1-Project Manual.pdf

PDF 16 MB Posted

Attached to
Oak Hall OH-20 Well Facility and Booster Pump Station
Solicitation number
US.211060
Issued by
Centre County, Terre Hill Borough, Pennsylvania

About this file

This Project Manual contains bidding documents and contract specifications for the College Township Water Authority (Owner) for the Oak Hall OH-20 Well Facility and Booster Pump Station construction project located in College Township, Centre County, Pennsylvania. The project consists of constructing a 1,000 gallons per minute (gpm) well facility and separate water booster station, including a 30-foot by 40-foot building, clearwell, pumps, internal and yard piping, chemical feed systems, electrical and instrumentation systems, HVAC, plumbing, appurtenances, paving, and site restoration. The work is divided into two separate contracts: Contract No. 1 for General/Mechanical work and Contract No. 2 for Electrical work. A mandatory pre-bid conference is scheduled for Wednesday, December 3, 2025 at 10:00 a.m. at the College Township Offices, with bids due electronically via the PennBid Program by Tuesday, December 23, 2025 at 2:00 p.m. local time. All bidding documents are available at no cost through the PennBid Program. The contract period consists of 300 days to Substantial Completion and 330 days for completion and readiness for final payment, with liquidated damages set at $500 per day for failure to meet either deadline.

Bidders must submit a 10 percent bid security in the form of a bid bond, provide evidence of authorization to do business in Pennsylvania, and furnish qualifications statements with supporting documentation including experience with similar projects. The project is subject to prevailing wage requirements as determined by the Pennsylvania Department of Labor and Industry, with specific hourly rates and fringe benefits established for various trades. All steel products must be manufactured in the United States in compliance with the Steel Products Procurement Act. The project includes a $40,000 allowance for PLC panel, programming, and startup costs and a $20,000 allowance for building permit fees. The Owner is exempt from sales and compensating use taxes on materials incorporated into the work. Performance and payment bonds are required in amounts equal to the contract price, and comprehensive insurance coverage is mandated including workers' compensation, commercial general liability, automobile liability, and umbrella coverage. The project was financed in part by a grant from the Commonwealth of Pennsylvania, Commonwealth Financing Authority H2O program.

View the file

Other files

File Type Posted
2-Project Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .