2-PrevWages.pdf

PDF 30 KB Posted

Attached to
Bushkill Drive KSAT Trail Extension Project (2026-BDTE)
Solicitation number
Not on record
Issued by
Northampton County, Pennsylvania

About this file

This is a prevailing wage determination document issued by the Commonwealth of Pennsylvania Department of Labor & Industry for the Bushkill Drive KSAT Trail Extension Project (Serial Number 26-06356) in the City of Easton, Northampton County. The project classification is Highway, with a determination date of July 6, 2026, and contract award date of August 14, 2026. The Scranton Field Office is the assigned field office for oversight. The document establishes prevailing wage rates applicable to construction work on the project, which consists of improvements along Bushkill Drive including approximately 750 linear feet of 8-foot-wide asphalt trail, sawcutting of existing pavement, approximately 435 linear feet of 7-foot-wide parallel parking lanes, and a 2-foot-wide pavement-marked buffer between parking and adjacent improvements.

The prevailing wage document provides comprehensive hourly rates and fringe benefits for both building and heavy/highway construction classifications, with rates effective through various dates extending into 2028. Labor categories listed include carpenters, laborers (Classes 01-08), operators (Heavy and Highway classes), painters, truck drivers, electricians, and numerous skilled trades, with total compensation ranging from approximately $41.87 for truck driver Class 1 to $115.63 for electricians as of May 31, 2027. Rates are adjusted annually with effective dates ranging from January 2022 through May 2028, reflecting union agreements and industry standards in Pennsylvania. All contractors bidding on this project must comply with these prevailing wage requirements, ensuring workers are paid at or above the specified hourly rates plus fringe benefits regardless of union membership status.

View the file

Other files

File Type Posted
3-KSAT Trail Section A.3 to A.4 Plans.pdf PDF
4-KSAT Trail Section A.3 to A.4 Technical Specifications.pdf PDF
5-Contract Forms.pdf PDF
6-Bid Package 070626.pdf PDF
1-Traffic Notification List 2023.pdf PDF
7-PrevWages.pdf PDF
5-Addendum No. 1.pdf PDF
2-Project Bid Form.pdf PDF
3-Bid Package - Full.pdf PDF
4-Contract Forms.pdf PDF
6-Addendum No. 2.pdf PDF
2-EIM Hot Spot Cleanup Tech Specs (12-18-25).pdf PDF
4-Bid Package.pdf PDF
1-Traffic Notification List 2023.pdf PDF
3-Contract Forms.pdf PDF
4-Bid Package - Full.pdf PDF
5-Spray Lining Plan.pdf PDF
1-Traffic Notification List 2023.pdf PDF
3-Spray Lining Plan.pdf PDF
2-CCPspecifications.pdf PDF
5-Bid Package - Full.pdf PDF
4-Contract Forms 8-15.pdf PDF
3-Contract Forms 8-15.pdf PDF
6-Addendum No. 1.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Name: Bushkill Drive (KSAT) Trail

General Description: KSAT Trail Sections A3 and A4 along Bushkill Drive

Project Locality City of Easton

Awarding Agency: City of Easton

Contract Award Date: 8/14/2026

Serial Number: 26-06356

Project Classification: Highway

Determination Date: 7/6/2026

Assigned Field Office: Scranton

Field Office Phone Number: (570)963-4577

Toll Free Phone Number: (877)214-3962

Project County: Northampton County

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Commonwealth of Pennsylvania Department of Labor & Industry Report Date: 7/6/2026 Page 1 of 6

Project: 26-06356 - Building Effective Date

Expiration Date

Hourly Rate Fringe Benefits

Total

Asbestos & Insulation Workers 6/30/2025 $41.50 $29.86 $71.36

Asbestos & Insulation Workers 6/29/2026 $43.50 $31.11 $74.61

Boilermaker (Commercial, Institutional, and Minor Repair Work)

3/1/2024 $36.71 $19.13 $55.84

Boilermaker (Commercial, Institutional, and Minor Repair Work)

