12" DIP 12" DIP
" D
IP
T
R
AN
SM
IS
SI
O
N
OH-20 WELL
E&S LEGEND
SOIL TYPES
HaB HAGERSTOWN SILT LOAM, 3 TO 8 PERCENT SLOPES
MuB MURRILL CHANNERY SILT LOAM, 3 TO 8 PERCENT SLOPES
MuC MURRILL CHANNERY SILT LOAM, 8 TO 15 PERCENT SLOPES
No NOLIN SILT LOAM, LOCAL ALLUVIUM, 0 TO 5 PERCENT SLOPES
OhB OPEQUON - HAGERSTOWN COMPLEX, 3 TO 8 PERCENT SLOPES
OhC OPEQUON - HAGERSTOWN COMPLEX, 8 TO 15 PERCENT SLOPES
LIMIT OF
DISTURBANCE
(0.72 ACRES)
(0.81 ACRES TOTAL)
REMOVE / REPLACE
BOLLARDS
CONCRETE SIDEWALK
AND CURB RESTORATION
DEPRESSED
CURB
EXTEND
GRAVEL DRIVEWAY
SILT SOCK (TYP.)
ES-502
SILT SOCK (TYP.)
ES-502
50' RCE
WITH WASH RACK
ES-502
METER VAULT
METER AND
ELECTRICAL
EQUIPMENT
CANOPY
CONNECTION TO
EXISTING WATER LINE
SEE SEPARATE
E&S PLANS
FOR TRANSMISSION
MAIN PROJECT
SEE SEPARATE
E&S PLANS
FOR TRANSMISSION
MAIN PROJECT
0.
0'
TY
P.
SCALE:2 1" = 20'
BRUSH VALLEY RD BOOSTER STATION SITE E&S PLAN
00 10' 20'
ES-502
CHANNEL A
1. AVOID THE INTRODUCTION OF INVASIVE SPECIES IN ORDER TO
PROTECT THE INTEGRITY OF NEARBY PLANT SPECIES OF SPECIAL
CONCERN. VOLUNTARY CLEANING OF EQUIPMENT/VEHICLES USING
CLEAN FILL AND MULCH, AND AVOIDING PLANTING INVASIVE SPECIES
WILL HELP TO CONSERVE SENSITIVE PLANT HABITATS.
PA DCNR
CONSERVATION MEASURES
TOPSOIL
STOCKPILE
50' ROCK CONSTRUCTION
ENTRANCE W/ WASH RACK
ES-502
CONCRETE
WASHOUT
ES-502
LIMIT OF
DISTURBANCE
(0.09 ACRES)
(0.81 ACRES TOTAL)
OUTLET NO. 001
RIPRAP APRON
ES-502
N
TR
O L
N O
TE
S
ER
O
SI
O
N A
N D
S
ED
IM
EN
TA
TI
O N
4139.056
A
B
2 3
C
D
1 2 3
4 5 6
PROJECT NO.
APPROVED BY:
SCALE:
CHECKED BY:
PREPARED BY:
A
B
D
AT
E R
EV
4 5
IS
SU
ED
F
O R
/R
EV
IS
ED
C
AP
PD
D
DRAWING NO.
Entech Engineering - Printed: Nov. 18, 2025 H:\0004139.056\04-CAD\SheetFiles\ES-501.dwgLa st
E di te d by : s ba pt is ta
/1
8/
BI
D
D
IN
G M
JD
ES-501
MJD
DJH
PDM
AS NOTED
C O
LL
EG
E
TO
W N
SH
IP
W
AT
ER
A
U
TH
O R
IT
Y
C O
LL
EG
E
TO
W N
SH
IP
, C
EN
TR
E
C O
U N
TY
, P
EN
N
SY
LV
AN
IA
O
AK
H
AL
L O
H -2
W
EL
L
FA
C
IL
IT
Y
BO
O
ST
ER
S
TA
TI
O
N
STANDARD NOTES
1. ALL EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND FILLS SHALL BE DONE IN ACCORDANCE WITH THE APPROVED E&S PLAN. A COPY OF THE APPROVED DRAWINGS (STAMPED, SIGNED AND DATED BY THE REVIEWING AGENCY) MUST BE AVAILABLE AT THE PROJECT SITE AT ALL TIMES. THE REVIEWING AGENCY SHALL BE NOTIFIED OF ANY CHANGES TO THE APPROVED PLAN PRIOR TO IMPLEMENTATION OF THOSE CHANGES. THE REVIEWING AGENCY MAY REQUIRE A WRITTEN SUBMITTAL OF THOSE CHANGES FOR REVIEW AND APPROVAL AT ITS DISCRETION.
2. AT LEAST 7 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING CLEARING AND GRUBBING, THE OWNER AND/OR OPERATOR SHALL INVITE ALL CONTRACTORS, THE LANDOWNER, APPROPRIATE MUNICIPAL OFFICIALS, THE E&S PLAN PREPARER, THE PCSM PLAN PREPARER, THE LICENSED PROFESSIONAL RESPONSIBLE FOR OVERSIGHT OF CRITICAL STAGES OF IMPLEMENTATION OF THE PCSM PLAN, AND A REPRESENTATIVE FROM THE LOCAL CONSERVATION DISTRICT
TO AN ON-SITE PRECONSTRUCTION MEETING.
