2-ITB 2026-9 Bid Tabs.xlsx
XLSX spreadsheet 21 KB Posted
- Solicitation number
- ITB 2026-9
- Issued by
- Utah County, Utah
About this file
This file is a bid tabulation sheet for ITB 2026-9, Lower Provo River Parkway Improvements, issued by Utah County for construction improvements to the Lower Provo River Parkway in Provo, Utah. The project encompasses multiple work items including general conditions, traffic control, construction layout, mobilization/demobilization, pulverizing, untreated base course installation, HMA pavement, fence and gate removal and installation, bank stabilization across three areas, tree stump and log removal, culvert removal, trail bench work, utility collar raising, shouldering, concrete car stops, pavement marking, soft spot repairs, and trailhead parking lot expansion with associated site work. The bid tabulation details estimated quantities for each line item, ranging from single units for lump sum work to thousands of square feet or tons for material-based items, with specifications referenced in the project drawings.
Eight contractors submitted bids for the project: Stapp Construction Inc ($1,249,610.18), Staker & Parsons Companies ($1,250,636.79), Whitaker Construction ($1,443,789.95), J. Lynn Roberts ($1,450,311.00), Black Forest Paving ($1,649,531.75), BH Inc ($1,705,222.93), SMM Excavation ($2,399,060.75), and one additional bidder at $1,601,134.35. Bid prices vary significantly across contractors, with Stapp Construction offering the lowest total bid and SMM Excavation offering the highest. Line item pricing reflects substantial variation among bidders, particularly in high-cost items such as bank stabilization work, excavation, HMA pavement, untreated base course, and shouldering operations, indicating different contractor approaches to project execution and material sourcing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-ITB 2026-9 - Lower Provo River Parkway Improvements.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Bidder | Amount |
| BH Inc | $ 1,705,222.90 |
| Black forest paving | $ 1,649,531.75 |
| Dry Creek Structures | $ 1,443,789.95 |
| JLR Contractors | $ 1,450,311.00 |
| RB Construction Concrete | $ 1,765,000.00 |
| SMM Excavation | $ 2,399,060.75 |
| Staker and Parson Companies | $ 1,250,636.79 |
| Stapp Construction Inc | $ 1,249,610.18 |
| $ 1,601,134.35 |
Sheet2