3/1/2026 $41.34 $19.23 $60.57

Boilermakers 1/1/2024 $52.10 $35.72 $87.82

Boilermakers 1/1/2026 $58.00 $36.57 $94.57

Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners

5/4/2025 $40.14 $22.07 $62.21

Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners

5/3/2026 $41.99 $22.07 $64.06

Carpenter - Chief of Party (Surveying & Layout) 5/1/2025 $43.71 $28.09 $71.80

Carpenter - Chief of Party (Surveying & Layout) 5/1/2026 $45.01 $28.44 $73.45

Carpenter - Chief of Party (Surveying & Layout) 5/1/2027 $46.51 $28.79 $75.30

Carpenter - Chief of Party (Surveying & Layout) 5/1/2028 $48.16 $29.14 $77.30

Carpenter - Instrument Person (Surveying & Layout) 5/1/2025 $39.74 $28.09 $67.83

Carpenter - Instrument Person (Surveying & Layout) 5/1/2026 $41.04 $28.44 $69.48

Carpenter - Instrument Person (Surveying & Layout) 5/1/2027 $42.54 $28.79 $71.33

Carpenter - Instrument Person (Surveying & Layout) 5/1/2028 $44.19 $29.14 $73.33

Carpenter - Rodman (Surveying & Layout) 5/1/2025 $23.84 $22.20 $46.04

Carpenter - Rodman (Surveying & Layout) 5/1/2026 $24.62 $22.55 $47.17

Carpenter - Rodman (Surveying & Layout) 5/1/2027 $25.52 $22.90 $48.42

Carpenter - Rodman (Surveying & Layout) 5/1/2028 $26.51 $23.25 $49.76

Carpenters 5/1/2025 $39.74 $28.09 $67.83

Carpenters 5/1/2026 $41.04 $28.44 $69.48

Carpenters 5/1/2027 $42.54 $28.79 $71.33

Carpenters 5/1/2028 $44.19 $29.14 $73.33

Cement Finishers & Plasterers 5/4/2025 $33.66 $22.42 $56.08

Cement Finishers & Plasterers 5/3/2026 $35.66 $22.42 $58.08

Cement Finishers & Plasterers 5/3/2027 $34.92 $25.16 $60.08

Cement Masons 5/1/2024 $36.18 $25.20 $61.38

Cement Masons 5/1/2025 $37.78 $25.40 $63.18

Dockbuilder, Pile Drivers 5/1/2025 $55.23 $37.99 $93.22

Dockbuilder, Pile Drivers 5/1/2026 $56.98 $37.99 $94.97

Dockbuilder/Pile Driver Diver 5/1/2025 $64.35 $41.74 $106.09

Dockbuilder/Pile Driver Diver 5/1/2026 $66.54 $41.74 $108.28

Dockbuilder/pile driver tender 5/1/2025 $55.23 $37.99 $93.22

Dockbuilder/pile driver tender 5/1/2026 $56.98 $37.99 $94.97

Drywall Finisher 5/1/2025 $31.83 $23.26 $55.09

Drywall Finisher 5/1/2026 $33.02 $24.00 $57.02

Electricians 6/2/2025 $65.43 $42.20 $107.63

Electricians 6/1/2026 $67.92 $43.81 $111.73

Electricians 5/31/2027 $70.29 $45.34 $115.63

Elevator Constructor 1/1/2025 $61.41 $44.95 $106.36

Elevator Constructor 1/1/2026 $64.06 $46.01 $110.07

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 7/6/2026 Page 2 of 6

Expiration Date

Hourly Rate Fringe Benefits

Total

Floor Coverer 5/1/2025 $41.23 $29.79 $71.02

Floor Coverer 5/1/2026 $42.23 $30.79 $73.02

Floor Layer 5/1/2018 $33.32 $26.49 $59.81

Glazier 5/1/2024 $39.48 $23.81 $63.29

Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)