3. AT LEAST 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING INTO AN AREA PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM INC. SHALL BE NOTIFIED AT 1-800-242-1776 FOR THE LOCATION OF EXISTING UNDERGROUND UTILITIES.
4. ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE PROVIDED ON THE PLAN DRAWINGS. DEVIATION FROM THAT SEQUENCE MUST BE APPROVED IN WRITING FROM THE LOCAL CONSERVATION DISTRICT OR BY THE DEPARTMENT PRIOR TO IMPLEMENTATION.
5. AREAS TO BE FILLED ARE TO BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO REMOVE TREES, VEGETATION, ROOTS AND OTHER OBJECTIONABLE MATERIAL.
6. CLEARING, GRUBBING, AND TOPSOIL STRIPPING SHALL BE LIMITED TO THOSE AREAS DESCRIBED IN EACH STAGE OF THE CONSTRUCTION SEQUENCE. GENERAL SITE
CLEARING, GRUBBING AND TOPSOIL STRIPPING MAY NOT COMMENCE IN ANY STAGE OR PHASE OF THE PROJECT UNTIL THE E&S BMPS SPECIFIED BY THE BMP SEQUENCE FOR THAT STAGE OR PHASE HAVE BEEN INSTALLED AND ARE FUNCTIONING AS DESCRIBED IN THIS E&S PLAN.
7. AT NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE LIMIT OF DISTURBANCE BOUNDARIES SHOWN ON THE PLAN MAPS. THESE AREAS MUST BE CLEARLY MARKED AND FENCED OFF BEFORE CLEARING AND GRUBBING OPERATIONS BEGIN.
8. TOPSOIL REQUIRED FOR THE ESTABLISHMENT OF VEGETATION SHALL BE STOCKPILED AT THE LOCATION(S) SHOWN ON THE PLAN MAPS(S) IN THE AMOUNT NECESSARY TO COMPLETE THE FINISH GRADING OF ALL EXPOSED AREAS THAT ARE TO BE STABILIZED BY VEGETATION. EACH STOCKPILE SHALL BE PROTECTED IN THE MANNER SHOWN ON THE PLAN DRAWINGS. STOCKPILE HEIGHTS SHALL NOT EXCEED 35 FEET. STOCKPILE SLOPES SHALL BE 2H: 1V OR FLATTER.
9. IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR ACCELERATED EROSION AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT APPROPRIATE BEST MANAGEMENT PRACTICES TO MINIMIZE THE POTENTIAL FOR EROSION AND SEDIMENT POLLUTION AND NOTIFY THE
LOCAL CONSERVATION DISTRICT AND/OR THE REGIONAL OFFICE OF THE DEPARTMENT.
10. ALL BUILDING MATERIALS AND WASTES SHALL BE REMOVED FROM THE SITE AND RECYCLED OR DISPOSED OF IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., 271.1, AND 287.1 ET. SEQ. NO BUILDING MATERIALS OR WASTES OR UNUSED BUILDING MATERIALS
SHALL BE BURNED, BURIED, DUMPED, OR DISCHARGED AT THE SITE.
11. ALL OFF-SITE WASTE AND BORROW AREAS MUST HAVE AN E&S PLAN APPROVED BY THE LOCAL CONSERVATION DISTRICT OR THE DEPARTMENT FULLY IMPLEMENTED
PRIOR TO BEING ACTIVATED.
12. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS CLEAN FILL.
CLEAN FILL IS DEFINED AS: UNCONTAMINATED, NON-WATER SOLUBLE, NON-DECOMPOSABLE, INERT, SOLID MATERIAL. THE TERM INCLUDES SOIL, ROCK, STONE, DREDGED MATERIAL, USED ASPHALT, AND BRICK, BLOCK OR CONCRETE FROM CONSTRUCTION AND DEMOLITION ACTIVITIES THAT IS SEPARATE FROM OTHER WASTE AND IS RECOGNIZABLE AS SUCH. THE TERM DOES NOT INCLUDE MATERIALS PLACED IN OR ON THE WATERS OF THE COMMONWEALTH UNLESS OTHERWISE AUTHORIZED. (THE TERM "USED ASPHALT" DOES NOT INCLUDE MILLED ASPHALT OR ASPHALT THAT HAS BEEN PROCESSED FOR RE-USE).
CLEAN FILL AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE: FILL MATERIALS AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE STILL QUALIFIES AS CLEAN FILL PROVIDED THE TESTING REVEALS THAT THE FILL MATERIAL CONTAINS CONCENTRATIONS OF REGULATED SUBSTANCES THAT ARE BELOW THE RESIDENTIAL LIMITS IN TABLES FP-1A AND FP-1B FOUND IN THE DEPARTMENT'S POLICY "MANAGEMENT OF FILL".
