2-IW266369 Technical Specs.pdf
PDF 2 MB Posted
- Attached to
- Replace 2 Boilers at San Saba Unit.
- Solicitation number
- IW266369
- Issued by
- Schleicher County, Texas
About this file
This technical specifications document relates to the Texas Department of Criminal Justice's (TDCJ) boiler replacement project at the San Saba Unit. The procurement seeks bids for the replacement of two boilers at the facility. The specifications detail the technical requirements and performance standards that replacement boilers must meet, including capacity, efficiency ratings, pressure vessel compliance, and operational parameters. Bidders must provide equipment that conforms to applicable codes and standards for steam generation systems used in correctional facility operations.
The technical specifications establish minimum requirements for boiler construction, materials, testing, and certification to ensure the equipment meets TDCJ operational needs and safety standards. Proposed boilers must include documentation of compliance with relevant industry codes, performance guarantees, and manufacturer certifications. The specifications serve as the basis for bid evaluation and will be incorporated into the final purchase order contract with the selected vendor.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3-002 TnC IW266369.pdf | ||
| 1-IW266369 Scope of Work.pdf | ||
| 4-001 IW266369 final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TYLER
HUNTSVILLE
AUSTIN
SAN ANTONIO
HOUSTON
DALLAS
LUBBOCK
AMARILLO
EL PASO
LAREDO
FT. WORTH
SAN SABA COUNTY
UNIT LOCATION
SAN SABA, TEXAS
31.2003 N / -98.7623 W
SAN SABA UNIT
SNOOK
WORK SITE VIEW
STATE-WIDE VIEW
THE TEXAS DEPARTMENT OF CRIMINAL JUSTICE
FACILITIES DIVISION
FORT STOCKTON
AERIAL VIEW
M W
R
U N
IT
S
AN
S
AB
A U
N
IT
PR
O
JE
C
T:
R
EP
LA
C E
BO
IL
ER
S
BL
D
G
A
SHEET 1 OF 2
PROJECT LOCATION
31.2001 W / -98.7628 N
PL
O
T D
AT
E:
5/ 9/
:3
AM
D R
AW
IN
G P
AT
H
J:
\D
EP
TI
N
FO
\E ng in ee rin g\ En gi ne er in g G ro up
\E N
G \A
C
AD
L
IB
R
AR
Y\ Pr oj ec t D ra w in g D at ab as e\
Sa n
Sa ba
(0
)\0
- R ep . B
O
IL
ER
S
Bl dg
A
\0
R
EP
L.
B O
IL
ER
S
BL
D G
-A .d w g
T H
E S T A T E O F
T E X
A S
SAN SABA
N
SAN SABA UNIT
N
HUNTSVILLE, TEXAS
ENGINEERING SERVICES
REPLACE BOILERS - BLDG. A
SAN SABA UNIT
SAN SABA, TX 76877
SAN SABA COUNTY
MWR #06523005
DRAWING INDEX
COVER SHEET
P1 DEMO PLAN
PROJECT LOCATION
AutoCAD SHX Text p
AutoCAD SHX Text p
AutoCAD SHX Text p
AutoCAD SHX Text p
AutoCAD SHX Text p
AutoCAD SHX Text o
AutoCAD SHX Text p
AutoCAD SHX Text o
AutoCAD SHX Text o
AutoCAD SHX Text p
AutoCAD SHX Text
AutoCAD SHX Text p
AutoCAD SHX Text p
AutoCAD SHX Text o
AutoCAD SHX Text o
AutoCAD SHX Text o
AutoCAD SHX Text o
THIS DOCUMENT IS RELEASED FOR
REVIEW UNDER THE AUTHORITY OF
TIMOTHY KIERSZ ,P.E. #
IT IS NOT TO BE USED FOR
REGULATORY APPROVAL,
PERMITTING, BID, OR CONSTRUCTION.
TEXAS DEPARTMENT OF CRIMINAL JUSTICE
ENGINEERING SERVICES
ISSUE FOR: REVISIONS: MWR:
M W
R
U N
IT
PR
O
JE
C
T N
AM
E:
ENGINEER:
DRAFTER:
DATE:
SCALE:
DESC:
DATE: DATE:
BRAND OR MANUFACTURER'S REFERENCES ARE DESCRIPTIVE ONLY, AND INDICATE
TYPE AND QUALITY TO BE PROVIDED. ALL REFERENCES TO BRAND OR
MANUFACTURER NAMES SHALL BE INTERPRETED TO INCLUDE THE LANGUAGE "OR
A/E APPROVED EQUAL". ANY BRAND OR MANUFACTURER MEETING SPECIFICATIONS
WILL BE CONSIDERED, IRRESPECTIVE OF THE LANGUAGE "OR A/E APPROVED EQUAL"
APPEARING IN CONJUNCTION WITH THE BRAND OR MANUFACTURER NAME.
TITLE:
OF
SAN SABA
REPLACE BOILERS - BLDG A
06523005
T. KIERSZ
C. FLOYD
5/9/24
N.T.S.
SAN SABA
P1DEMO
PLAN
SA
N
S
AB
A R
EP
LA
C E
BO
IL
ER
S
- B
LD
G A
1ST TECHNICAL REVIEW 5/9/24
CONSTRUCTION 6-6-24
I3 ID3
I4 ID4
I5 ID5
R1 RD1
R2 RD2
R3 RD3
R4 RD4
R5 RD5 2 2
PL
O
T D
AT
E:
5/ 9/
:3
AM
D R
AW
IN
G P
AT
H
J:
\D
EP
TI
N
FO
\E ng in ee rin g\ En gi ne er in g G ro up
\E N
G \A
C
AD
L
IB
R
AR
Y\ Pr oj ec t D ra w in g D at ab as e\
Sa n
Sa ba
(0
)\0
- R ep . B
O
IL
ER
S
Bl dg
A
\0
R
EP
L.
B O
IL
ER
S
BL
D G
-A .d w g
DEMOLISHED VIEW
Scale: NTS1
SITE PLAN, NORTH ELEVATION & PLAN VIEW
Scale: NTS2
REMOVE EXISTING BOILERS,
WORNED PIPE FITTINGS, &
OTHER COMPONENTS.
CLEAN AREA BEFORE
INSTALLING NEW BOILERS.
NEW BOILER SPECS
Scale: NTS3
6-6-24
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text J
AutoCAD SHX Text T
| 06523005 COVER SHEET |
| Sheets and Views |
| COVER |
| 06523005 Demo Plan |
| Sheets and Views |
| P1 (2) |
File details come from the government source that posted it. Updated .