7/1/2025 $38.76 $33.38 $72.14

Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)

7/1/2026 $40.51 $33.88 $74.39

Laborers (Class 01 - See notes) 5/1/2025 $32.09 $20.14 $52.23

Laborers (Class 01 - See notes) 5/1/2026 $33.09 $20.79 $53.88

Laborers (Class 02 - See notes) 5/1/2025 $33.12 $20.14 $53.26

Laborers (Class 02 - See notes) 5/1/2026 $34.12 $20.79 $54.91

Laborers (Class 03 - See notes) 4/27/2025 $32.74 $20.14 $52.88

Laborers (Class 03 - See notes) 5/1/2026 $33.74 $20.79 $54.53

Laborers (Class 04 - See notes) 4/27/2025 $34.24 $20.14 $54.38

Laborers (Class 04 - See notes) 5/1/2026 $35.24 $20.79 $56.03

Laborers (Class 05 - See notes) 5/1/2025 $34.09 $20.14 $54.23

Laborers (Class 05 - See notes) 5/1/2026 $35.09 $20.79 $55.88

Laborers (Class 06 - See notes) 5/1/2025 $33.44 $20.14 $53.58

Laborers (Class 06 - See notes) 5/1/2026 $34.44 $20.79 $55.23

Marble Mason 5/1/2025 $36.57 $21.69 $58.26

Marble Mason 5/3/2026 $36.18 $24.03 $60.21

Millwright 5/1/2025 $53.87 $33.95 $87.82

Millwright 5/1/2026 $56.51 $33.95 $90.46

Operators (Building, Class 01 - See Notes) 5/1/2025 $44.89 $30.92 $75.81

Operators (Building, Class 01 - See Notes) 5/1/2026 $46.05 $31.76 $77.81

Operators (Building, Class 01A - See Notes) 5/1/2025 $47.14 $31.58 $78.72

Operators (Building, Class 01A - See Notes) 5/1/2026 $48.30 $32.42 $80.72

Operators (Building, Class 02 - See Notes) 5/1/2025 $44.61 $30.83 $75.44

Operators (Building, Class 02 - See Notes) 5/1/2026 $45.77 $31.67 $77.44

Operators (Building, Class 02A - See Notes) 5/1/2025 $46.86 $31.50 $78.36

Operators (Building, Class 02A - See Notes) 5/1/2026 $48.02 $32.34 $80.36

Operators (Building, Class 03 - See Notes) 5/1/2025 $41.88 $30.03 $71.91

Operators (Building, Class 03 - See Notes) 5/1/2026 $43.04 $30.87 $73.91

Operators (Building, Class 04 - See Notes) 5/1/2025 $40.74 $29.70 $70.44

Operators (Building, Class 04 - See Notes) 5/1/2026 $41.90 $30.54 $72.44

Operators (Building, Class 05 - See Notes) 5/1/2025 $40.30 $29.56 $69.86

Operators (Building, Class 05 - See Notes) 5/1/2026 $41.45 $30.41 $71.86

Operators (Building, Class 06 - See Notes) 5/1/2025 $39.42 $29.30 $68.72

Operators (Building, Class 06 - See Notes) 5/1/2026 $40.58 $30.14 $70.72

Operators (Building, Class 07A- See Notes) 5/1/2025 $54.56 $35.21 $89.77

Operators (Building, Class 07A- See Notes) 5/1/2026 $56.03 $36.14 $92.17

Operators (Building, Class 07B- See Notes) 5/1/2025 $54.22 $35.10 $89.32

Operators (Building, Class 07B- See Notes) 5/1/2026 $55.69 $36.03 $91.72

Painters Class 1 (see notes) 5/1/2025 $32.71 $24.17 $56.88

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 7/6/2026 Page 3 of 6

Expiration Date

Hourly Rate Fringe Benefits

Total

Painters Class 1 (see notes) 5/1/2026 $33.89 $24.69 $58.58

Painters - Line Stripping 12/1/2024 $44.12 $27.91 $72.03

Painters - Line Stripping 12/1/2025 $45.12 $29.41 $74.53

Painters Class 2 (see notes) 5/1/2025 $35.61 $24.18 $59.79

Painters Class 3 (see notes) 5/1/2025 $41.71 $24.18 $65.89

Piledrivers 1/1/2022 $37.60 $20.50 $58.10

Plasterers 5/1/2024 $37.13 $24.51 $61.64

Plasterers 5/1/2025 $38.43 $24.71 $63.14 plumber 5/1/2025 $56.28 $36.01 $92.29 plumber 5/1/2026 $58.43 $36.61 $95.04

Roofers (Composition) 5/1/2025 $46.03 $34.77 $80.80

Roofers (Composition) 5/1/2026 $47.53 $35.22 $82.75

Roofers (Shingle) 5/1/2024 $34.35 $22.20 $56.55

Roofers (Slate & Tile) 5/1/2024 $37.35 $22.20 $59.55

Sheet Metal Workers 6/1/2025 $45.02 $44.71 $89.73

Sheet Metal Workers 6/1/2026 $46.62 $46.36 $92.98

Sign Makers and Hangars 7/15/2024 $32.32 $25.82 $58.14

Sign Makers and Hangars 7/15/2025 $33.48 $26.41 $59.89

Sprinklerfitters 4/1/2025 $49.75 $29.21 $78.96

Sprinklerfitters 4/1/2026 $52.82 $30.56 $83.38

Steamfitters 5/1/2024 $59.65 $43.09 $102.74

Steamfitters 5/1/2025 $61.47 $44.89 $106.36

Terrazzo Finisher 5/1/2025 $36.32 $21.68 $58.00

Terrazzo Finisher 5/1/2026 $37.12 $22.76 $59.88

Terrazzo Grinder 5/1/2025 $37.10 $21.68 $58.78

Terrazzo Grinder 5/1/2026 $37.93 $22.76 $60.69

Terrazzo Mechanics 5/1/2025 $37.17 $23.43 $60.60

Terrazzo Mechanics 5/1/2026 $38.06 $24.51 $62.57

Tile & Marble Finisher 5/1/2025 $34.55 $18.09 $52.64

Tile & Marble Finisher 5/1/2026 $36.50 $18.09 $54.59

Tile Setter 5/1/2025 $36.57 $21.69 $58.26

Tile Setter 5/3/2026 $36.18 $24.03 $60.21

Truckdriver class 1(see notes) 5/1/2025 $41.87 $0.00 $41.87

Truckdriver class 2 (see notes) 5/1/2025 $41.94 $0.00 $41.94

Truckdriver class 3 (see notes) 5/1/2025 $42.43 $0.00 $42.43

Window Film / Tint Installer 6/1/2024 $26.37 $14.83 $41.20

Window Film / Tint Installer 6/1/2025 $27.42 $15.13 $42.55

Window Film / Tint Installer 6/1/2026 $28.35 $15.60 $43.95

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 7/6/2026 Page 4 of 6

Project: 26-06356 - Heavy/Highway Effective

Expiration Date

Hourly Rate Fringe Benefits

Total

Carpenter - Chief of Party (Surveying & Layout) 5/1/2025 $46.05 $28.09 $74.14

Carpenter - Chief of Party (Surveying & Layout) 5/1/2026 $47.31 $28.44 $75.75

Carpenter - Instrument Person (Surveying & Layout) 5/1/2025 $40.04 $28.09 $68.13

Carpenter - Instrument Person (Surveying & Layout) 5/1/2026 $41.14 $28.44 $69.58

Carpenter - Rodman (Surveying & Layout) 5/1/2025 $32.03 $22.20 $54.23

Carpenter - Rodman (Surveying & Layout) 5/1/2026 $32.91 $22.55 $55.46

Carpenters 5/1/2025 $40.04 $28.09 $68.13

Carpenters 5/1/2026 $41.14 $28.44 $69.58

Dockbuilder, Pile Drivers 5/1/2025 $55.23 $37.99 $93.22

Dockbuilder, Pile Drivers 5/1/2026 $56.98 $37.99 $94.97

Dockbuilder/Pile Driver Diver 5/1/2025 $60.31 $44.97 $105.28

Dockbuilder/Pile Driver Diver 5/1/2026 $61.88 $45.47 $107.35

Dockbuilder/pile driver tender 5/1/2025 $55.23 $37.99 $93.22

Dockbuilder/pile driver tender 5/1/2026 $56.98 $37.99 $94.97

Electric Lineman 6/3/2024 $52.80 $30.61 $83.41

Electric Lineman 6/2/2025 $55.42 $31.04 $86.46

Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)

7/1/2024 $37.26 $32.63 $69.89

Laborers (Class 01 - See notes) 5/1/2025 $26.61 $19.99 $46.60

Laborers (Class 01 - See notes) 5/1/2026 $27.61 $20.44 $48.05

Laborers (Class 02 - See notes) 5/1/2025 $33.23 $19.99 $53.22

Laborers (Class 02 - See notes) 5/1/2026 $34.23 $20.44 $54.67

Laborers (Class 03 - See notes) 5/1/2025 $30.22 $19.99 $50.21

Laborers (Class 03 - See notes) 5/1/2026 $31.22 $20.44 $51.66

Laborers (Class 04 - See notes) 5/1/2025 $30.57 $19.99 $50.56

Laborers (Class 04 - See notes) 5/1/2026 $31.57 $20.44 $52.01

Laborers (Class 05 - See notes) 5/1/2025 $31.24 $19.99 $51.23

Laborers (Class 05 - See notes) 5/1/2026 $32.24 $20.44 $52.68

Laborers (Class 06 - See notes) 5/1/2025 $30.66 $19.99 $50.65

Laborers (Class 06 - See notes) 5/1/2026 $31.66 $20.44 $52.10

Laborers (Class 07 - See notes) 5/1/2025 $30.95 $19.99 $50.94

Laborers (Class 07 - See notes) 5/1/2026 $31.95 $20.44 $52.39

Laborers (Class 08 - See notes) 5/1/2025 $31.43 $19.99 $51.42

Laborers (Class 08 - See notes) 5/1/2026 $32.43 $20.44 $52.87

Operators (Heavy, Class 01 - See Notes) 5/1/2025 $43.46 $30.50 $73.96

Operators (Heavy, Class 01 - See Notes) 5/1/2026 $44.61 $31.35 $75.96

Operators (Heavy, Class 01A - See Notes) 5/1/2025 $45.71 $31.16 $76.87

Operators (Heavy, Class 01A - See Notes) 5/1/2026 $46.86 $32.01 $78.87

Operators (Heavy, Class 02 - See Notes) 5/1/2025 $43.18 $30.41 $73.59

Operators (Heavy, Class 02 - See Notes) 5/1/2026 $44.34 $31.25 $75.59

Operators (Heavy, Class 02A - See Notes) 5/1/2025 $45.43 $31.08 $76.51

Operators (Heavy, Class 02A - See Notes) 5/1/2026 $46.59 $31.92 $78.51

Operators (Heavy, Class 03 - See Notes) 5/1/2025 $40.26 $29.55 $69.81

Operators (Heavy, Class 03 - See Notes) 5/1/2026 $41.43 $30.38 $71.81

Operators (Heavy, Class 04 - See Notes) 5/1/2025 $39.12 $29.22 $68.34

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 7/6/2026 Page 5 of 6

Project: 26-06356 - Heavy/Highway Effective

Expiration Date

Hourly Rate Fringe Benefits

Total

Operators (Heavy, Class 04 - See Notes) 5/1/2026 $40.28 $30.06 $70.34

Operators (Heavy, Class 05 - See Notes) 5/1/2025 $38.67 $29.09 $67.76

Operators (Heavy, Class 05 - See Notes) 5/1/2026 $39.83 $29.93 $69.76

Operators (Heavy, Class 06 - See Notes) 5/1/2025 $37.80 $28.82 $66.62

Operators (Heavy, Class 06 - See Notes) 5/1/2026 $38.96 $29.66 $68.62

Operators (Heavy, Class 07A - See Notes) 5/1/2025 $52.85 $34.71 $87.56

Operators (Heavy, Class 07A - See Notes) 5/1/2026 $54.32 $35.64 $89.96

Operators (Heavy, Class 07B - See Notes) 5/1/2025 $52.51 $34.60 $87.11

Operators (Heavy, Class 07B - See Notes) 5/1/2026 $53.97 $35.54 $89.51

Operators (Highway, Class 01 - See Notes) 5/1/2025 $42.56 $30.24 $72.80

Operators (Highway, Class 01 - See Notes) 5/1/2026 $43.72 $31.08 $74.80

Operators (Highway, Class 01a - See Notes) 5/1/2025 $44.81 $30.92 $75.73

Operators (Highway, Class 01a - See Notes) 5/1/2026 $45.97 $31.76 $77.73

Operators (Highway, Class 02 - See Notes) 5/1/2025 $41.39 $29.89 $71.28

Operators (Highway, Class 02 - See Notes) 5/1/2026 $42.55 $30.73 $73.28

Operators (Highway, Class 03 - See Notes) 5/1/2025 $40.70 $29.68 $70.38

Operators (Highway, Class 03 - See Notes) 5/1/2026 $41.87 $30.51 $72.38

Operators (Highway, Class 04 - See Notes) 5/1/2025 $40.26 $29.54 $69.80

Operators (Highway, Class 04 - See Notes) 5/1/2026 $41.41 $30.39 $71.80

Operators (Highway, Class 05 - See Notes) 5/1/2025 $39.73 $29.41 $69.14

Operators (Highway, Class 05 - See Notes) 5/1/2026 $40.89 $30.25 $71.14

Operators (Highway, Class 06 - See Notes) 5/1/2025 $42.80 $30.30 $73.10

Operators (Highway, Class 06 - See Notes) 5/1/2026 $43.95 $31.15 $75.10

Operators (Highway, Class 06/A - See Notes) 5/1/2025 $45.05 $30.96 $76.01

Operators (Highway, Class 06/A - See Notes) 5/1/2026 $46.21 $31.80 $78.01

Operators (Highway, Class 07/A - See Notes) 5/1/2025 $51.79 $34.38 $86.17

Operators (Highway, Class 07/A - See Notes) 5/1/2026 $53.25 $35.32 $88.57

Operators (Highway, Class 07/B - See Notes) 5/1/2025 $50.37 $33.97 $84.34

Operators (Highway, Class 07/B - See Notes) 5/1/2026 $51.84 $34.90 $86.74

Painters - Line Stripping 12/1/2024 $44.12 $27.91 $72.03

Painters - Line Stripping 12/1/2025 $45.12 $29.41 $74.53

Painters Class 2 (see notes) 5/1/2025 $35.61 $24.18 $59.79

Painters Class 2 (see notes) 5/1/2026 $38.00 $24.79 $62.79

Painters Class 3 (see notes) 5/1/2025 $41.71 $24.18 $65.89

Painters Class 3 (see notes) 5/1/2026 $44.10 $24.79 $68.89

Piledrivers 5/1/2021 $43.73 $37.99 $81.72

Steamfitters (Heavy and Highway - Gas Distribution) 5/1/2025 $54.39 $44.73 $99.12

Truckdriver class 1(see notes) 5/1/2025 $41.87 $0.00 $41.87

Truckdriver class 2 (see notes) 5/1/2025 $41.94 $0.00 $41.94

Truckdriver class 3 (see notes) 5/1/2025 $42.43 $0.00 $42.43

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 7/6/2026 Page 6 of 6

File details come from the government source that posted it. Updated .