ANY PERSON PLACING CLEAN FILL THAT HAS BEEN AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE MUST USE FORM FP-001 TO CERTIFY THE ORIGIN OF THE FILL MATERIAL AND THE RESULTS OF THE ANALYTICAL TESTING TO QUALIFY THE MATERIAL AS CLEAN FILL. FORM FP-001 MUST BE RETAINED BY THE OWNER OF THE PROPERTY RECEIVING THE FILL. A COPY OF FORM FP-001 CAN BE FOUND AT THE END OF THESE INSTRUCTIONS.
ENVIRONMENTAL DUE DILIGENCE: THE APPLICANT MUST PERFORM ENVIRONMENTAL DUE DILIGENCE TO DETERMINE IF THE FILL MATERIALS ASSOCIATED WITH THE PROJECT QUALIFY AS CLEAN FILL. ENVIRONMENTAL DUE DILIGENCE IS DEFINED AS: INVESTIGATIVE TECHNIQUES, INCLUDING, BUT NOT LIMITED TO, VISUAL PROPERTY INSPECTIONS, ELECTRONIC DATA BASE SEARCHES, REVIEW OF PROPERTY OWNERSHIP, REVIEW OF PROPERTY USE HISTORY, SANBORN MAPS, ENVIRONMENTAL QUESTIONNAIRES, TRANSACTION SCREENS, ANALYTICAL TESTING, ENVIRONMENTAL ASSESSMENTS OR AUDITS. ANALYTICAL TESTING IS NOT A REQUIRED PART OF DUE DILIGENCE UNLESS VISUAL INSPECTION AND/OR REVIEW OF THE PAST LAND USE OF THE PROPERTY INDICATES THAT THE FILL MAY HAVE BEEN SUBJECTED TO A SPILL OR RELEASE OF REGULATED SUBSTANCE. IF THE FILL MAY HAVE BEEN AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE, IT MUST BE TESTED TO DETERMINE IF IT QUALIFIES AS CLEAN FILL. TESTING SHOULD BE PERFORMED IN ACCORDANCE WITH APPENDIX A OF THE
DEPARTMENT'S POLICY "MANAGEMENT OF FILL".
FILL MATERIAL THAT DOES NOT QUALIFY AS CLEAN FILL IS REGULATED FILL. REGULATED FILL IS WASTE AND MUST BE MANAGED IN ACCORDANCE WITH THE DEPARTMENT'S MUNICIPAL OR RESIDUAL WASTE REGULATIONS BASED ON 25 PA. CODE CHAPTERS 287 RESIDUAL WASTE MANAGEMENT OR 271 MUNICIPAL WASTE MANAGEMENT, WHICHEVER IS APPLICABLE. THESE REGULATIONS ARE AVAILABLE ON-LINE AT WWW.PACODE.COM
13. ALL PUMPING OF WATER FROM ANY WORK AREA SHALL BE DIRECTED INTO A PUMPED WATER FILTER BAG AND DISCHARGED TO AN UNDISTURBED VEGETATED AREA.
14. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMPS SHALL BE MAINTAINED PROPERLY. MAINTENANCE SHALL INCLUDE INSPECTIONS OF ALL EROSION
AND SEDIMENT BMPS AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, RE-GRADING, RESEEDING, RE-MULCHING AND RE-NETTING MUST BE PERFORMED IMMEDIATELY. IF THE E&S BMPS FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMPS, OR MODIFICATIONS OF THOSE INSTALLED WILL BE REQUIRED.
15. A LOG SHOWING DATES THAT E&S BMPS WERE INSPECTED AS WELL AS ANY DEFICIENCIES FOUND AND THE DATE THEY WERE CORRECTED SHALL BE MAINTAINED ON THE SITE AND BE MADE AVAILABLE TO REGULATORY AGENCY OFFICIALS AT THE TIME OF INSPECTION.
16. SEDIMENT TRACKED ONTO ANY PUBLIC ROADWAY OR SIDEWALK SHALL BE RETURNED TO THE CONSTRUCTION SITE BY THE END OF EACH WORK DAY AND DISPOSED IN THE MANNER DESCRIBED IN THIS PLAN. IN NO CASE SHALL THE SEDIMENT BE WASHED, SHOVELED, OR SWEPT INTO ANY ROADSIDE DITCH, STORM SEWER, OR
SURFACE WATER.
17. ALL SEDIMENT REMOVED FROM BMPS SHALL BE DISPOSED OF IN THE MANNER DESCRIBED ON THE PLAN DRAWINGS.
18. AREAS WHICH ARE TO BE TOP SOILED (EXCLUDING LOCATIONS WHERE PCSM AMENDED SOILS ARE PROPOSED) SHALL BE SCARIFIED TO A MINIMUM DEPTH OF 3 TO 5
INCHES - 6 TO 12 INCHES ON COMPACTED SOILS -- PRIOR TO PLACEMENT OF TOPSOIL. AREAS TO BE VEGETATED SHALL HAVE A MINIMUM 4 INCHES OF TOPSOIL IN PLACE PRIOR TO SEEDING AND MULCHING. FILL SLOPES SHALL HAVE A MINIMUM OF 2 INCHES OF TOPSOIL.
19. ALL FILLS SHALL BE COMPACTED AS REQUIRED TO REDUCE EROSION, SLIPPAGE, SETTLEMENT, SUBSIDENCE OR OTHER RELATED PROBLEMS. FILL INTENDED TO SUPPORT BUILDINGS, STRUCTURES AND CONDUITS, ETC. SHALL BE COMPACTED IN ACCORDANCE WITH LOCAL REQUIREMENTS OR CODES.
20. ALL EARTHEN FILLS SHALL BE PLACED IN COMPACTED LAYERS NOT TO EXCEED 9 INCHES IN THICKNESS.
21. FILL MATERIALS SHALL BE FREE OF FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR OTHER FOREIGN OR OBJECTIONABLE MATERIALS THAT WOULD INTERFERE WITH OR
PREVENT CONSTRUCTION OF SATISFACTORY FILLS.
22. FROZEN MATERIALS OR SOFT, MUCKY, OR HIGHLY COMPRESSIBLE MATERIALS SHALL NOT BE INCORPORATED INTO FILLS.
23. FILL SHALL NOT BE PLACED ON SATURATED OR FROZEN SURFACES.
24. SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION SHALL BE HANDLED IN ACCORDANCE WITH THE STANDARD AND SPECIFICATION FOR SUBSURFACE DRAIN
OR OTHER APPROVED METHOD.
25. ALL GRADED AREAS SHALL BE PERMANENTLY STABILIZED IMMEDIATELY UPON REACHING FINISHED GRADE. CUT SLOPES IN COMPETENT BEDROCK AND ROCK FILLS
NEED NOT BE VEGETATED. SEEDED AREAS WITHIN 50 FEET OF A SURFACE WATER, OR AS OTHERWISE SHOWN ON THE PLAN DRAWINGS, SHALL BE BLANKETED
ACCORDING TO THE STANDARDS OF THIS PLAN.
26. IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE IN ANY AREA OR SUBAREA OF THE PROJECT, THE OPERATOR SHALL STABILIZE ALL DISTURBED AREAS.
DURING NON-GERMINATING MONTHS, MULCH OR PROTECTIVE BLANKETING SHALL BE APPLIED AS DESCRIBED IN THE PLAN. AREAS NOT AT FINISHED GRADE, WHICH WILL BE REACTIVATED WITHIN 1 YEAR, MAY BE STABILIZED IN ACCORDANCE WITH THE TEMPORARY STABILIZATION SPECIFICATIONS. THOSE AREAS WHICH WILL NOT BE REACTIVATED WITHIN 1 YEAR SHALL BE STABILIZED IN ACCORDANCE WITH THE PERMANENT STABILIZATION SPECIFICATIONS.
27. PERMANENT STABILIZATION IS DEFINED AS A MINIMUM UNIFORM, PERENNIAL 70% VEGETATIVE COVER OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED EROSION. CUT AND FILL SLOPES SHALL BE CAPABLE OF RESISTING FAILURE DUE TO SLUMPING, SLIDING, OR OTHER
MOVEMENTS.
28. E&S BMPS SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL AREAS TRIBUTARY TO THEM ARE PERMANENTLY STABILIZED OR UNTIL THEY ARE REPLACED BY ANOTHER
BMP APPROVED BY THE LOCAL CONSERVATION DISTRICT OR THE DEPARTMENT.
29. UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF ALL DISTURBED AREAS, THE OWNER AND/OR OPERATOR SHALL CONTACT THE LOCAL CONSERVATION DISTRICT FOR AN INSPECTION PRIOR TO REMOVAL/CONVERSION OF THE E&S BMPS.
30. AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND SEDIMENT BMPS MUST BE REMOVED OR CONVERTED TO PERMANENT POST CONSTRUCTION STORMWATER MANAGEMENT BMPS. AREAS DISTURBED DURING REMOVAL OR CONVERSION OF THE BMPS SHALL BE STABILIZED IMMEDIATELY. IN ORDER TO ENSURE RAPID RE-VEGETATION OF DISTURBED AREAS, SUCH REMOVAL/CONVERSIONS ARE TO BE DONE ONLY DURING THE GERMINATING SEASON.
31. UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF ALL DISTURBED AREAS, THE OWNER AND/OR OPERATOR SHALL
CONTACT THE LOCAL CONSERVATION DISTRICT TO SCHEDULE A FINAL INSPECTION.
32. FAILURE TO CORRECTLY INSTALL E&S BMPS, FAILURE TO PREVENT SEDIMENT-LADEN RUNOFF FROM LEAVING THE CONSTRUCTION SITE, OR FAILURE TO TAKE IMMEDIATE CORRECTIVE ACTION TO RESOLVE FAILURE OF E&S BMPS MAY RESULT IN ADMINISTRATIVE, CIVIL, AND/OR CRIMINAL PENALTIES BEING INSTITUTED BY THE DEPARTMENT AS DEFINED IN SECTION 602 OF THE PENNSYLVANIA CLEAN STREAMS LAW. THE CLEAN STREAMS LAW PROVIDES FOR UP TO $10,000 PER DAY IN CIVIL PENALTIES, UP TO $10,000 IN SUMMARY CRIMINAL PENALTIES, AND UP TO $25,000 IN MISDEMEANOR CRIMINAL PENALTIES FOR EACH VIOLATION.
