2-Plans Town Meadows Court Roadway Improvements.pdf

PDF 8 MB Posted

Attached to
IFB - Towne Center Court Roadway Improvements
Solicitation number
2026-009
Issued by
Salt Lake County, Utah

About this file

This document is a comprehensive set of construction plans and standard notes for the City of South Jordan, Utah, prepared by professional engineer Brad Klavano for the Towne Meadows Court Roadway Improvements project. The project, located approximately at 1850 West 9800 South in South Jordan, involves furnishing and installing multiple infrastructure systems including an 8-inch C-900 PVC waterline, 18-inch and 15-inch high-performance storm drain lines, street lighting, concrete sidewalks, curb and gutter, roadway grading and asphalt overlay, signing and striping, and miscellaneous landscaping improvements. The City will award the base bid (Schedule A) to the lowest responsive and responsible bidder, with a Notice to Proceed anticipated for March 18, 2026, requiring substantial completion within 90 days. An optional Alternative Bid Schedule B includes mill and overlay work in the Union Pacific Railroad right-of-way at approximately 10000 South and 371 West, requiring completion within 60 days and striping within 72 hours of overlay completion; this alternative will only be awarded if budget is available. The project includes detailed specifications for waterline installation with thrust blocks and mechanical joint restraints, storm drain pipe with minimum 18-inch RCP Class III or HDPE, catch basins with 12-inch silt traps, standard street lighting with 120-volt input and grounding requirements, and asphalt paving with PG 58-28 binder grade and no more than 15% reclaimed asphalt pavement by weight.

The contractor must comply with South Jordan City Construction Standards and Specifications, APWA standards, MUTCD requirements, and all applicable federal, state, and local regulations. All work shall conform to standard notes covering general construction requirements, traffic control, street lighting, grading, water systems, and storm drainage. The contractor is responsible for locating all underground utilities, obtaining all required permits and inspections, and protecting existing improvements; any damage resulting from construction activities must be repaired at the contractor's expense. A UPDES permit and Storm Water Pollution Prevention Plan are required for construction activities, and the contractor must maintain regular working hours (Monday-Friday, 7:00 AM to 4:00 PM) unless prior approval is obtained from the City Engineer for overtime or weekend work. Prior to 90% bond release, the contractor must submit legible as-built drawings stamped and signed by a professional engineer in .dxf and .pdf formats. Material submittals must be approved by the City Engineer prior to asphalt placement within the right-of-way. The project is funded by the City of South Jordan and is located entirely within South Jordan City limits.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOUTH JORDAN CITY

S-01 - 04

SHEET INDEX

TOWN MEADOWS COURT IMPROVEMENTS

COVER SHEET / INDEX

STANDARD NOTES

VICINITY MAP

TOWN MEADOWS COURT

(APPROX 1850 WEST 9800 SOUTH)

A HTU

SOUTHJORDAN

S.

J.

C

AN

AL

U .S

.L .C

AN

AL

U .L

.D .C

AN

AL

W .J

. C

AN

AL

W

U-111

11400 S

10600 S

9800 S

10400 S

W

W

W

W

I-1

W . 13

W

OLD BINGHAM HWY 10200 S

BINGHAM CREEK

BA

N

G

ER

TE

R

H W

Y

M O

U N

TA

IN

V

IE

W C

O R

R

ID

O R

R

ED

W O

O D

R O

AD

JO

R

D

AN

R

IV

ER

JO

R

D

AN

G

AT

EW

AY

PR

O

SP

ER

IT

Y

R D

11800 S

10000 S

No. 173076-2202

BRAD

KLAVANOPR

OF

ES

S IONAL ENG INEER

* STAT E OF UTAH

MIDAS CREEK

G R

AN

D

VI

LL

E

AV

E

S JO

RDAN PKWY

LAKE AVE

DAYBREAK PKWY

U -1

BA

C C

H U

S H

W Y

KANE

SAN JUAN

GARFIELD

WAYNE

PIUTEBEAVER

IRON

WASHINGTON

MILLARD

SEVIER

EMERY GRAND

JUAB

UTAH

CARBON

SANPETE

TOOELE

BOX ELDER

SALT

LAKE

WASATCH DUCHESNE

UINTAH

DAGGETTSUMMIT

DAVIS

MORGAN

WEBER

RICHCACHE PROJECT LOCATION

SOUTH JORDAN CITY

SC-01 SURVEY CONTROL

CS-01 TYPICAL CROSS-SECTION

DM-01 DEMOLITION PLAN

WL-01 WATERLINE PLAN AND PROFILE STA: 10+00 - 11+35

WD-01 WATERLINE CONNECTION DETAILS

CD-01 - 02 CULINARY DETAILS

SD-01 STORM DRAIN SOUTH SECTION

WL-02 WATERLINE PLAN AND PROFILE STA: 11+35 - 13+16

SD-02 STORM DRAIN NORTH SECTION

SP-01 SITE AND GRADING PLAN

SL-01 STREET LIGHTING PLAN

SLD-1 - 3 STREET LIGHT DETAILS

LS-01 PARK STRIP LANDSCAPE AND IRRIGATION PLAN

LS-03 IRRIGATION DETAILS

ST-01 SIGNING AND STRIPING PLAN

SSD-2 - 3 SLIP BASE DETAILS

SSD-1 SIGN POST DETAIL

LS-02 ROCK MULCH LANDSCAPE PLAN

BID ALTERNATIVE-B 10000 SOUTH RAILROAD CROSSING

MILL OVERLAY AND STRIPING

BID SCHEDULE-A

BID ALTERNATIVE

SCHEDULE-B

OV-01 10000 SOUTH RAILROAD CROSSING

BID ALTERNATIVE-B

10000 S RAILROAD CROSSING

(APPROX 380 WEST 10000 SOUTH)

MILL OVERLAY AND STRIPING PLAN

Brad Klavano (Feb 27, 2026 10:15:08 MST) Brad Klavano

02/27/2026 https://secure.na2.echosign.com/verifier?tx=CBJCHBCAABAAb_Foc6zYv_7kDSTpW3iyK2TB0B0FD2oQ

CHAPTER 1

STANDARD NOTES

(Updated 3-19-24)

The South Jordan City Standard Notes are required to be included as part of all construction plans for residential or commercial development. Plans submitted by public or private entities for all other types of projects within City right-of-way, its easements or property shall reference the South Jordan City Standard Notes and Specifications.

1.1 South Jordan City General Notes

1. All work done or improvements installed within South Jordan City including but not limited to excavation, construction, roadwork and utilities shall conform to the South Jordan City Construction Standards and Specifications, City Municipal Code, the latest edition of the APWA Manual of Standard Specifications and Manual of Standard Plans, the latest edition of the Manual on Uniform Traffic Control Devices (MUTCD) and any state or federal regulations and permit requirements of various governing bodies. The contractor is responsible to have a copy of these specifications and to know and conform to the appropriate codes, regulations, drawings, standards and specifications.

2. The existence and location of any overhead or underground utility lines, pipes, or structures shown on these plans are obtained by a research of the available records. Existing utilities are located on plans only for the convenience of the Contractor. The contractor shall bear full responsibility for the protection of utilities and the engineer bears no responsibility for utilities not shown on the plans or not in the location shown on the plans. This includes all service laterals of any kind.

