Patterson Hall Fiber Art Studio Relocation - Construction Documents Summary

This is a comprehensive set of construction documents for the Patterson Hall Fiber Art Studio Relocation project at Slippery Rock University in Pennsylvania, prepared by R3A Architecture and Barton Associates, Inc. The project involves the conversion of an existing crime lab (Room 017) into a fiber arts studio with associated storage space (Room 017B) and mechanical facilities (Room 028), totaling approximately 3,263 square feet. The scope encompasses architectural, mechanical, electrical, and plumbing work including demolition of existing conditions, installation of new interior finishes (epoxy flooring, wall paint, plastic laminate casework), lighting fixture replacement, plumbing fixture relocation and installation, HVAC duct and piping modifications, and various equipment installations. The construction documents include detailed plans for ground floor layouts, reflected ceiling plans, wall and finish specifications, flooring finish plans, equipment schedules, plumbing systems, mechanical systems, and electrical systems. A pre-bid conference with site visit is scheduled for May 27, 2026, at 11:00 AM at the Maintenance Center Conference Room, with electronic bids due no later than 11:00 AM EST on June 18, 2026, through PennBid. The project is expected to be completed by August 15, 2026, with liquidated damages assessed at $250 per calendar day of delay.

The project will be executed through separate prime contracts with the General Contractor serving as the lead contractor, with estimated cost ranges of $120,000-$130,000 for general construction, $50,000-$60,000 for plumbing, and $30,000-$40,000 for electrical work. All contractors must comply with the Pennsylvania Prevailing Wage Act and provide performance and payment bonds at 100% of the awarded contract price, as well as meet requirements under the Public Works Employment Verification Act and Investment Activities in Iran restrictions. The project is funded through the State System of Higher Education and must adhere to the 2018 International Building Code and related standards. Bid evaluation will be based on the lowest combination of base bid and alternates that can be awarded within budgeted funds, with the university retaining the right to accept or reject any bids. Multiple construction alternates are included in the documents, covering lighting replacement, countertop materials, epoxy flooring extent, under-cabinet lighting, and stainless steel sink installations, allowing the university flexibility in scope and cost management within available funding.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .