This is a Scope of Work document from Morgan County School District in Utah for the interior remodel of an existing portable classroom to accommodate the Teen Center's needs. The project encompasses comprehensive renovations including demolition and replacement of stairs and landing to accommodate a future ramp installation, replacement of three exterior windows with vinyl low-e glass windows (U-factor of .32 or lower), replacement of the existing door with a storefront door matching the west entrance, construction of a matching awning, removal of carpet flooring and installation of luxury vinyl tile (LVT) flooring, construction of a storage area with new electrical outlets, construction of a shower room with ceramic tile and LVT flooring, and construction of a kitchen and laundry facility with owner-provided appliances. The project also requires lighting and switch adjustments, fire detection system modifications, and adjustment of electrical systems to code requirements. Bids are due on September 10, 2026, at 2:00 PM via the UP3-Bonfire platform, with an optional pre-bid conference and site visit scheduled for September 1, 2026, at 9:00 AM at 344 East Young Street, Morgan, Utah. Bid award and contract execution are targeted for September 14, 2026, with construction commencing by September 21, 2026, and completion required by December 21, 2026. Construction activities may occur during school hours despite adjoining classroom occupancy.
The solicitation does not specify pricing terms, set-asides, or funding amounts in the Scope of Work document. Questions regarding the project must be submitted by September 4, 2026, at 2:00 PM to smcmillan@morgansd.org. The issuing office and contract award authority is Morgan County School District, and the contract award will not be posted on the Division of Purchasing website; vendors must contact the designated individual or office for award notification.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3-A101- Main Floor Plan (1).pdf | ||
| 5-Award Memo (1).pdf | ||
| 7-Award Letter.docx | DOCX document | |
| 6-Bid Tabulation.xlsx | XLSX spreadsheet | |
| 4-Agency-Terms-and-Conditions-GS.docx | DOCX document | |
| 1-Morgan Rise Center Remodel IFB.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Invitation to bid Morgan Portable Interior Remodel Morgan County School District is seeking proposals to remodel space in an existing portable classroom to accommodate the Teen Center's needs.
Bids are due on Friday, September 10th at 2:00 PM and should be submitted via UP3.
Bid award and contract in place by September 14th, with construction to begin by September 21st and be completed by December 21st There will be an optional prebid conference/site visit on September 1st Notes to accompany preliminary floor plan:
1) Demo the existing stairs and landing and replace them with stairs and a landing to accommodate the addition of an owner-provided ramp to be installed in a later phase.
2) Replace 3 exterior windows with vinyl windows with low-e glass with U factor of .32 or lower
3) Replace the existing door with a storefront door to match the west entrance
4) Construct an awning to match the awning on the west entrance
5) Demo existing carpet flooring and replace it with LVT to match the existing space. Carpet can remain in the storage area if practical to transition to LVT.
6) Construct a wall to create a storage area on the east end. Adjust lighting as needed. Match the door to the other new office doors with a window in the building.
a. Add electrical outlets on the new wall as required by code
7) Construct a shower room per the plans
a. Continue the LVT into the shower room.
b. Accessible Shower to be constructed with ceramic tile
8) Construct kitchen and laundry facility per the plans. The owner will provide the laundry machine, refrigerator, and oven
a. Cabinets and countertop to approximately match break room in the same building
b. Include electrical for the appliances shown, and outlets as typical for a kitchen
9) Adjust lighting and switches to accommodate the shower and storage areas
10) Adjust the fire detection system to accommodate new rooms
11) There will be students in the adjoining classrooms, but construction activities can be done during school hours image1.png