2-H. Bid Table (Pricing Response).xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- Dewatering and Cleaning of Process Tanks Service
- Solicitation number
- FY26-RFP-10
- Issued by
- Mecklenburg County, Charlotte City, North Carolina
About this file
The document is a Bid Table (Pricing Response) spreadsheet for Charlotte Water, detailing a Request for Proposal (RFP) for dewatering and cleaning of Wastewater Treatment Plant (WWTP) Digesters located in North Carolina. The project involves comprehensive services for dewatering process tanks, including mobilization, onsite dewatering operations, equipment management, transportation, and disposal of sludge/residuals. The estimated project scope includes 200 dry tons of dewatering and 1,200 wet tons of transportation and disposal, with pricing structured across four primary line items: general conditions, mobilization, labor for dewatering operations, and transportation/disposal costs.
The pricing structure requires bidders to provide all-inclusive costs in United States dollars, with a payment basis that includes a lump sum for general conditions and a percentage-based completion schedule featuring 5% retainage until final project completion. The bid table allows for unit pricing per dry and wet ton, with unit prices to be determined by the bidding company. The total proposal price will be calculated by summing the costs across the four specified line items, reflecting a comprehensive approach to capturing all potential project expenses. The contract appears designed to address critical infrastructure maintenance by removing accumulated trash and grit from digesters, which can negatively impact equipment performance and environmental stabilization processes.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 (2) Companies shall provide pricing based on the requirements and terms set forth in this RFP. Pricing must be all-inclusive and cover every aspect of the Project. Cost must be in United States dollars. Your Price Proposal must reflect all costs for which the City will be responsible.
| Item | Payment Basis | Unit Price and Qty | Extended Price | |
| 1 | Lump Sum: | Percentage of work complete based on project schedule, with 5% retainage withheld until final project completion | Lump Sum | $_____________ |
| · General conditions, insurance, permits, safety, administration and related cost required for full contract period. | ||||
| · One-time fee for the contract term. | ||||
| · All costs not specifically defined in other line items | ||||
| 2 | · Mobilization of all equipment and materials required to perform the work for the full Contract period | Per event (May include multiple tanks at a site) | $_____________ | |
| · Interim demobilization/mobilization to provide time for interior inspections, tank filling, operation startup, etc. for each tank | ||||
| 3 | Unit Price – Labor associated with onsite dewatering operations, equipment management, filling of hauler trucks, all consumables (polymer, etc.), and any ancillary effort to perform the work | Dry tons verified using three samples from each trailer load, composited and lab verified for percent solids | $________ / ton | $_____________ |
| x 200 dry tons(estimates) | ||||
| 4 | Unit Price – Transportation and Disposal (based on transportation of dewatered sludge/residuals from Irwin Creek to the landfill used by the Company, including tipping fees at the landfill) | Wet tons verified with landfill receipt tickets | $________ / ton | $_____________ |
| x 1,200 wet tons(estimates) | ||||
| TOTAL PROPOSAL PRICE | N/A | $_____________ | ||
| (SUM OF ITEMS 1 – 4): |
File details come from the government source that posted it. Updated .