About this file

This document is Addendum #1 for Invitation to Bid (ITB) #7114-25-EUA issued by Lubbock Power & Light's Purchasing Department for Distribution Transformers. The addendum extends the bid closing date to September 5, 2025 at 2:00 p.m. CST, with a timeline for questions and clarifications extended to August 29, 2025. Bidders are required to submit all proposals electronically through the Bonfire portal, with manufacturer specifications and drawings to be emailed to MMoniz@mylubbock.us by August 26, 2025 at 5:00 p.m. CST.

The addendum addresses several key bidder questions, clarifying that overseas manufacturers can participate, no bid bond is required, and there are no Buy American requirements for this bid. Bidders must include a Bulk Power System Sourcing Disclosure Form with their submission. The specifications include transformers with specific voltage requirements, such as a 2500kva transformer at 208/120 volts and a 250kva padmount transformer with dual volt capability. Potential bidders are directed to section 24 of the Instructions to Bidders for country restrictions and are advised to carefully review the detailed specifications for transformer configurations and requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 ITB 7114-25-ELD - Addendum #1

LUBBOCK POWER & LIGHT

PURCHASING DEPARTMENT

1314 AVENUE K

LUBBOCK, TEXAS 79401

ADDENDUM #1

BID NUMBER: ITB# 7114-25-EUA

TITLE: LP&L Distribution Transformers

NEW CLOSE DATE: September 5, 2025 at 2:00 p.m. CST

DATE ISSUED: August 19, 2025

All requests for additional information or clarification must be submitted in writing and directed to:

Bonfire Vendor Discussion Tab

The following items take precedence over requirements for the above named Invitation to Bid (ITB).

Where any item called for in the ITB documents is supplemented here, the original requirements, not affected by this addendum, shall remain in effect.

1. Close date has been extended until September 5, 2025 at 2:00 p.m. CST. Timeline for questions and clarifications will be extended till August 29, 2025.

Questions and answers, please see questions in red.

1. Is there a specific deadline for submitting the specifications and drawings before the bid closing date?

If providing specifications and drawings for consideration, bidders are to email the manufacturer specifications and drawings to MMoniz@mylubbock.us by August 26, 2025 by

5:00 p.m. CST. Late submittals will not be considered.

2. What is the acceptable method for submission?

Please submit all bids electronically to the bonfire portal.

3. Would you accept delivery by FEDEX prior to bid subittal, or should we upload them electronically on the bidding portal along with our proposal on the bid submission date?

Only bids uploaded electronically on the bidding portal will be accepted.

4. We don’t quote 2500kva with 208/120, we can do it with 480/277 on the low side- is this acceptable to quote?

No, please quote the transformer per spec.

5. For 250kva padmount, it is shown on the table in 3 pages that is it necessary DUAL VOLT, but in specification for more detail, there is no mention for DUAL VOLT- please clarify

DUAL VOLT is required for 250kva?

Yes, Dual Volt is required.

mailto:MMoniz@mylubbock.us

2 ITB 7114-25-ELD - Addendum #1

6. Is this spec correct 2500KVA @208/120 is almost 7000amps, I don’t believe there are protections (CB’s) at that amp range for protecting downstream?

Yes, Spec is correct.

7. Would it be possible for Overseas manufacturer to participate in the bidding as bidder directly? If yes, I'm also wondering Affidavit of Eligibility shall be required to submit.

Yes, please ensure the BULK POWER SYSTEM SOURCING DISCLOSURE FORM is included with your bid.

8. Is a bid bond/ surety bond required?

No.

9. Is it possible for a non-American company to participate in this ITB? (For example, considering BABA requirements for transformer materials..)?

There are no buy American requirements for this bid please ensure the BULK POWER

SYSTEM SOURCING DISCLOSURE FORM is included with your bid.

10. If our manufacturer is not listed under “Acceptable Manufacturers,” how many business days prior to the bid submittal are we required to submit the manufacturer’s specifications and drawings in order to be approved as an equal?

If providing an approved equal to be considered, bidders are to email the manufacturer specifications and drawings to MMoniz@mylubbock.us by August 26, 2025 by 5:00 p.m.

CST. Late submittals will not be considered.

11. Is there any country restriction with the origin of the transformers?

Please see section 24 of the Instructions to Bidders on page 14 of the bid document for country restrictions.

Thank You, Megan Moniz CTCD

Buyer I Electric Utilities mailto:MMoniz@mylubbock.us