2. Wash & Paint Aircraft Sun Shelters 2024 SoW Rev1.docx

DOCX document 28 KB Posted

Attached to
Pressure Wash Aircraft Sun Shelters
Solicitation number
W50S6N-24-Q-A013
Issued by

About this file

This document is a Statement of Work (SOW) for a federal contract opportunity to pressure wash the aircraft sun shelters at the 187th Fighter Wing located at Dannelly Field in Montgomery, Alabama.

The key details are:

  • The contractor shall provide all labor, equipment, and travel to pressure wash 11 aircraft sun shelters, each measuring 24 feet high, 65 feet wide, and 65 feet long, for a total of approximately 106,700 square feet.
  • The period of performance is 60 days after notice to proceed following contract award.
  • The work shall be performed between the hours of 0700-1700 hours Tuesday through Friday, excluding federal holidays.
  • The contractor is responsible for collection and disposal of all debris, including paint chips.
  • A pre-construction meeting with the prime contractor is mandatory to coordinate work with airfield management, environmental, and security forces.
  • The related federal contract opportunity is Solicitation Number W50S6N-24-Q-A013, with no contract award to be made until appropriated funds are available.

View the file

Other files

File Type Posted
RFIs.docx DOCX document
Base Utility Map.pdf PDF
Combo Sun Shelter Pressure Washing.2.docx DOCX document
Site Visit Attendance Sheet.pdf PDF
Clauses and Provision v2 4-9-2024.pdf PDF
EAL_Site Visit_Sun Shelters.pdf PDF
Clauses and Provision.2.pdf PDF
Wage Determination 3_19_2024.txt TXT text file
Combo Sun Shelter Pressure Washing.1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pressure Wash Aircraft Sun Shelters 2024 Alabama Air National Guard

187th FW 5187 Selma Hwy Montgomery, AL 36108

General Information The Air National Guard has a requirement to pressure wash the aircraft sun shelters located on the Air Guard aircraft apron at the Montgomery Regional Airport. The work covered by this Statement of Work consists of furnishing all labor, equipment, and travel to perform the required work.

General Scope of Work:

The project is being managed from the 187th Civil Engineer Squadron (187th CES) and 187th Contracting offices located at Montgomery Air National Guard Base in Montgomery, Alabama. A contracting officer’s representative (COR) will be designated at the 187th CES.

Description of Work:

The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items needed to pressure was the aircraft sun shelters as indicated below. The roofing panels have a factory heat cured finish and it is the government’s desire to keep the original coating intact. There are eleven shelters that shall be cleaned. The measurements are 24 foot high measured at the crown of the roof, 65 foot wide and 65 foot long. The area to be cleaned is approximately 9,700 SF per shelter totaling 106,700 SF.

Contractor shall perform the following tasks to pressure wash the sun shelters at the 187th FW.

Contractor shall pressure wash the entire metal structures to remove dirt, grime, and any loose paint.

Contractor shall collect and dispose of all debris, including paint chips.

Contractor shall make use of wide-angle nozzles to minimize direct impact on sun shelters roof and underside.

NOTE

The contractor shall be required to coordinate with the Government to ensure adequate sun shelters are always available to support flying operations.

Period of performance:

The period of performance shall be 60 days after notice to proceed following contract award.

Place and hours of Performance The contractor is responsible for conducting business between the hours of 0700-1700 hours Tuesday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.

The project location is in a controlled area. The 187th CES will provide an escort for all contractor personnel within the controlled area.

If contractor desires to work on Mondays prior coordination with the 187th CES will be required to obtain an escort to the work area.

The Contractor must at all times maintain an adequate workforce for the uninterrupted execution of all tasks defined within this SOW when the Government facility is not closed for the above reasons.

Recognized Holidays:

New Year’s Day
Labor Day
Martin Luther King Jr.’s Birthday
Columbus Day
Washington’s Birthday
Veterans Day
Memorial Day
Thanksgiving Day
Juneteenth National Independence Day
Christmas Day

Independence Day

Prior to the award of the contract the Contractor can attend a Pre-Bid Conference at a time and date determined by the 187th Contracting Office. During this conference the Contractor can visit the site and conduct a preliminary walk-through with 187th CES personnel. During the site visit, the Contractor can identify any issues that may conflict with or affect the outcome of the work. The Contractor is expected to include any cost required for the accommodation of such items within the original cost proposal.

A pre-construction meeting with the prime contractor is mandatory, to coordinate with Air Field Management, for phasing, Environmental and Security Forces.

Disposal Requirements:

The Contractor is responsible for the collection and disposal of all debris, rubble, residue and waste material generated in the execution of work under this contract. All such materials shall be disposed of at an off base landfill by the CONTRACTOR or location specified by 187th Civil Engineer personnel. The CONTRACTOR is not permitted to deposit any such materials in base trash collection containers or at any on base location without prior approval of the Contracting Officer.

Existing Conditions:

The Contractor is responsible for returning all conditions of the site to the condition it was in prior to work beginning, to include but not limited to soils, grass, pavements, and utilities.

Security Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within Government controlled installation, facility, or area. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

For Contractors that do not require CAC, but require access to a DoD Facility and/or Installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 10-245, AFI 31-101 and AFMAN 31-113), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

Antiterrorism Awareness Level I Training (AT Level I). This standard language is for contractor employees with an area of performance within a US Government controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access to US Government installations, facilities and controlled access areas shall complete AT Level I training within XX calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. AT Level I may be accomplished by a Level I qualified instructor; completing the Force Protection computer-based training (CBT) course on the Advanced Distributed Learning System (ADLS), or Joint Knowledge Online at http://jko.jten.mil. Tracking for each contractor or subcontractor employee is the responsibility of the COR or unit AT Representative.

APPENDICES

N/A