MATERIAL NOTES
1. ALL BUILDING MATERIALS AND WASTES MUST BE REMOVED FROM THE SITE AND RECYCLED OR DISPOSED OF IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA. CODE CHAPTER 260, §§260.1 ET SEQ., 271.1, AND 287.1 ET. SEQ. NO BUILDING MATERIALS OR WASTES OR UNUSED BUILDING
MATERIALS SHALL BE BURNED, BURIED, DUMPED, OR DISCHARGED AT THE SITE.
2. ALL OFF-SITE WASTE AND BORROW AREAS MUST HAVE AN E&S PLAN APPROVED BY THE LOCAL CONSERVATION DISTRICT OR DEP FULLY IMPLEMENTED PRIOR TO
BEING ACTIVATED.
3. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS CLEAN FILL. FORM FP-001 MUST BE RETAINED BY THE PROPERTY OWNER FOR ANY FILL MATERIAL AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE BUT QUALIFYING AS CLEAN FILL DUE TO ANALYTICAL TESTING. ALL FILLS SHALL BE COMPACTED AS REQUIRED TO REDUCE EROSION, SLIPPAGE, SETTLEMENT, SUBSIDENCE OR OTHER RELATED PROBLEMS. FILL INTENDED TO SUPPORT BUILDINGS, STRUCTURES AND CONDUITS, ETC. SHALL BE COMPACTED IN ACCORDANCE WITH LOCAL REQUIREMENTS OR CODES.
4. FILL MATERIALS SHALL BE FREE OF FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR OTHER FOREIGN OR OBJECTIONABLE MATERIALS THAT WOULD INTERFERE WITH OR
PREVENT CONSTRUCTION OF SATISFACTORY FILLS.
5. FROZEN MATERIALS OR SOFT, MUCKY, OR HIGHLY COMPRESSIBLE MATERIALS SHALL NOT BE INCORPORATED INTO FILLS.
6. FILL SHALL NOT BE PLACED ON SATURATED OR FROZEN SURFACES.
STABILIZATION NOTES
1. STOCKPILE HEIGHTS MUST NOT EXCEED 35 FEET. STOCKPILE SLOPES MUST BE 2H: 1V OR FLATTER.
2. UPON TEMPORARY CESSATION OF AN EARTH DISTURBANCE OR ANY STAGE OR PHASE OF AN ACTIVITY WHERE A CESSATION OF EARTH DISTURBANCE ACTIVITIES
EXCEED 4 DAYS, THE SITE SHALL BE IMMEDIATELY SEEDED, MULCHED OR OTHERWISE PROTECTED FROM ACCELERATED EROSION AND SEDIMENTATION PENDING
FUTURE EARTH DISTURBANCE ACTIVITIES.
3. STRAW MULCH MUST BE APPLIED AT RATES OF AT LEAST 3.0 TONS PER ACRE. STRAW MULCH SHOULD BE ANCHORED IMMEDIATELY AFTER APPLICATION TO PREVENT
BEING WINDBLOWN.
4. ALL GRADED AREAS SHALL BE PERMANENTLY STABILIZED IMMEDIATELY UPON REACHING FINISHED GRADE. CUT SLOPES IN COMPETENT BEDROCK AND ROCK FILLS
NEED NOT BE VEGETATED.
5. EROSION CONTROL BLANKETING SHALL BE INSTALLED ON ALL SLOPES 3H: 1V OR STEEPER, WITHIN 50 FEET OF A SURFACE WATER AND ON ALL OTHER DISTURBED
AREAS SPECIFIED ON THE PLAN MAPS AND/OR DETAIL SHEETS.
6. IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE IN ANY AREA OR SUBAREA OF THE PROJECT, THE OPERATOR SHALL STABILIZE ALL DISTURBED AREAS.
DURING NON-GERMINATING MONTHS, MULCH OR PROTECTIVE BLANKETING SHALL BE APPLIED AS DESCRIBED IN THE PLAN. AREAS NOT AT FINISHED GRADE, WHICH WILL BE REACTIVATED WITHIN 1 YEAR, MAY BE STABILIZED IN ACCORDANCE WITH THE TEMPORARY STABILIZATION SPECIFICATIONS. THOSE AREAS WHICH WILL NOT BE REACTIVATED WITHIN 1 YEAR SHALL BE STABILIZED IN ACCORDANCE WITH THE PERMANENT STABILIZATION SPECIFICATIONS.
7. PERMANENT STABILIZATION IS DEFINED AS A MINIMUM UNIFORM, PERENNIAL 70% VEGETATIVE COVER OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED EROSION. CUT AND FILL SLOPES SHALL BE CAPABLE OF RESISTING FAILURE DUE TO SLUMPING, SLIDING, OR OTHER
MOVEMENTS.
CONSTRUCTION SEQUENCE
1. PRIOR TO CONSTRUCTION THE PROPOSED LIMIT OF DISTURBANCE (LOD) SHALL BE DELINEATED AND STAKED IN THE FIELD. THE BOUNDARY OF ANY ADJACENT
STREAMS OR WETLANDS SHALL ALSO BE STAKED.
2. INSTALL STABILIZED ROCK CONSTRUCTION ENTRANCES AT THE SITE ENTRANCE. VEHICLES AND EQUIPMENT SHALL ENTER AND EXIT ONLY BY MEANS OF THE STABILIZED ROCK CONSTRUCTION ENTRANCE. IF EXCESSIVE AMOUNTS OF SEDIMENT ARE BEING DEPOSITED ON ROADWAY, EXTEND LENGTH OF ROCK CONSTRUCTION ENTRANCE BY 50 FOOT INCREMENTS UNTIL CONDITION IS ALLEVIATED OR INSTALL WASH RACK. WASHING THE ROADWAY OR SWEEPING DEPOSITS INTO ROADWAY
DITCHES, SEWERS, CULVERTS, OR OTHER DRAINAGE COURSES IS NOT ACCEPTABLE.
3. INSTALL ALL PERIMETER BMP'S AS SHOWN ON ES-101. PERIMETER BMP'S INCLUDE ALL PROJECT SILT SOCK.
4. THE CONTRACTOR WILL INSPECT WEEKLY AND AFTER EACH RAIN EVENT, THE PROJECT'S EROSION AND SEDIMENTATION CONTROLS DURING THE ENTIRE ACTIVE
CONSTRUCTION STAGES. THE CONTRACTOR WILL BE RESPONSIBLE FOR THE INSTALLATION, OPERATION, MAINTENANCE, AND REMOVAL OF ALL EROSION AND
SEDIMENTATION CONTROLS THROUGHOUT THE ENTIRE CONSTRUCTION PROJECT.
THE CONTRACTOR MUST IMMEDIATELY REPAIR ANY DAMAGED EROSION CONTROLS (BMPS). SEDIMENT REMOVED FROM THE BMPS SHALL BE DISPOSED OF IN LANDSCAPED AREAS OUTSIDE OF STEEP SLOPES, WETLANDS, FLOODPLAINS, OR DRAINAGE SWALES AND IMMEDIATELY STABILIZED OR PLACED IN TOPSOIL
STOCKPILES.
5. EXTEND GRAVEL DRIVEWAY AND CONSTRUCT WELL HOUSE FACILITY. INSTALL 12" RAW WATER LINE FROM OH-20 WELL TO WELL HOUSE FACILITY.
6. BRUSH VALLEY ROAD BOOSTER PUMP STATION: CONSTRUCT METER VAULT, EQUIPMENT CANOPY AND FACILITY PIPING.
7. REMOVED SEDIMENT SHALL BE INCORPORATED INTO FINAL GRADING OPERATIONS OR DISPOSED OF OFF-SITE. THE CONTRACTOR SHALL REMOVE FROM THE SITE, RECYCLE, OR DISPOSE OF ALL CONSTRUCTION MATERIALS AND WASTES IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., 271.1 ET SEQ., AND 287.1 ET SEQ. THE CONTRACTOR SHALL PROPERLY DISPOSE ALL OF THESE MATERIALS AND OTHERS GENERATED DURING
CONSTRUCTION.
8. PERMANENTLY SEED ALL REMAINING DISTURBED AREAS. SEED FOLLOWING PERMANENT SEEDING GUIDELINES OUTLINED ON ES-501.
9. IF CONSTRUCTION IS TERMINATED OR SUSPENDED PRIOR TO CONSTRUCTION COMPLETION, ALL EXPOSED SOIL AREAS SHALL BE SEEDED WITH TEMPORARY SEEDING
AND MULCHED IMMEDIATELY. SEED FOLLOWING TEMPORARY SEEDING GUIDELINES ON ES-501.
10. STABILIZATION FOR THIS PROJECT SHALL CONSIST OF REVEGETATION OF DISTURBED AREAS. FINAL STABILIZATION OF VEGETATED AREAS WILL OCCUR WHEN A
MINIMUM UNIFORM 70% PERENNIAL VEGETATIVE COVER, WITH A DENSITY CAPABLE OF RESISTING ACCELERATED EROSION AND SEDIMENTATION. PAVED AREAS SHALL BE CONSIDERED PERMANENTLY STABILIZED WITH THE APPLICATION OF THE BASE COURSE LAYER.
11. AFTER FINAL STABILIZATION HAS BEEN ACHIEVED, TEMPORARY E&S BMPS SHALL BE REMOVED. AREAS DISTURBED DURING REMOVAL OF TEMPORARY E&S BMPS ARE
TO BE IMMEDIATELY STABILIZED.
NOTE: A COPY OF THE SEDIMENT AND EROSION CONTROL PLAN MUST BE AVAILABLE AT THE PROJECT SITE DURING CONSTRUCTION UNTIL THE SITE IS STABILIZED.
GROUND COVER
AFTER THE EARTH DISTURBANCE ACTIVITY IS COMPLETED, THE DISTURBED AREA MUST BE REVEGETATED. THE VEGETATIVE COVER MUST BE A UNIFORM 70% PERENNIAL VEGETATIVE COVER, WITH A DENSITY CAPABLE OF RESISTING ACCELERATED EROSION AND SEDIMENTATION. ANOTHER OPTION IS TO USE AN ACCEPTABLE BMP WHICH
PERMANENTLY MINIMIZES ACCELERATED EROSION AND SEDIMENTATION.
TEMPORARY SEEDING
TEMPORARY SEEDING WILL BE PERFORMED DURING THE GERMINATION SEASON (APRIL TO OCTOBER) FOR THE ESTABLISHMENT OF GRASS SEED ON DISTURBED AREAS
BEFORE THE START OF THE DORMANT SEASON. DURING THE NON-GERMINATION SEASON, MULCH SHALL BE APPLIED TO THE DISTURBED SURFACES AND THE SEED
MIXTURE WILL BE ADDED AT THE START OF THE GERMINATION PERIOD.
· ALL GRASS AREAS DISTURBED BY THE WORK OF THIS PROJECT SHALL BE SEEDED AS FOLLOWS:
- APPLY AGRICULTURAL LIME AND FERTILIZER AS FOLLOWS FOR TEMPORARY SEEDING:
¨ AGRICULTURAL LIME - 40 POUNDS PER 1,000 SQUARE FEET
¨ FERTILIZER - 12.5 POUNDS PER 1,000 SQUARE FEET
- FERTILIZER SHALL BE A COMMERCIAL TYPE 10-10-10.
- TEMPORARY SEED MIXTURE ANNUAL RYEGRASS -- 1 POUND PER 1,000 SQUARE FEET.
· ALL TEMPORARY SEEDING SHALL BE MULCHED. TEMPORARY SEEDING SHALL BE WATERED AS REQUIRED TO DEVELOP COVER. NON-POTABLE UTILITY WATER SHALL
BE PROVIDED BY THE CONTRACTOR.
· MULCH SHALL BE STRAW, SHALL BE CLEAN AND FREE FROM NOXIOUS WEEDS, AND SHALL BE APPLIED AT THE RATE OF 140 POUNDS PER 1,000 SQUARE FEET.
APPLICATION OF MULCH SHALL BE USED IN CONJUNCTION WITH CRIMPING, A TACKIFIER OR A SIMILAR METHOD IN ORDER TO PREVENT MULCH FROM BEING
WINDBLOWN.
PERMANENT SEEDING
PERMANENT SEEDING SHALL TAKE PLACE IN ALL DISTURBED AREAS AS FOLLOWS:
· UPON COMPLETION OF EARTH DISTURBANCE ACTIVITIES, THE SITE SHALL BE IMMEDIATELY STABILIZED.
· THE FOLLOWING SHALL BE SPREAD AND WORKED INTO THE TOPSOIL TO A DEPTH OF 3 TO 4 INCHES.
- AGRICULTURAL LIME - 240 POUNDS PER 1,000 SQUARE FEET
- FERTILIZER - 25 POUNDS PER 1,000 SQUARE FEET
¨ THE FERTILIZER SHALL BE A COMMERCIAL TYPE 10-20-20
¨ NOTE - IF AGRICULTURAL LIME AND FERTILIZER HAVE BEEN APPLIED PREVIOUSLY TO THE GROUND WHERE THE PERMANENT SEED IS TO BE APPLIED, THE
LIME AND FERTILIZER RATES SHALL BE REDUCED BY THE AMOUNT BY WHAT HAS BEEN APPLIED PREVIOUSLY.
· PERMANENT SEED MIXTURE: THE FOLLOWING SEED MIXTURES SHALL BE APPLIED AS FOLLOWS:
- UTILIZE SEED MIXTURE #2 FOR LAWN AREAS.
- APPLY MULCH TO ALL PERMANENTLY SEEDED AREAS.
¨ MATERIALS: STRAW, AIR-DRIED AND FREE FROM UNDESIRABLE SEEDS AND COURSE MATERIALS. APPLICATION: 140 POUNDS PER 1,000 SQUARE FEET.
APPLICATION OF MULCH SHALL BE USED IN CONJUNCTION WITH CRIMPING, A TACKIFIER OR A SIMILAR METHOD IN ORDER TO PREVENT MULCH FROM BEING
WINDBLOWN.
MAINTENANCE PROGRAM
EMERGENCY EROSION PROTECTION
IF EROSION DOES OCCUR, THE CONTRACTOR SHALL REPAIR AND RESEED THOSE AREAS OR USE OTHER STABILIZATION METHODS AS REQUIRED. THE CONTRACTOR SHALL USE JUTE, WOOD FIBER, OR OTHER TIE DOWN FILTER NETTING ON TOP OF THE NEW SEED AS REQUIRED, REGARDLESS OF THE SLOPE OF THE LAND.
