About this file
This document provides details on the measurement and payment for various line items in a federal contract opportunity for the installation of an individual septic system with a subsurface drip system drainfield on fee land in Mason County, WA.
The key details include the required products and services such as solid sewer pipe, underground cleanout, aerobic treatment unit, pump chamber, pump and controls, supply and return lines, and subsurface drip system drainfield. Payment terms are specified for each line item, including excavation, backfill, plumbing, electrical, testing, and other necessary items for a complete and operational installation. The total drainfield area is 684 square feet with approximately 456 feet of drip line. The solicitation is for the Department of Health and Human Services Indian Health Service.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 5-Septic Design.pdf | ||
| B01 75H70124Q00041 Rev.pdf | ||
| A11 Pre-Solicitation SAM notice DRAFT.pdf | ||
| 6-US DOL Wage Determination WA20240053 Dated 5-24-2024.pdf | ||
| 4-Aerial View.pdf | ||
| 3-Technical Specifications.pdf | ||
| 1-Statement of Work.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MEASUREMENT AND PAYMENT FOR BID SCHEDULE LINE ITEMS
MOBILIZATION AND DEMOBILIZATION
Payment shall be made at the contract lump sum price for transportation of equipment, material, and personnel to and from the job site location (regardless of trips required), all required permits and fees, taxes, and all other necessary items to complete the work.
SOLID SEWER PIPE
Payment for solid sewer pipe as specified on the Design shall be made at the contract unit price for the size of pipe listed based on the number of linear feet installed. Payment shall include excavation, backfill and compaction; all pipe and fittings; connection of the solid sewer pipe to an existing sewer service line or home; testing; resurfacing trenched areas to equal or better condition than existing;
and all other necessary items for a complete and operational installation.
4” UNDERGROUND TWO-WAY CLEANOUT
Payment for the underground two-way cleanout as specified on the Design shall be made at the contract unit price for the number of underground cleanouts installed. Payment shall include excavation, backfilling and compaction, all pipe and fittings, and all other necessary items for a complete and operational installation. No payment shall be made for cleanouts installed above grade as part of the connection to existing house, or as part of drop manholes.
AEROBIC TREATMENT UNIT (NUWATER BNR-500 OR EQUIVALENT), 500 GPD
Payment for the aerobic treatment unit, as specified in the Design, shall be made at the contract unit price for the size listed based on the number of tanks installed. Payment shall include excavation, backfill, compaction, sand or gravel where non-uniform native soil or groundwater is present, three-compartment tank, risers, lids, waterproofing, baffles, compressor unit, diffuser, plumbing, valves, fittings, alarm, control panel, connection to the existing home electric panel, testing, L&I inspection, and all other necessary items needed for a complete and operational installation.
1,000-GALLON PUMP CHAMBER, PUMP (ZOELLER 5031-0005 OR EQUAL), AND CONTROLS
Payment for the pump tank, as specified in the Design, shall be made at the contract unit price for the size listed based on the number of pump tanks installed. Payment shall include excavation, backfill, compaction, sand or gravel where non-uniform native soil or groundwater is present, resurfacing excavated areas to equal or better condition than existing and grading to direct surface runoff away from tank, pump tank, risers, lids, waterproofing, plumbing, valves, fittings, pump, floats, fused disconnect (when required), watertight junction box, high water alarm, control panel, connection to the existing home electric subpanel, testing, configuring the control panel and pump/dosing settings at system start-up, and all other necessary items for a complete and operational installation.
EFFLUENT SUPPLY AND RETURN LINE AND MANIFOLDS (1" PVC SCH 40)
Payment for the supply and return line and manifolds as specified on the Design shall be made at the contract unit price for the size of pipe listed based on the number of linear feet installed. Payment shall include excavation, trenching, backfill and compaction, all pipe and fittings (approximately 40 ft each of supply and return line, as shown in the Design, installer to confirm lengths before construction), pressure regulator, air vents at highest points, testing, resurfacing trenched areas to equal or better condition than existing; and all other necessary items for a complete and operational installation.
SUBSURFACE DRIP SYSTEM DRAINFIELD
Payment for a subsurface drip system drainfield as specified in the Design shall be made at the contract unit price based on the number of square feet of drip drainfield installed. Compensation shall include payment for excavation, labor, headworks, drip lines, flexible PVC, air/vacuum relief valves, ball valves, fittings, pressure testing and adjustments, backfilling, final grading, hydro seeding or grass seeding, and all other necessary items needed for a complete and operational installation.
PRETRASH TANK, 500 GALLONS (OPTIONAL ITEM; NOT REQUIRED IF ATU TANK IS CONCRETE)
Payment for trash tank, as specified in the Design, shall be made at the contract unit price for the size listed based on the number of tanks installed. Payment shall include excavation, backfill, compaction, sand or gravel where non-uniform native soil or groundwater is present, concrete tank, risers, lids, plumbing, fittings, connection to solid sewer pipe, waterproofing, and all other necessary items for a complete and operational installation.