| Item | APWA | DESCRIPTION | Unit | ESTIMATED QUANTITY | Stapp Construction | Staker & Parsons | Whitaker Construction | J. Lynn Roberts | Black Forest Paving | BH, IMC | RB Construction | SMM Excavation | ||||||||
| UNIT PRICE | AMOUNT | UNIT PRICE | AMOUNT | UNIT PRICE | AMOUNT | UNIT PRICE | AMOUNT | UNIT PRICE | AMOUNT | UNIT PRICE | AMOUNT | UNIT PRICE | AMOUNT | UNIT PRICE | AMOUNT | |||||
| 1 | 00 72 00 | General Conditions | Lump | 1 | $ 23,480.00 | $ 23,480.00 | $ 26,000.00 | $ 26,000.00 | $ 95,000.00 | $ 95,000.00 | $ 65,000.00 | $ 65,000.00 | $ 59,400.00 | $ 59,400.00 | $ 195,566.03 | $ 195,566.03 | $ 72,675.00 | $ 72,675.00 | $ 15,000.00 | $ 15,000.00 |
| 2 | 01 55 26 | Traffic Control | Lump | 1 | $ 8,915.00 | $ 8,915.00 | $ 39,000.00 | $ 39,000.00 | $ 17,500.00 | $ 17,500.00 | $ 4,750.00 | $ 4,750.00 | $ 18,000.00 | $ 18,000.00 | $ 19,442.82 | $ 19,442.82 | $ 14,344.00 | $ 14,344.00 | $ 20,000.00 | $ 20,000.00 |
| 3 | 01 71 23 | Construction Layout | Lump | 1 | $ 9,395.00 | $ 9,395.00 | $ 18,000.00 | $ 18,000.00 | $ 21,800.00 | $ 21,800.00 | $ 7,680.00 | $ 7,680.00 | $ 8,960.00 | $ 8,960.00 | $ 16,060.96 | $ 16,060.96 | $ 16,894.00 | $ 16,894.00 | $ 12,000.00 | $ 12,000.00 |
| 4 | 00 71 13 | Mobilization/demobilization | Lump | 1 | $ 40,360.00 | $ 40,360.00 | $ 15,750.00 | $ 15,750.00 | $ 97,000.00 | $ 97,000.00 | $ 29,500.00 | $ 29,500.00 | $ 158,000.00 | $ 158,000.00 | $ 17,960.57 | $ 17,960.57 | $ 35,093.77 | $ 35,093.77 | $ 135,000.00 | $ 135,000.00 |
| 5 | 32 01 16.71 | Pulverizing | SQ FT | 147,089 | $ 0.42 | $ 61,777.38 | $ 0.21 | $ 30,888.69 | $ 0.15 | $ 22,063.35 | $ 0.90 | $ 132,380.10 | $ 0.45 | $ 66,190.05 | $ 0.40 | $ 58,835.60 | $ 1.53 | $ 225,046.17 | $ 0.75 | $ 110,316.75 |
| 8 | 32 11 23 | Untreated Base Course | Ton | 8000 | $ 29.50 | $ 236,000.00 | $ 36.65 | $ 293,200.00 | $ 33.00 | $ 264,000.00 | $ 26.50 | $ 212,000.00 | $ 37.00 | $ 296,000.00 | $ 57.68 | $ 461,440.00 | $ 71.44 | $ 571,520.00 | $ 58.00 | $ 464,000.00 |
| 9 | 32 12 16.13 | HMA-3/8 Inch | Ton | 2,800 | $ 134.00 | $ 375,200.00 | $ 119.00 | $ 333,200.00 | $ 133.00 | $ 372,400.00 | $ 145.00 | $ 406,000.00 | $ 123.00 | $ 344,400.00 | $ 143.82 | $ 402,696.00 | $ 149.18 | $ 417,704.00 | $ 165.00 | $ 462,000.00 |
| 10 | 32 01 10 | Fence Removal | LF | 227 | $ 12.50 | $ 2,837.50 | $ 5.00 | $ 1,135.00 | $ 10.00 | $ 2,270.00 | $ 12.00 | $ 2,724.00 | $ 13.50 | $ 3,064.50 | $ 9.96 | $ 2,260.92 | $ 17.06 | $ 3,872.62 | $ 30.00 | $ 6,810.00 |
| 11 | 32 31 16 | 2-3/8” Drill Pipe Fence | LF | 245 | $ 103.00 | $ 25,235.00 | $ 86.00 | $ 21,070.00 | $ 135.00 | $ 33,075.00 | $ 45.00 | $ 11,025.00 | $ 56.00 | $ 13,720.00 | $ 95.78 | $ 23,466.10 | $ 51.00 | $ 12,495.00 | $ 150.00 | $ 36,750.00 |
| 13 | 31 11 00 | Gate Removal | Each | 3 | $ 626.00 | $ 1,878.00 | $ 269.00 | $ 807.00 | $ 490.00 | $ 1,470.00 | $ 875.00 | $ 2,625.00 | $ 336.00 | $ 1,008.00 | $ 523.27 | $ 1,569.81 | $ 797.00 | $ 2,391.00 | $ 750.00 | $ 2,250.00 |
| 14 | 32 31 16 | Gates | Each | 3 | $ 3,760.00 | $ 11,280.00 | $ 4,600.00 | $ 13,800.00 | $ 3,810.00 | $ 11,430.00 | $ 1,500.00 | $ 4,500.00 | $ 1,120.00 | $ 3,360.00 | $ 3,504.21 | $ 10,512.63 | $ 4,330.00 | $ 12,990.00 | $ 2,400.00 | $ 7,200.00 |
| 15 | 32 25 00 | Area 1 Bank Stabilization | Lump | 1 | $ 23,205.00 | $ 23,205.00 | $ 24,560.00 | $ 24,560.00 | $ 19,000.00 | $ 19,000.00 | $ 43,500.00 | $ 43,500.00 | $ 42,000.00 | $ 42,000.00 | $ 34,498.94 | $ 34,498.94 | $ 43,240.00 | $ 43,240.00 | $ 76,000.00 | $ 76,000.00 |
| 16 | 32 25 00 | Area 2 Bank Stabilization | Lump | 1 | $ 45,195.00 | $ 45,195.00 | $ 64,600.00 | $ 64,600.00 | $ 38,600.00 | $ 38,600.00 | $ 85,000.00 | $ 85,000.00 | $ 57,500.00 | $ 57,500.00 | $ 51,822.58 | $ 51,822.58 | $ 85,919.00 | $ 85,919.00 | $ 99,000.00 | $ 99,000.00 |
| 17 | 32 25 00 | Area 3 Bank Stabilization | Lump | 1 | $ 20,575.00 | $ 20,575.00 | $ 32,300.00 | $ 32,300.00 | $ 23,800.00 | $ 23,800.00 | $ 47,950.00 | $ 47,950.00 | $ 63,250.00 | $ 63,250.00 | $ 64,243.83 | $ 64,243.83 | $ 37,905.00 | $ 37,905.00 | $ 155,000.00 | $ 155,000.00 |
| 20 | 31 11 00 | Tree Stump and Log Removal | Lump | 1 | $ 2,425.00 | $ 2,425.00 | $ 9,000.00 | $ 9,000.00 | $ 7,110.00 | $ 7,110.00 | $ 8,600.00 | $ 8,600.00 | $ 11,200.00 | $ 11,200.00 | $ 10,162.21 | $ 10,162.21 | $ 19,571.00 | $ 19,571.00 | $ 14,500.00 | $ 14,500.00 |
| 18 | 02 41 13 | Removal of Existing Culvert | Each | 1 | $ 5,360.00 | $ 5,360.00 | $ 1,000.00 | $ 1,000.00 | $ 1,690.00 | $ 1,690.00 | $ 1,750.00 | $ 1,750.00 | $ 1,800.00 | $ 1,800.00 | $ 4,318.26 | $ 4,318.26 | $ 20,432.00 | $ 20,432.00 | $ 8,450.00 | $ 8,450.00 |
| 19 | 02 41 13 | Trail Bench Removal and Install | Each | 2 | $ 2,955.00 | $ 5,910.00 | $ 2,450.00 | $ 4,900.00 | $ 590.00 | $ 1,180.00 | $ 2,450.00 | $ 4,900.00 | $ 2,500.00 | $ 5,000.00 | $ 2,428.07 | $ 4,856.14 | $ 3,538.00 | $ 7,076.00 | $ 4,520.00 | $ 9,040.00 |
| 25 | 33 05 14 | Raise and Collar Utilities | Each | 1 | $ 1,520.00 | $ 1,520.00 | $ 1,020.00 | $ 1,020.00 | $ 2,720.00 | $ 2,720.00 | $ 650.00 | $ 650.00 | $ 2,200.00 | $ 2,200.00 | $ 1,401.68 | $ 1,401.68 | $ 1,275.00 | $ 1,275.00 | $ 2,200.00 | $ 2,200.00 |
| 26 | 31 23 16 | Shouldering | LF | 23,122 | $ 1.15 | $ 26,590.30 | $ 0.80 | $ 18,497.60 | $ 1.30 | $ 30,058.60 | $ 3.95 | $ 91,331.90 | $ 3.10 | $ 71,678.20 | $ 0.88 | $ 20,347.36 | $ 6.52 | $ 150,755.44 | $ 9.00 | $ 208,098.00 |
| 28 | 32 16 13 | Concrete Car Stops Removal/Install | Each | 8 | $ 380.00 | $ 3,040.00 | $ 155.00 | $ 1,240.00 | $ 580.00 | $ 4,640.00 | $ 295.00 | $ 2,360.00 | $ 365.00 | $ 2,920.00 | $ 107.08 | $ 856.64 | $ 745.00 | $ 5,960.00 | $ 500.00 | $ 4,000.00 |
| 29 | 32 17 23 | Pavement Marking | Lump | 1 | $ 14,355.00 | $ 14,355.00 | $ 1,020.00 | $ 1,020.00 | $ 13,700.00 | $ 13,700.00 | $ 10,450.00 | $ 10,450.00 | $ 6,500.00 | $ 6,500.00 | $ 5,387.14 | $ 5,387.14 | $ 7,841.00 | $ 7,841.00 | $ 15,000.00 | $ 15,000.00 |
| Added Alternates | ||||||||||||||||||||
| 31 | 31 23 16 | Soft Spot | SQ FT | 19,000 | $ 1.50 | $ 28,500.00 | $ 6.00 | $ 114,000.00 | $ 7.00 | $ 133,000.00 | $ 4.75 | $ 90,250.00 | $ 7.25 | $ 137,750.00 | $ 5.28 | $ 100,320.00 | $ 8.54 | $ 162,260.00 | $ 11.00 | $ 209,000.00 |
| Trailhead Parking Lot Expansion | ||||||||||||||||||||
| 5 | 32 01 16.71 | Pulverizing | SQ FT | 5,200 | $ 0.95 | $ 4,940.00 | $ 0.21 | $ 1,092.00 | $ 1.00 | $ 5,200.00 | $ 0.70 | $ 3,640.00 | $ 0.60 | $ 3,120.00 | $ 0.53 | $ 2,756.00 | $ 1.53 | $ 7,956.00 | $ 1.00 | $ 5,200.00 |
| 6 | 31 11 00 | Clear and Grubbing | Lump | 1 | $ 22,385.00 | $ 22,385.00 | $ 9,150.00 | $ 9,150.00 | $ 4,700.00 | $ 4,700.00 | $ 14,950.00 | $ 14,950.00 | $ 17,200.00 | $ 17,200.00 | $ 11,107.46 | $ 11,107.46 | $ 13,906.00 | $ 13,906.00 | $ 15,000.00 | $ 15,000.00 |
| 7 | 31 23 16 | Excavation | CU YD | 1,500 | $ 43.00 | $ 64,500.00 | $ 25.60 | $ 38,400.00 | $ 32.00 | $ 48,000.00 | $ 19.50 | $ 29,250.00 | $ 72.00 | $ 108,000.00 | $ 30.60 | $ 45,900.00 | $ 41.65 | $ 62,475.00 | $ 55.00 | $ 82,500.00 |
| 9 | 32 01 10 | Fence Removal | LF | 490 | $ 12.50 | $ 6,125.00 | $ 3.15 | $ 1,543.50 | $ 10.00 | $ 4,900.00 | $ 9.50 | $ 4,655.00 | $ 13.50 | $ 6,615.00 | $ 6.28 | $ 3,077.20 | $ 15.94 | $ 7,810.60 | $ 30.00 | $ 14,700.00 |
| 21 | 31 11 00 | Bicycle Rack Removal | Each | 1 | $ 223.00 | $ 223.00 | $ 200.00 | $ 200.00 | $ 470.00 | $ 470.00 | $ 175.00 | $ 175.00 | $ 1,120.00 | $ 1,120.00 | $ 318.29 | $ 318.29 | $ 693.00 | $ 693.00 | $ 550.00 | $ 550.00 |
| 8 | 32 11 23 | Untreated Base Course | Ton | 1,500 | $ 29.50 | $ 44,250.00 | $ 35.70 | $ 53,550.00 | $ 33.00 | $ 49,500.00 | $ 24.00 | $ 36,000.00 | $ 33.00 | $ 49,500.00 | $ 35.11 | $ 52,665.00 | $ 46.60 | $ 69,900.00 | $ 55.00 | $ 82,500.00 |
| 9 | 32 12 16.13 | HMA-3/8 Inch | Ton | 500 | $ 145.00 | $ 72,500.00 | $ 96.00 | $ 48,000.00 | $ 121.00 | $ 60,500.00 | $ 119.00 | $ 59,500.00 | $ 120.00 | $ 60,000.00 | $ 102.13 | $ 51,065.00 | $ 133.88 | $ 66,940.00 | $ 135.00 | $ 67,500.00 |
| 12 | 32 31 13 | 4’ Chain Link Fence | LF | 376 | $ 31.50 | $ 11,844.00 | $ 36.00 | $ 13,536.00 | $ 86.00 | $ 32,336.00 | $ 31.00 | $ 11,656.00 | $ 23.00 | $ 8,648.00 | $ 29.20 | $ 10,979.20 | $ 34.42 | $ 12,941.92 | $ 26.00 | $ 9,776.00 |
| 22 | 32 16 13 | ADA Ramp | Each | 1 | $ 2,255.00 | $ 2,255.00 | $ 6,115.00 | $ 6,115.00 | $ 4,400.00 | $ 4,400.00 | $ 4,250.00 | $ 4,250.00 | $ 2,700.00 | $ 2,700.00 | $ 1,589.51 | $ 1,589.51 | $ 3,602.00 | $ 3,602.00 | $ 5,400.00 | $ 5,400.00 |
| 23 | 32 16 13 | Curb and Gutter Type A-30” | LF | 160 | $ 48.00 | $ 7,680.00 | $ 40.00 | $ 6,400.00 | $ 50.00 | $ 8,000.00 | $ 60.00 | $ 9,600.00 | $ 54.00 | $ 8,640.00 | $ 45.20 | $ 7,232.00 | $ 50.92 | $ 8,147.20 | $ 48.00 | $ 7,680.00 |
| 24 | 32 16 13 | Curb and Gutter Type H-30” | LF | 50 | $ 76.00 | $ 3,800.00 | $ 45.00 | $ 2,250.00 | $ 50.00 | $ 2,500.00 | $ 85.00 | $ 4,250.00 | $ 60.00 | $ 3,000.00 | $ 45.33 | $ 2,266.50 | $ 50.92 | $ 2,546.00 | $ 48.00 | $ 2,400.00 |
| 27 | - | Parking Lot Swale | LF | 172 | $ 180.00 | $ 30,960.00 | $ 21.00 | $ 3,612.00 | $ 30.00 | $ 5,160.00 | $ 22.00 | $ 3,784.00 | $ 24.00 | $ 4,128.00 | $ 33.54 | $ 5,768.88 | $ 69.49 | $ 11,952.28 | $ 45.00 | $ 7,740.00 |
| 29 | 32 17 23 | Pavement Marking | Lump | 1 | $ 3,845.00 | $ 3,845.00 | $ 1,275.00 | $ 1,275.00 | $ 4,200.00 | $ 4,200.00 | $ 2,980.00 | $ 2,980.00 | $ 2,400.00 | $ 2,400.00 | $ 1,478.78 | $ 1,478.78 | $ 995.00 | $ 995.00 | $ 18,000.00 | $ 18,000.00 |
| 30 | 32 01 05 | Sign, Post, and Foundation | EA | 1 | $ 1,270.00 | $ 1,270.00 | $ 525.00 | $ 525.00 | $ 417.00 | $ 417.00 | $ 695.00 | $ 695.00 | $ 560.00 | $ 560.00 | $ 992.89 | $ 992.89 | $ 2,875.00 | $ 2,875.00 | $ 8,500.00 | $ 8,500.00 |
| $ 1,249,610.18 | $ 1,250,636.79 | $ 1,443,789.95 | $ 1,450,311.00 | $ 1,649,531.75 | $ 1,705,222.93 | $ 2,200,000.00 | $ 2,399,060.75 |
$ 1,026.61