MULCHED AREAS SHALL BE CHECKED WEEKLY AND AFTER EACH RAIN EVENT FOR DAMAGE, UNTIL THE MULCHING IS NO LONGER NECESSARY FOR PROTECTION AGAINST EROSION. DAMAGED PORTIONS OF THE MULCH OR TIE DOWN MATERIALS SHALL BE REPAIRED AS SOON AS DISCOVERED
PERIODIC INSPECTION PROGRAM
THE CONTRACTOR WILL INSPECT THE PROJECT'S EROSION AND SEDIMENTATION CONTROLS WEEKLY AND AFTER EACH RAIN EVENT UNTIL THE SITE HAS ACHIEVED FINAL STABILIZATION. THE CONTRACTOR WILL BE RESPONSIBLE FOR THE INSTALLATION, OPERATION, MAINTENANCE, AND REMOVAL OF ALL EROSION AND SEDIMENTATION CONTROLS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT REPAIR, REPLACEMENT, REGRADING, RESEEDING, REMULCHING, AND RENETTING MUST BE PERFORMED IMMEDIATELY. SEDIMENT THAT HAS BEEN TRAPPED BY THE COMPOST SOCK WILL BE REMOVED AS REQUIRED, AND IN ALL CASES, BEFORE THE ACCUMULATION HAS REACHED HALF THE HEIGHT OF THE SOCK. COMPOST SOCK WILL BE RE-ANCHORED, REPAIRED, OR REPLACED AS NECESSARY. SEDIMENT MUST BE REMOVED FROM SILT SACKS AFTER EACH RUNOFF EVENT, OR WHEN THE DISTANCE BETWEEN THE GRATE AND THE SEDIMENT LEVEL IN THE SILT SACK IS REDUCED TO 18". SILT SACKS WILL BE REPAIRED, OR REPLACED AS NECESSARY. ALL OTHER CONTROLS WILL BE INSPECTED ON THE SAME SCHEDULE. IF EROSION AND SEDIMENT CONTROL BMPS FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMPS, OR MODIFICATION OF THOSE INSTALLED WILL BE
REQUIRED.
MAINTENANCE OPERATIONS
AS PART OF THE LONG TERM OPERATION AND MAINTENANCE, ROUTINE MAINTENANCE INSPECTIONS WILL BE REQUIRED TO INSURE THE EFFICIENCY OF ALL THE SEDIMENT CONTROL DEVICES. AT A MINIMUM, ALL BMP'S SHALL BE INSPECTED ON A WEEKLY BASIS AND AFTER EACH MEASURABLE RUNOFF EVENT, INCLUDING THE REPAIR OF THE BMP'S TO ENSURE EFFECTIVE AND EFFICIENT OPERATION. THIS INSPECTION SHALL BE FOLLOWED UP WITH A REPAIR SCHEDULE OF ALL NOTED DEFICIENCIES. VEGETATION PROGRESS SHALL ALSO BE INCLUDED IN THIS INSPECTION. VOID AREAS SHALL PROMPTLY BE RESEEDED AND MULCHED TO ESTABLISH
PROTECTION.
BMP'S THAT FAIL AFTER INSTALLATION MUST BE REPAIRED TO FUNCTION PROPERLY OR BE REPLACED BY ALTERNATIVE BMP'S THAT WILL SERVE THE INTENDED PURPOSE. IF UNFORESEEN CONDITIONS OCCUR ON A SITE, AND THE INSTALLED BMP'S ARE OBVIOUSLY NOT EFFECTIVE, THEN ALTERNATE BMP'S MUST BE DESIGNED
AND INSTALLED. THE NEED FOR REDESIGN WILL BE DETERMINED ON A CASE-BY-CASE BASIS.
ANY CHANGES OR ADDITIONS MADE TO THIS PLAN WILL BE DONE SO IN WRITING WITH A SIGNATURE FROM A PERMITTEE OR CO-PERMITTEE REPRESENTATIVE. THESE CHANGES OR ADDITIONS MUST BE APPROVED AND INITIALED BY A PA DEP REPRESENTATIVE AND KEPT ON-SITE WITH THIS NPDES PERMIT.
REMOVAL OF CONTROLS AND CONTINUING MAINTENANCE
ALL REQUIRED TEMPORARY EROSION AND SEDIMENTATION CONTROLS SHALL REMAIN IN PLACE AND BE MAINTAINED UNTIL THE AREA THEY PROTECT HAS BEEN STABILIZED. AREAS DISTURBED DURING REMOVAL OF THE CONTROLS MUST BE STABILIZED IMMEDIATELY.
STABILIZATION FOR THIS PROJECT SHALL CONSIST OF REVEGETATION OF DISTURBED AREAS. FINAL STABILIZATION OF VEGETATED AREAS WILL OCCUR WHEN A MINIMUM UNIFORM 70% PERENNIAL VEGETATIVE COVER, WITH A DENSITY CAPABLE OF RESISTING ACCELERATED EROSION AND SEDIMENTATION. PAVED AREAS SHALL BE CONSIDERED PERMANENTLY STABILIZED WITH THE APPLICATION OF THE BASE COURSE LAYER.
REVEGETATION SHALL OCCUR IMMEDIATELY AFTER COMPLETION OF THE FINAL GRADING. SHOULD CONDITIONS PROHIBIT PERMANENT REVEGETATION EFFORTS, THE AREA WILL BE TEMPORARILY STABILIZED THROUGH THE USE OF QUICK-GROWING GRASSES,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .