2-MEMO Adendum 1.pdf

PDF 81 KB Posted

Attached to
Trailside Sidewalk Project State and local contract opportunity
Solicitation number
SCPW-06-26
Issued by
Utah

About this file

This is a Memorandum Addendum No. 1 issued by Summit County, Utah on July 17, 2026 for the Trailside Sidewalk Project RFP. The addendum modifies the contract documents by providing a corrected set of plans that includes previously omitted detail sheets 2.C and 2.D. All bidders are required to acknowledge this addendum by signing the document and submitting a signed copy with their bid proposal. Any proposal submitted without acknowledging the addendum will be rejected. Questions regarding the addendum should be directed to Jacob Harris, Project Engineer, at Jaharris@summitcountyutah.gov.

The Trailside Sidewalk Project consists of constructing a new ADA-compliant concrete sidewalk that includes excavation, aggregate base, curb and gutter modifications, driveway tie-ins, pedestrian ramps, drainage improvements, signing and striping, and all associated restoration work. No specific pricing information, set-asides, incumbents, funding amounts, or contract term details are provided in this addendum document.

View the file

Other files for this state and local contract opportunity

Other files attached to Trailside Sidewalk Project, newest first.
File Type Posted
1-PW-06-26 Trailside Sidewalk Specs.pdf PDF
3-Trailside Sidewalk 100% Plans.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MEMORANDUM

ADDENDUM No. 1

July 17, 2026

To: Trailside Sidewalk Project – RFP Applicants

From: Jacob Harris, Project Engineer

This Addendum is issued to modify the Contract Documents as follows:

1. The correct set of plans has been uploaded. This set includes the previously omitted detail sheets 2.C and 2.D.

You must acknowledge this Addendum by signing below and including a signed copy with your Bid

Proposal. Any proposal submitted without acknowledging the Addendum will be rejected.

If you have any questions, please contact me.

Jacob Harris