The Contractor shall, at his own expense, locate all underground and overhead interferences, which may affect his operation during construction and shall take all necessary precautions to avoid damage to same. The Contractor shall use extreme caution when working near overhead utilities so as to safely protect all personnel and equipment, and shall be responsible for all cost and liability in connection therewith.

3. The Contractor shall take all precautionary measures necessary to protect existing utility lines, structures, survey monuments and street improvements which are to remain in place, from damage, and all such improvements or structures damaged by the Contractor's operations shall be repaired or replaced satisfactory to the City Engineer and owning utility company at the expense of the Contractor.

4. All construction shall be as shown on these plans, any revisions shall have the prior written approval of the City Engineer.

5. Permits are required for any work in the public way. The Contractor shall secure all permits and inspections required for this construction.

6. Curb, gutter, and sidewalk, found to be unacceptable per City Standards and APWA shall be removed and replaced.

7. Contractor shall provide all necessary horizontal and vertical transitions between new construction and existing surfaces to provide for proper drainage and for ingress and egress to new construction. The extent of transitions to be as shown on plans.

8. Any survey monuments disturbed shall be replaced and adjusted per Salt Lake County Surveyors requirements.

9. All privacy walls, new or existing, are only shown on civil plans for the purpose of reviewing grading relationships; flood control and sight distance at intersections. All walls shall have a minimum 2 ft x 2 ft x 30 inch deep spot footings. Bottom of all footings on all walls shall be a minimum of 30 inches below finished grade. Walls greater than 6 feet require a separate permit and inspection by the Building Department.

10. All construction materials per APWA must be submitted and approved by the City Engineer prior to the placement of asphalt within City Right of Way.

11. Request for inspection by the City of South Jordan engineering dept. shall be made by the contractor at least 48 hours before the inspection services will be required, except in an emergency as defined by the South Jordan City Municipal Code § 12.08.010.

12. Work in public way, once begun, shall be prosecuted to completion without delay as to provide minimum inconvenience to adjacent property owners and to the traveling public.

13. The contractor shall take all necessary and proper precautions to protect adjacent properties from any and all damage that may occur from storm water runoff and/or deposition of debris resulting from any and all work in connection with construction.

14. Power poles and/or other existing facilities not in proper location based on proposed improvements shown hereon will be relocated at no expense to the City of South Jordan. Power lines and all other aerial utilities are to be buried and poles removed as determined by the City Engineer.

15. Curb and gutter with a grade of less than four-tenths of one percent shall be constructed by forming. Each joint shall be checked for a grade prior to construction and water tested as soon as possible after construction.

16. Contractor to follow Salt Lake County Noise Ordinance Standards.

17. Contractors are responsible for all OSHA requirements on the project site.

18. A UPDES (Utah Pollutant Discharge Elimination System) permit is required for all construction activities as per state law as well as providing a Storm Water Pollution Prevention Plan to the City.

19. Developer is responsible for locating and repairing all underground streetlight wires, water lines, storm drain lines and irrigation lines until 90% of the bond has been released.

20. All City maintained utilities including; waterline, fire hydrants, streetlight wiring, and storm drain must be in public right of way or in recorded easements.

21. Contractor shall work South Jordan City regular working hours of Monday through Friday 7:00 am to 4:00 pm. If Contractor permits overtime work or work on a Saturday, Sunday or any legal holiday, Contractor shall receive prior approval by City Engineer. Contractor shall obtain all permits and pay Overtime Inspection Fee’s to The City of South Jordan on the Thursday prior to the Saturday, Sunday or legal holiday requested. This applies to all work within the public right of way including traffic control and access..

22. Prior to 90% bond release, a legible as-built drawing must be submitted to the City of South Jordan stamped and signed by a professional engineer. As-builts must show all changes and actual field locations of storm drainage, waterlines, irrigation, street lighting, and power. As-builts will be held to the same standard as approved design drawings, no “redlined plans” allowed. In the absence of changes, copies of the approved drawings will be required stating “installed as per drawings”. As-built drawings for new developments shall be submitted to the City in the following formats and quantities prior to the 90% bond release: 1 .dxf copy, 1 .pdf copy.

23. Filter fabric wrapped around an inlet grate is not an acceptable inlet sediment barrier. See Chapter 9 of South Jordan City Construction Standards and Specifications for details of approved storm water BMPs.

24. Asphalt paving between October 15 and April 15 is not allowed without a written exception from the Engineering Department.

25. To ensure proper planting, protection and irrigation of trees, mitigating risk of tree failure or future damage to infrastructure, contractors are required to follow the standards and specifications of the ISA - International Society of

Arboriculture.

26. All small cell construction must follow the South Jordan Small Cell Infrastructure Design Guidelines.

27. All construction of Low Impact Development (LID) must follow the South Jordan City Low Impact Development Handbook 2020. With the development of any residential subdivision that proposes LID in public park strips, the developer must construct/install such to completeness, including but not limited to vegetation and landscape irrigation. The developer is responsible to maintain the LID (including landscape) until such time the developer connects any LID landscape irrigation to owner’s irrigation of the respective building lot.

Developer’s LID maintenance responsibilities include but not limited to cleaning, repairing, protecting and clear of any debris. The building lot owner shall maintain in perpetuity any LID constructed anywhere on the building lot, including the park strip area within public right of way.

28. When a proposed development borders a collector, minor collector or arterial street and is required to construct collector street fencing along the back of sidewalk, the development shall also be required put in a concrete mow strip from the back of sidewalk to underneath the fence panels. Concrete mow strips shall also be required between the sidewalk and fencing along the rear of double frontage lots

29. One-way valves are required on residential land drain lines that go from a foundation drain on a home to a public storm drain system.

1.2 City of South Jordan Traffic Notes

1. When a designated “Safe Route To School” is encroached upon by a construction work zone the safe route shall be maintained in a manner acceptable to South Jordan City and the Jordan School District.

2. If the improvements necessitate the obliteration, temporary obstruction, temporary removal or relocation of any existing traffic pavement marking, such pavement marking shall be restored or replaced with like materials to the satisfaction of the City Engineer, Public Works Director or designee.

3. The street Sign Contractor shall obtain street names and block numbering from the Planning Department prior to construction.

4. The Contractor shall be responsible for providing and installing all permanent signs shown on the plans. Street name signs shall conform in their entirety to current City Standards. All other signs shall be standard size unless otherwise specified on the plans. All sign posts shall be installed in accordance with the current City Standards.

5. All permanent traffic control devices called for hereon shall be in place and in final position prior to allowing any public traffic onto the portions of the road(s) being improved hereunder, regardless of the status of completion of paving or other off-site improvements called for per approved construction drawings unless approved by the City Engineer.

6. The Contractor shall be responsible for notifying Utah Transit Authority (UTA) if the construction interrupts or relocates a bus stop or has an adverse effect on bus service on that street to arrange for temporary relocation of stop.

1.3 City of South Jordan Street Light Notes

All work shall be installed in accordance with the most current South Jordan City Standards and N.E.C. (National Electric Code). A street light plan showing wiring location, wiring type, voltage, power source location, conduit size and location shall be submitted to the City of South Jordan and be approved prior to construction. No deviation of streetlight, pull boxes, conduits, etc. locations shall be permitted without prior WRITTEN APPROVAL from the City Engineer or his/her representative.

An electronic copy of the street light redlines, showing the same items listed above for the street light plan, shall be submitted to the South Jordan City Engineering Department after the street lights have been installed but prior to them being connected by Rocky Mountain Power.

1. Location of the Street light pole.

a. Shall not be installed within 5 feet of a fire hydrant. The location shall be such that it does not hinder the operation of the fire hydrant and water line operation valves.

b. Shall be a minimum of 5 feet from any tree, unless written approval is received from the City Engineer. Branches may need to be pruned as determined by the Engineering Inspector in the field at the time of installation.

c. Shall not be installed within 5 feet from the edge of any driveway.

7. Before any work is started in the right-of-way, the contractor shall install all advance warning signs for the construction zone. The contractor shall install temporary stop signs at all new street encroachments into existing public streets.

All construction signing, barricading, and traffic delineation shall conform to the Manual of Uniform Traffic Control Devices (MUTCD) per the current edition adopted by UDOT and be approved by the City of South Jordan before construction begins.

8. All signs larger than 36” X 36” or 1296 square inches per sign pole shall be mounted on a Slip Base system per UDOT standard drawing SN 10B (detail drawing attached to standard drawings) with a “Z” bar backing. Signs of this size are not allowed to be mounted on a yielding pole.

9. Sign components such as sheeting, EC film, inks, letters and borders are all required to be from the same manufacturer. Only EC film may be used to achieve color. Vinyl EC film is not accepted.

10. All new roundabouts, crosswalks, stop bars and legends shall be installed with 90 mil preformed thermo plastic.

11. Stop Lines are required anytime a stop sign is installed.

12. Paving asphalt binder grade shall be PG 58-28 unless otherwise approved by the City Engineer. Asphalt aggregate size shall be ½ inch for residential and collector roads. No more than 15% RAP (reclaimed asphalt pavement) by weight will be allowed in the asphalt mix design for the paving of public and private streets. Up to the 15 percent will be allowed with no change in the specific binder grade. The asphalt mix design shall have no more than 3½ % air voids.

13. Potholing: All potholes must be saw cut square and have a minimum size of 1 square foot. When repairing a pothole, sand or pea gravel meeting South Jordan City standards shall be placed over the exposed utility to a depth of 6 inches. Following the pea gravel will be flowable fill up to 1 inch below the bottom edge of the existing asphalt. The remaining portion of the hole shall be filled with asphalt, which will have an overall thickness of the existing asphalt plus 1 inch.

14. All fill within the public right of way shall be A-1-A to A-3, with the exception of top soil in the park strip for landscaping and trench backfill. Trench backfill material under pavements or surface improvements shall be clean, nonclumping, granular and flowable, 2” minus, A-1-a to A-2-7 soils according to AASHTO 145 soil Classification System. Lime treated flowable fills, if approved, shall have a 28-day strength of 65 PSI.

15. All traffic road closures involving 1 or more lanes of traffic must receive prior approval from the City Engineer or his/her representative. VMS PCMS boards must be placed a minimum of 7 days in advance of any lane closure on collector,minor collector or arterial street. VMS PCMS boards must also be placed in advance of any lane closures on a subdivision street per the City Engineer’s direction.

16. Roundabouts, including their ingress and egress, shall be constructed with concrete pavement. Engineer shall design cross section and submit to the City for review and approval.

17. Alleyways and Lanes are to have 6 feet maximum spacing for control joints in straight sections and are to have an expansion joint every 60 feet and at all pc's and pt's.

18. Construction of any public street requires a sign off checklist prior to the road being opened to traffic for use by the general public. The checklist must be requested by the Developer. The City's assigned project engineer will prepare the checklist and provide it to the Developer/Contractor.

19. Trees are not allowed to be planted with 30' of a stop sign.

20. Traffic signal poles, mast arms and luminaire extensions must be black powder coated.

2. Anti-seize lubricant shall be used on all cover bolts and ground box bolts.

3. All existing street lighting shall remain operational during construction.

4. Any structure such as block walls, chain link fences, retaining walls, etc. shall leave a minimum of eighteen (18) inches to the face of the street light pole on all sides.

5. All service point(s) shall be coordinated with Rocky Mountain Power and whenever possible be located near the center of the circuit. Service point(s) shall be shown on the plans with a schematic from Rocky Mountain Power. Pole locations as shown on the approved plans may be adjusted in the field by the Engineering Inspector at time of installation at no additional cost to the City.

6. It shall be required that in the absence of an existing workable circuit to attach to, that all installations shall require a new service for operation of the circuits in this case developer and or his engineer shall contact Rocky Mountain Power.

7. Wherever there is an overhead utility that may conflict with the installation of the street light circuits and/or streetlight poles, those conflicts must be resolved between the developer and the utilities involved before the street light bases are constructed at no expense to the City of South Jordan or Rocky Mountain Power. The resolution must be approved by the City of South Jordan and Rocky Mountain Power.

8. The contractor shall furnish a complete service to the transformers and control systems if required on the plans and/or is deemed necessary by Rocky Mountain Power and/or South Jordan City.

9. A street light plan showing wiring location, wiring type, voltage, power source location, conduit size and location shall be submitted to the City of South Jordan and be approved prior to construction.

10. The contractor shall be required to perform a 10 day burn test of the street lights after they are connected and energized by Rocky Mountain Power. This test shall be coordinated and witnessed by a South Jordan Engineering Inspector.

11. Each streetlight pole shall have its own photo cell independent of a master control. On double head fixtures a single photo cell shall be installed on the north most facing head and be wired to energize both heads.

1.4 City of South Jordan Grading Notes

1. In the event that any unforeseen conditions not covered by these notes are encountered during grading operations, the Owner and City Engineer shall be immediately notified for direction.

2. It shall be the responsibility of the Contractor to perform all necessary cuts and fills within the limits of this project and the related off-site work, so as to generate the desired subgrade, finish grades and slopes shown.

3. Contractor shall take full responsibility for all excavation. Adequate shoring shall be designed and provided by the Contractor to prevent undermining of any adjacent features or facilities and/or caving of the excavation.

4. The Contractor is warned that an earthwork balance was not necessarily the intent of this project. Any additional material required or leftover material following earthwork operations becomes the responsibility of the Contractor.

5. Contractor shall grade to the lines and elevations shown on the plans within the following horizontal and vertical tolerances and degrees of compaction, in the areas indicated:

Horizontal Vertical Compaction

a. Pavement Area Subgrade 0.1'+ +0.0' to -0.1' See soils Report

b. Engineered Fill 0.5'+ +0.1' to -0.1' See Soils Report

Compaction Testing will be performed by the developer or his representative.

6. All cut and fill slopes shall be protected until effective erosion control has been established.

7. The use of potable water without a special permit for building or construction purposes including consolidation of backfill or dust control is prohibited. The Contractor shall obtain all necessary permits for construction water from the Public Works Department.

8. The Contractor shall maintain the streets, sidewalks and all other public right-of-way in a clean, safe and usable condition. All spills of soil, rock or construction debris shall be promptly removed from the publicly owned property during construction and upon completion of the project. All adjacent property, private or public shall be maintained in a clean, safe and usable condition.

9. In the event that any temporary construction item is required that is not shown on these drawings, the Developer agrees to provide and install such item at his own expense and at the direction of the City Engineer. Temporary construction includes ditches, berms, road signs and barricades, etc.

10. All grading work shall conform to the soils report as prepared by the Soils Engineer and approved by the City Engineer, and as shown on these plans.

C he ck ed

B y:

D at e:

D es ig ne d By

D ra w n

By

N O

D

AT

E

R

EV

IS

IO

N C

O M

M

EN

TS

W es t T ow ne C en te r D r.

/ S ou th J or da n, U

T

Te le ph on e:

(8

) 2

-3

/ W eb

: W W

W .S

JC

.U

TA

H

.G O

V

A H

T U

SO

U T H

JO

R D A N

F:

\E

N G

IN

EE

R

IN

G \C

IP

P ro je ct

\T ow n M ea do w s

C t R oa d

Sh ar in g w M er it

M ed

\C

AD

\S ta nd ar d N ot es

-1

9-

.d w g

2/

/2

S-01

JW

H JW

H

SO

U

TH

J

O R

D

AN

C

IT

Y T

O W

N M

EA

D

O W

S C

O U

R T

IM

PR

O

VE

M

EN

TS

ST

AN

D

AR

D

N O

TE

S

No. 173076-2202

BRAD

KLAVANOPR

O

FE

SS IONAL ENG I NEER

* STA T E OF UTAH

Brad Klavano (Feb 27, 2026 10:15:08 MST) Brad Klavano

1.6 South Jordan City Water Notes

1. The following South Jordan City Water Notes are intended for general water standards only and are not all inclusive. The City has included the Culinary Water Design and Construction Standards within the City Construction Standards and Specifications.

2. No work shall begin until the water plans have been released for construction by the Engineering Department. Following water plan approval, forty-eight (48) hour notice shall be given to the Engineering Inspector and the Public Works Department (801-253- 5230) prior to the start of construction. Notice must be given by 2:00 P.M.

the business day prior to an inspection.

3. All work within South Jordan City shall conform to South Jordan City Standards and Specifications, AWWA and APWA.

4. For Residential Developments - The developer shall purchase and install meter boxes and setters according to City Standards on newly developed lots and real property at the time of water main installation. Water meters will be supplied and installed by the South Jordan Public Works Department (at Developer's expense).

The developer shall also provide the site address, lot number, meter size and pay meter fees prior to building permit approval.

5. For Commercial and Condominium Developments - The developer shall purchase and install meter boxes and setters according to City Standards. Water meters will be supplied by South Jordan Public Works Department (at Developer's expense) and installed by Developer.

6. All water facilities shall be filled, disinfected, pressure tested, flushed, filled and an acceptable water sample obtained prior to commissioning the new water line to the South Jordan City Culinary Water Distribution System.

7. South Jordan Public Works Department must approve water shut down which may require evening and weekend shut down as deemed necessary, requiring the contractor to be billed for overtime. 48 hour notice is required.

8. Water stub-out installations will not be construed as a commitment for water service.

9. Conditional Approval of Valved Outlet (6” and Larger):

In the event the water plans show one or more valved outlets extending out of paved areas, installations of these outlets is acceptable, however, if the outlets are incorrectly located or not used for any reason when the property is developed, the developer shall abandon the outlets at the connection to the active main in accordance with the city standards and at the developer's expense.

10. All lines to be pressure tested according to South Jordan City and AWWA standards and chlorinated prior to use and final acceptance.

11. All fittings to be coated with poly fm grease and wrapped with 8-mil thick polyethylene.

12. No other utility lines may be placed in the same trench with water line unless approved by the City Engineer.

13. Any conflict with existing utilities shall be immediately called to the attention of the City Engineer or designee.

14. All water vaults will be constructed per City of South Jordan standard drawings and specifications. No vaults are allowed in traffic areas without prior approval of the City Engineer.

15. Landscaping and irrigation adjacent to vaults shall drain away from vaults.

16. Once the waterline has been tested, approved and city water is flowing through the pipe, only City personnel are authorized to shut down and charge the waterline.

17. Megalug following ring or an approved equivalent shall be used on all fittings.

18. APWA plan 562, City requires stainless steel tie-down restraints with turnbuckles only. 5/8” rebar is not acceptable. Megalug followers required on all fittings and all dimensions of thrust blocking still apply. Thrust blocks may be eliminated if horizontal tie down restraints have been pre-engineered and receive prior City approval.

19. Water mains will be hot tapped as called out on the approved plans. Under special circumstances, when a contractor submits a request for a shutdown contrary to the approved plans and the request is approved at the discretion of the City Engineer or designee, the contractor must provide 48-hour notice to neighbors and those affected. If businesses are impacted by the shutdown it will be done after hours and all overtime fees for City personnel, equipment and vehicles must be paid in advance.

20. Contractors are required to write the lot number with a black permanent marker on the inside of the water meter barrels as they are installed.

GENERAL PROJECT NOTES

1. THE CONTRACTOR SHALL MEET ALL UTAH STATE DEPARTMENT OF

ENVIRONMENTAL QUALITY AND U.S. EPA REQUIREMENTS THE

CONTRACTOR SHALL MEET ALL UTAH STATE DEPARTMENT OF

ENVIRONMENTAL QUALITY AND U.S. EPA REQUIREMENTS WITH RESPECT

TO THEIR RULES AND REGULATIONS FOR DRINKING WATER SYSTEMS.

2. STATIONING, CURVE DATA, AND STRAIGHT SECTIONS AS LISTED ARE GRID

DISTANCES. HORIZONTAL AND VERTICAL CONTROL STATIONING, CURVE

DATA, AND STRAIGHT SECTIONS AS LISTED ARE GRID DISTANCES.

HORIZONTAL AND VERTICAL CONTROL IS BASED ON NAD 83, STATE PLANE,

UTAH CENTRAL COORDINATE SYSTEM. SEE SHEET G-4 FOR SURVEY

CONTROL DATA.

3. CONSTRUCTION OPERATIONS SHALL BE CONDUCTED, AND SIGNS,

BARRICADES, AND FLASHERS SHALL BE PLACED; SO AS CONSTRUCTION

OPERATIONS SHALL BE CONDUCTED, AND SIGNS, BARRICADES, AND

FLASHERS SHALL BE PLACED; SO AS TO COMPLY WITH OSHA, UTAH STATE

INDUSTRIAL COMMISSION, LOCAL SAFETY STANDARDS, AND MANUAL ON

UNIFORM TRAFFIC CONTROL.

4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL

UNDERGROUND UTILITIES, INCLUDING WATERLINES, THE CONTRACTOR

SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES,

INCLUDING WATERLINES, IRRIGATION DRAIN LINES, TELEPHONE CABLES,

GAS LINES, AND ANY OTHER OBSTRUCTION DURING THE COURSE OF

CONSTRUCTION AND INSTALLATION OF THE PIPELINES.

5. THE CONTRACTOR SHALL BE RESPONSIBLE TO OBTAIN RIGHTS OF INGRESS

AND EGRESS SHOULD HE VENTURE ONTO THE CONTRACTOR SHALL BE

RESPONSIBLE TO OBTAIN RIGHTS OF INGRESS AND EGRESS SHOULD HE

VENTURE ONTO PRIVATE PROPERTY WHICH IS NOT INCLUDED IN UDOT OR

OWNER ACQUIRED RIGHTS-OF-WAY AND EASEMENTS.

6. UNLESS DETAILED, SPECIFIED OR INDICATED OTHERWISE, CONSTRUCTION

SHALL BE AS INDICATED IN THE APPLICABLE UNLESS DETAILED, SPECIFIED

OR INDICATED OTHERWISE, CONSTRUCTION SHALL BE AS INDICATED IN

THE APPLICABLE TYPICAL DETAILS AND GENERAL NOTES. TYPICAL DETAILS

ARE MEANT TO APPLY EVEN THOUGH NOT REFERENCED AT SPECIFIC

LOCATIONS OR IN SPECIFIC DRAWINGS.

7. THE CONTRACTOR SHALL BE RESPONSIBLE TO PROTECT ALL EXISTING

IMPROVEMENTS DURING CONSTRUCTION AND SHALL THE CONTRACTOR

SHALL BE RESPONSIBLE TO PROTECT ALL EXISTING IMPROVEMENTS

DURING CONSTRUCTION AND SHALL REPLACE OR RESTORE ANY

IMPROVEMENTS DAMAGED AS A RESULT OF THE CONSTRUCTION ACTIVITY

AS DIRECTED BY THE ENGINEER.

8. THIS PROJECT IS LOCATED WITHIN SOUTH JORDAN CITY LIMITS. THE

CONTRACTOR SHALL OBTAIN ALL APPLICABLE PERMITS THIS PROJECT IS

LOCATED WITHIN SOUTH JORDAN CITY LIMITS. THE CONTRACTOR SHALL

OBTAIN ALL APPLICABLE PERMITS AND APPROVALS FROM THE APPLICABLE

AGENCY AND SHALL COMPLY WITH THE GOVERNING AGENCY

REGULATIONS FOR TRAFFIC CONTROL, SAFETY, EXCAVATION & BACKFILL IN

CITY RIGHTS OF WAY, ETC.

9. THE CONTRACTOR SHALL OBTAIN NOTICE OF INTENT, PREPARE STORM

WATER POLLUTION PREVENTION PLAN, AND COMPLY THE CONTRACTOR

SHALL OBTAIN NOTICE OF INTENT, PREPARE STORM WATER POLLUTION

PREVENTION PLAN, AND COMPLY WITH ALL UPDES REQUIREMENTS.

10. THESE DRAWINGS MAY REFERENCE THE APWA STANDARD 2017

SPECIFICATIONS AND PLANS AS PUBLISHED BY UTAH T2 THESE DRAWINGS

MAY REFERENCE THE APWA STANDARD 2017 SPECIFICATIONS AND PLANS

AS PUBLISHED BY UTAH T2 CENTER AND SOUTH JORDAN CITY STANDARDS

WHICH ARE INCORPORATED HEREIN BY REFERENCE.

PROJECT WATER PIPELINE NOTES:

1. CONTACT SOUTH JORDAN CITY AT LEAST 72 HOURS IN ADVANCE OF ALL

WATER SHUTDOWNS. CONTACT SOUTH JORDAN CITY AT LEAST 72 HOURS

IN ADVANCE OF ALL WATER SHUTDOWNS.

2. ALL DUCTILE OR CAST IRON PIPE AND ALL COMPRESSION COUPLINGS,

MECHANICAL JOINTS, FLANGED ALL DUCTILE OR CAST IRON PIPE AND ALL

COMPRESSION COUPLINGS, MECHANICAL JOINTS, FLANGED JOINTS,

VALVES, HYDRANTS AND FITTINGS INCLUDING TEES, WYES, ELBOWS,

PLUGS, ETC. EXPOSED TO SOIL SHALL BE WRAPPED WITH 8 MIL THICK

POLYETHYLENE FILM TUBE. ALL FITTINGS, VALVES AND EXPOSED NUTS &

BOLTS SHALL BE LIBERALLY COATED WITH FM GREASE PRIOR TO

WRAPPING. THE FILM SHALL BE HELD IN PLACE BY 2-INCH WIDE PLASTIC

BACKED ADHESIVE TAPE EQUAL TO POLYKEN NO. 900 OR SCOTCHRAP NO.

50. THE TAPE SHALL BE INSTALLED TO TIGHTLY SECURE THE FILM TO THE

PIPE. ENOUGH FILM SHALL BE USED TO OVERLAP ADJOINING SECTIONS OF

FILM A MINIMUM OF ONE (1) FOOT.

3. VALVES SHALL BE WRAPPED BY BRINGING THE WRAP ON THE ADJACENT

PIPE OVER THE BELLS OR VALVES SHALL BE WRAPPED BY BRINGING THE

WRAP ON THE ADJACENT PIPE OVER THE BELLS OR FLANGES OF THE

VALVE AND SEALING WITH THE ADHESIVE TAPE. THE VALVE BODIES ARE

THEN WRAPPED WITH A FLAT SHEET OF THE FILM PASSED UNDER THE

VALVE BOTTOM AND BROUGHT UP AROUND THE BODY TO THE STEM AND

FASTENED IN PLACE WITH THE ADHESIVE TAPE.

4. ANY FITTINGS THAT REQUIRE CONCRETE BLOCKING SHOULD BE

COMPLETELY WRAPPED PRIOR TO THE ANY FITTINGS THAT REQUIRE

CONCRETE BLOCKING SHOULD BE COMPLETELY WRAPPED PRIOR TO THE

POURING OF THE CONCRETE THRUSTING BLOCK.

5. POLYETHYLENE WRAP SHALL BE PROTECTED FROM THE SUN AND

WEATHERING PRIOR TO USE. CARE POLYETHYLENE WRAP SHALL BE

PROTECTED FROM THE SUN AND WEATHERING PRIOR TO USE. CARE SHALL

BE EXERCISED DURING BACK FILLING OF THE PROTECTED AREAS TO

PREVENT PUNCTURING OF THE FILM.

6. MINIMUM COVER OVER TOP OF PIPE SHALL BE 4-FEET, UNLESS INDICATED

OTHERWISE. MINIMUM COVER OVER TOP OF PIPE SHALL BE 4-FEET, UNLESS

INDICATED OTHERWISE.

7. CONTRACTOR SHALL POT HOLE UTILITIES AT ALL CROSSINGS

SUFFICIENTLY IN ADVANCE OF LAYING PIPE TO ALLOW FOR ADJUSTMENTS

OF NEW PIPELINE GRADE TO AVOID CONFLICTS.

8. CONTRACTOR TO PROVIDE TEMPORARY BLOW OFF VALVES & FITTINGS TO

FLUSH & DISINFECT NEW PIPELINES. PROVIDE PLAN TO OWNER FOR

APPROVAL BEFORE BEGINNING CONSTRUCTION. TEMPORARY BLOWOFF &

FITTINGS SHALL BE REMOVED PRIOR TO PUTTING NEW LINE INTO SERVICE.

9. THE MINIMUM SLOPE OF THE WATERLINE SHALL BE 0.3% WITH NO LOCAL

HIGH POINTS EXCEPT AS INDICATED ON THE DRAWINGS.

10. DEFLECTIONS IN PIPE JOINTS SHALL NOT EXCEED 1.0 DEGREE FOR PVC

PIPE, OR MANUFACTURER'S DEFLECTIONS IN PIPE JOINTS SHALL NOT

EXCEED 1.0 DEGREE FOR PVC PIPE, OR MANUFACTURER'S PUBLISHED

DEFLECTIONS.

11. PROVIDE CONCRETE THRUST BLOCKS AND JOINT RESTRAINTS ON ALL

BENDS, FITTINGS, AND VALVES PROVIDE CONCRETE THRUST BLOCKS AND

JOINT RESTRAINTS ON ALL BENDS, FITTINGS, AND VALVES UNLESS

INDICATED OTHERWISE.

12. ELEVATIONS OF EXISTING WATERLINES ARE UNKNOWN. CONTRACTOR

SHALL POTHOLE EXISTING WATER ELEVATIONS OF EXISTING WATERLINES

ARE UNKNOWN. CONTRACTOR SHALL POTHOLE EXISTING WATER LINES A

MIN. OF 200' IN ADVANCE OF CONNECTIONS TO VERIFY LOCATION AND

ELEVATION. MODIFICATIONS TO CONNECTION DETAILS MAY BE REQUIRED,

BASED ON THE INFORMATION OBTAINED.

13. WHERE THE NEW WATERLINE CROSSES EITHER BELOW OR LESS THAN 18"

INCHES VERTICALLY ABOVE WHERE THE NEW WATERLINE CROSSES

EITHER BELOW OR LESS THAN 18" INCHES VERTICALLY ABOVE AN EXISTING

SEWER, THE NEW WATERLINE JOINTS SHALL BE SPACED EQUIDISTANT

FROM THE CROSSING TO HELP AVOID ANY POSSIBLE CONTAMINATION. IN

SUCH EVENT, CONTRACTOR SHALL NOTIFY ENGINEER SO THAT AN

EXCEPTION TO RULE CAN BE OBTAINED FROM DDW.

14. WHERE EXISTING TRANSITE PIPES ARE ENCOUNTERED DURING

CONSTRUCTION CONTRACTOR SHALL WHERE EXISTING TRANSITE PIPES

ARE ENCOUNTERED DURING CONSTRUCTION CONTRACTOR SHALL FOLLOW

ALL RULES AND REGULATIONS REGARDING THE HANDLING OF SUCH PIPE.

REFER TO THE DOCUMENT: DAQA-155-14 "HOW TO HANDLE NON-FRIABLE

ASBESTOS CEMENT PIPE"

15. WATER SERVICE REPLACEMENT (KEY NOTE 1 & 2 ON DRAWINGS) INCLUDES:

REPLACEMENT OF WATER SERVICE REPLACEMENT (KEY NOTE 1 & 2 ON

DRAWINGS) INCLUDES: REPLACEMENT OF COPPER OR GALVANIZED WATER

SERVICE PIPE; REMOVAL OF EXISTING METER BOX & SETTER;

INSTALLATION OF NEW SETTER, METER BOX, FRAME, COVER, & METER PER

SOUTH JORDAN CITY STANDARD DRAWINGS 3090, 3091, 3092, & 3095.

16. UPON REMOVAL, SALVAGE ALL APPURTENANCES TO SOUTH JORDAN CITY

(FIRE HYDRANTS, METER UPON REMOVAL, SALVAGE ALL APPURTENANCES

TO SOUTH JORDAN CITY (FIRE HYDRANTS, METER BOX, FRAME, COVER,

SETTER, ETC.).

17. ALL MATERIALS THAT MAY COME IN CONTACT WITH DRINKING WATER,

INCLUDING PIPES, GASKETS, ALL MATERIALS THAT MAY COME IN CONTACT

WITH DRINKING WATER, INCLUDING PIPES, GASKETS, LUBRICANTS AND

O-RINGS, SHALL BE ANSI-CERTIFIED AS MEETING THE REQUIREMENTS OF

ANSI/NSF STANDARD 61. DRINKING WATER SYSTEM COMPONENTS -

HEALTH EFFECTS. TO PERMIT FIELD-VERIFICATION OF THIS CERTIFICATION,

ALL COMPONENTS SHALL BE APPROPRIATELY STAMPED WITH NSF LOGO.

(RULE R309-550)

18. PIPE, JOINTS, FITTINGS, VALVES, AND FIRE HYDRANTS SHALL CONFORM TO

ANSI/NSF STANDARD 61, PIPE, JOINTS, FITTINGS, VALVES, AND FIRE

HYDRANTS SHALL CONFORM TO ANSI/NSF STANDARD 61, AND APPLICABLE

SECTIONS OF AWWA STANDARDS C104-A21.4-08 THGROUGH C550-05 AND

C900-07 THROUGH C950-07. (Rule R309-550)

No. 173076-2202

BRAD

KLAVANOPR

O

FE

SS IONAL ENGI NEER

* STA T E OF UTAH

C he ck ed

B y:

D at e:

D es ig ne d By

D ra w n

By

N O

D

AT

E

R

EV

IS

IO

N C

O M

M

EN

TS

W es t T ow ne C en te r D r.

/ S ou th J or da n, U

T

Te le ph on e:

(8

) 2

-3

/ W eb

: W W

W .S

JC

.U

TA

H

.G O

V

A H

T U

SO

U T H

JO

R D A N

F:

\E

N G

IN

EE

R

IN

G \C

IP

P ro je ct

\T ow n M ea do w s

C t R oa d

Sh ar in g w M er it

M ed

\C

AD

\S ta nd ar d N ot es

-1

9-

.d w g

2/

/2

S-02

JW

H JW

H

SO

U

TH

J

O R

D

AN

C

IT

Y T

O W

N M

EA

D

O W

S C

O U

R T

IM

PR

O

VE

M

EN

TS

W

AT

ER

LI

N

E N

O

TE

S

Brad Klavano (Feb 27, 2026 10:15:08 MST) Brad Klavano

CHAPTER 6

STORM DRAIN

(Updated 3-19-24)

SECTION 6.1

GENERAL

6.1.1 GENERAL

A. Storm Water Pollution Prevention Plan:

1. Shall be required for all construction activities as required under the Utah Pollutant Discharge and Elimination System (UPDES) permits and the following:

a) Construction sites with a land disturbance of greater than or equal to one acre, including projects less than one acre that are part of a larger common plan of development or sale.

b) Construction sites related to residential building that disturb a total of one acre or less of land.

c) Any construction activity the City Engineer or Designee deems to pose a unique threat to water quality, air quality, or public health or safety.

2. SWPPP shall be managed through the South Jordan City online storm water management system.

a) All BMP’s covering a storm drain inlet must contain an overflow feature for high volume rain/runoff events. Reference chapter 9 for acceptable inlet protection.

B. Storm Drain pipe in public right of way shall be minimum 18” RCP Class III or

HDPE.

1. Storm Drain lines shall be TV’ed by the contractors hired firm after placement and compaction of road base and prior to placing asphalt. This TV’ed disk shall be reviewed by the City designated Inspector. All areas found defective shall be repair to the satisfaction of the City Inspector before placing asphalt.

2. Storm drain caution tape shall be place and centered 1’ above the pipe.

3. Storm Drain lines will be TV’ed again, by City personnel prior to final bond release. All lines shall be cleaned by Developer prior to City performing the work. Any damaged pipe sections shall be repaired or replaced prior to final bond release.

C. Mirafi filter fabric may be required depending on the presence of groundwater, as determined by the City Engineer.

D. Manholes: Keep the manhole collar and cover down ¼” minimum and ½” maximum below finish asphalt grade. This will allow snowplows to pass over the top without hitting or damaging them, in the winter months.

Storm Drain manhole lid specifications: ASTM A 48-93, Class 35B Cast iron construction, machined flat bearing surface, removable lid with cleated surface and pick holes, H-20 highway load rating; lid molded with South Jordan City name and logo imprinted on lid; Provide Model A-1180 manufactured by D & L Supply., or acceptable equal. (See drawings section for detail.)

E. Developments must provide theft-resistant permanent installation of a City-approved storm drain marker at each storm water inlet. The marker item number is SD-SP, a stainless steel, painted blue, matte finish, embossed, fish symbol, optional serialization, 30 year warranty, with ¼” square hole made by Almetek Industries, Inc. Installation requires drive rivet and approved adhesive.

Lettering on the marker as appropriately follows:

“Only Rain in the Drain” markers installed anywhere storm water discharges to a retention or detention pond. (See drawings section for detail.)

F. A cleanout box with 24” silt trap is required before a private storm water system enters the City’s storm drain system. All private storm drainage conveyance systems shall also have a snout in place or an oil water separator system, approved by the City Engineer, before it discharges into the city system.

Facility’s that use large amounts of hydrocarbons such as gas stations, vehicle lube facilities, vehicle repair, and or paving facilities, shall be required to have a hydrodynamic separator in place prior to discharging into the city system, unless otherwise approved by the City Engineer or Public Works Director.

G. The first storm drain inlet box down gradient from a dumpster enclosure shall be required to have a snout and a 24” minimum silt trap, or larger as required by manufacturer recommendations for snout installation.

H. Silt traps are required for all catch basins, inlets, manholes etc. Silt traps shall be 12” deep, measured from invert of lowest pipe to bottom of box.

I. Boxes: During installation, grout boxes inside and out, and strip the forms from inside and outside of the boxes. Clean all dirt, rocks and debris from inside of the boxes. If using a pre-cast box, make sure to form a 6” collar around the outside of box with soil below pipe dug down and formed, and poured with concrete to engineering inspectors discretion. Before pouring concrete collar, contractor shall give engineering inspector 24-hour prior notice.

Inlet and combo boxes shall be precast or knockout boxes (unless otherwise approved by the City Engineer) and must accommodate an 18” x 48” frame and grate. Hooded grates are not allowed due to debris accumulating in the storm drain.

J. All onsite retention and detention basins shall be designed for a 100 year 24 hour storm event. The calculations and storm intensities used in the design must be submitted to the city for review and approval. Percolation rates are not allowed to be used in the capacity calculations for the storm water basins unless otherwise approved by the City Engineer. Retention basins shall be required to drain within 3 days of the storm event. Engineer shall provide a design that meets that criteria.

All calculations must be stamped and signed by a registered professional engineer.

K. For residential developments with underground storm water storage systems, storm drain calculations will not be allowed to include the void space in the gravel towards the total storage volume capacity. For commercial developments with underground storm water storage systems, storm drain calculations will not be allowed to include the void space in the gravel towards the total storage volume capacity unless approved by the City Engineer on a case by case basis. Projects allowed to count the gravel void space will need to show an acceptable overflow path for the storm water, in case the underground storage were ever to over top.

In addition, the storm water drainage system will require an approved separator unit to filter out sediment, oils and debris from the storm water prior to it entering the underground storm water storage chambers.

SECTION 6.2

REINFORCED CONCRETE PIPE

6.2.1 DESCRIPTION

This item shall govern for the furnishing and installing of reinforced concrete pipe and materials for construction.

6.2.2 MATERIALS

A. Pipe Type:

Shall be minimum 18”, RCP Class III.

B. Bedding and Backfill (RCP):

A City specified material (A-1-a to A-2-7 under AASHTO Soil Classification system) will be used for trench backfill. Place 1”minus gravel 6 inches under pipe and up to spring line (no squeegee or chips). Tamp underneath the haunches to prevent settlement. Compaction of 96% modified proctor is required.

SECTION 6.3

POLYPROPYLENE PIPE

6.3.1 DESCRIPTION

This item shall govern for the furnishing and installing of all Polypropylene Pipe, materials for construction and all related connections and fittings.

6.3.2 MATERIALS

Unless otherwise specified on the plans, pipe and joint fittings shall conform to the following:

A. Eighteen through 60-inch (460 through 1500 mm) pipe shall be smooth interior and annular exterior corrugated polypropylene (PP) pipe meeting the requirements of ASTM F2881 or AASHTO M330, Type S, for respective diameters. The pipe supplied shall be watertight as defined in the joint performance requirements of this specification.

B. Virgin material for 18 through 60-inch pipe and fitting production shall be an impact modified copolymer meeting the material requirements of ASTM F2881 and AASHTO M330, for respective pipe diameters.

C. Joints shall be installed in accordance with manufacturer’s installation instructions. All Bell-and-Spigot pipe joints shall be thoroughly cleaned. Joint lubricant, supplied by the manufacturer, shall be liberally applied to entire interior of bell and gasket on spigot prior to assembly. Watertight joints shall be bell-and-spigot meeting the watertight requirements of ASTM F2881. Gaskets shall be made of polyisoprene meeting the requirements of ASTM F477. Gaskets shall be installed by the pipe manufacturer and covered with a removable wrap to ensure the gasket is free from debris. A joint lubricant supplied by the manufacturer shall be used on the gasket and bell during assembly.

D. Fittings shall conform to ASTM F2881, with the exception of meeting the watertight joint performance requirements of ASTM D3212. Bell & spigot connections shall utilize a spun-on, welded or integral bell and spigot with gaskets meeting ASTM F477.

6.3.3 INSTALLATION

Installation shall be in accordance with the product manufacturer’s published installation guides and these instructions.

A. All pipe and fittings shall be delivered to the site and unloaded with handling that conforms to the manufacturer’s instructions for reasonable care. Pipe shall not be rolled or dragged over gravel or rock during handling. The Contractor shall take necessary precautions to ensure the method used in lifting or placing the pipe does not induce undue stress fatigue in the pipe.

B. Bedding and Backfill:

Bedding shall be gravel or compacted road base as per South Jordan City standards. A stable and uniform bedding shall be provided for the pipe and any protruding features of its joint and/or fittings. The middle of the bedding, equal to one-third of the pipe outside diameter, shall be loosely placed while the remainder shall be compacted to a minimum of 96% of maximum density per AASHTO T99, or as shown in the plans. Pipe bedding shall be a minimum of 4” – 6” in thickness. The bedding surface for the pipe shall provide a firm foundation of uniform density throughout the entire length of the pipe. Backfill shall be placed in layers of 8” loose lift thickness and brought up evenly and simultaneously on both sides of the pipe to an elevation not less than one foot (1’) above the top of the pipe. Each layer shall be thoroughly compacted; backfill shall be compacted to a minimum compaction level of 96% Density (Modified Proctor).

C. Trench Widths - Where trench walls are stable or supported, provide a width sufficient, but no greater than necessary, to ensure working room to properly and safely place and compact haunching and other embedment materials. The space between the pipe and trench wall must be wider than the compaction equipment used in the pipe zone. Minimum width shall be not less than the greater of either the pipe outside diameter plus 16 in. or the pipe outside diameter times 1.25, plus 12 in. In addition to safety considerations, trench width in unsupported, unstable soils will depend on the size and stiffness of the pipe, stiffness of the embedment and in-situ soil, and depth of cover.

D. Dewatering - Do not lay or embed pipe fittings or drainage structures in standing or running water. At all times prevent runoff and surface water from entering the trench. When water is present in the work area, dewater to maintain stability of in-situ and imported materials. Maintain water level below pipe bedding and foundation to provide a stable trench bottom. Use, as appropriate, sump pumps, well points, deep wells, geofabrics, perforated underdrains, or stone blankets of sufficient thickness to remove and control water in the trench. When excavating while depressing ground water, ensure the ground water is below the bottom of cut at all times to prevent washout from behind sheeting or sloughing of exposed trench walls. Maintain control of water in the trench before, during, and after pipe system installation and until embedment is installed and sufficient backfill has been placed to prevent flotation of the pipe, fitting, or drainage structures. To preclude loss of soil support, employ dewatering methods that minimize removal of fines and the creation of voids in in-situ materials.

No. 173076-2202

BRAD

KLAVANOPR

O

FE

SS IONAL ENGI NEER

* STA T E OF UTAH

C he ck ed

B y:

D at e:

D es ig ne d By

D ra w n

By

N O

D

AT

E

R

EV

IS

IO

N C

O M

M

EN

TS

W es t T ow ne C en te r D r.

/ S ou th J or da n, U

T

Te le ph on e:

(8

) 2

-3

/ W eb

: W W

W .S

JC

.U

TA

H

.G O

V

A H

T U

SO

U T H

JO

R D A N

F:

\E

N G

IN

EE

R

IN

G \C

IP

P ro je ct

\T ow n M ea do w s

C t R oa d

Sh ar in g w M er it

M ed

\C

AD

\S ta nd ar d N ot es

-1

9-

.d w g

2/

/2

S-03

JW

H JW

H

SO

U

TH

J

O R

D

AN

C

IT

Y T

O W

N M

EA

D

O W

S C

O U

R T

IM

PR

O

VE

M

EN

TS

ST

O R

M D

R

AI

N N

O

TE

S

Brad Klavano (Feb 27, 2026 10:15:08 MST) Brad Klavano

ABBREVIATION LIST

SIGN

CONIFEROUS TREE

BUSH

DECIDUOUS TREE

CABLE TV RISER

GUY WIRE ANCHOR

POWER OR UTILITY POLE

STREET LIGHT POLE

WATER METER

FIRE HYDRANT

GAS METER

WATER VALVE

GAS VALVE

MAILBOX

WATER MANHOLE

TELEPHONE MANHOLE

STORM DRAIN MANHOLE

SANITARY SEWER MANHOLE

SET PROPERTY CORNER

FOUND PROPERTY CORNER

POST / BOLLARD

GAS MANHOLE

ELECTRICAL MANHOLE

HEDGE / TREE LINE

CATCH BASIN

ELECTRICAL BOX

GAS

G

CONTROL POINT

SECTION CORNER

BENCHMARK OR STREET MONUMENT

SYMBOLS

DYH

IRRIGATION VALVE

IRR

GAS

SANITARY SEWER

STORM DRAIN

WATER

TELEPHONE

IRRIGATION BOX

E

T

SD

SS

W

UTILITY LINETYPES EXISTING

UTILITY LINETYPES PROPOSED

SD COMBO BOX

GM

E

BURIED FIBER OPTIC

ELECTRIC TRANSFORMER

W

15 15

W

STORM DRAIN

WATER

SD

No. 173076-2202

BRAD

KLAVANOPR

O

FE

SS IONAL ENGI NEER

* STA T E OF UTAH

C he ck ed

B y:

D at e:

D es ig ne d By

D ra w n

By

N O

D

AT

E

R

EV

IS

IO

N C

O M

M

EN

TS

W es t T ow ne C en te r D r.

/ S ou th J or da n, U

T

Te le ph on e:

(8

) 2

-3

/ W eb

: W W

W .S

JC

.U

TA

H

.G O

V

A H

T U

SO

U T H

JO

R D A N

F:

\E

N G

IN

EE

R

IN

G \C

IP

P ro je ct

\T ow n M ea do w s

C t R oa d

Sh ar in g w M er it

M ed

\C

AD

\S ta nd ar d N ot es

-1

9-

.d w g

2/

/2

S-04

JW

H JW

H

SO

U

TH

J

O R

D

AN

C

IT

Y T

O W

N M

EA

D

O W

S C

O U

R T

IM

PR

O

VE

M

EN

TS

AB

BR

EV

IA

TI

O N

L

IS

T

AN

D L

EG

EN

D

AC ASPHALT CONCRETE

APWA AMERICAN PUBLIC WORKS ASSOCIATION

BOW BACK OF WALK

CB CATCH BASIN

C/E CONSTRUCTION EASEMENT

C&G CURB AND GUTTER

℄ CENTERLINE

CMP CORRUGATED METAL PIPE

CO CLEAN OUT

COM COMMUNICATION

CONC CONCRETE

CY CUBIC YARD

DIA DIAMETER

DIP DUCTILE IRON PIPE

DWG DRAWING

DWY DRIVEWAY

Eg EXISTING GROUND

ELEV ELEVATION

ELEC ELECTRICAL

EOC EDGE OF CONCRETE

EOP EDGE OF PAVEMENT

EX EXISTING

FG FINISH GROUND

FL FLOW LINE

FLG FLANGE

FNC FENCING

FT FOOT

GB GRADE BREAK

GND GROUND

HP HIGH POINT

HYD FIRE HYDRANT

ID INSIDE DIAMETER

IN INCH

INV INVERT

IRR IRRIGATION

L LENGTH

LF LINEAR FEET

LT LEFT TURN

MAX MAXIMUM

MH MANHOLE

MID MID POINT OF CURVE

MIN MINIMUM

MJ MECHANICAL JOINT

NTS NOT TO SCALE

OH OVERHEAD

PC POINT OF CURVATURE

POB POINT OF BEGINNING

PSI POUND PER SQUARE INCH

PP POWER POLE

⅊ PROPERTY LINE

PRC POINT OF REVERSE CURVE

PT POINT OF TANGENCY

PUE PUBLIC UTILITY EASEMENT

PVC…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .