2. SPECIFICATIONS.pdf
PDF 268 KB Posted
- Attached to
- VERTICAL BALER
- Solicitation number
- 363348-GMG
About this file
This document is a technical specification for two vertical balers required by the Fermi Research Alliance, LLC (FRA) for the Long-Baseline Neutrino Facility (LBNF) Project at the Sanford Underground Research Facility in Lead, SD. The balers will be used to process waste consisting of cardboard, plastics, and non-ferrous metals in underground caverns.
The specification details precise technical requirements including: dimensions under 12'L x 4.4'W x 10.2'H, weight under 6,000 lbs, 10 hp submersible motor, 3-phase voltage options (208/230/480), hydraulic reservoir capacity under 50 gallons, and press force minimum of 80,000 lbs. The balers must produce bales under 60 cubic feet and 1,500 lbs, with a minimum of 5 bale ties and cycle time under 90 seconds. Post-award deliverables include customer support and operator manuals. The document also includes quality control requirements for the subcontractor to manage and document work compliance, including oversight of suppliers and sub-tier contractors.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS LBNF/DUNE-US FDC
Fermi National Accelerator Laboratory 1
1. INTRODUCTION
Under contract to the U.S. Department of Energy (DOE), the Fermi Research Alliance, LLC (FRA), is leading the Long-Baseline Neutrino Facility (LBNF) Project to enable a world-class program in neutrino physics.
Specifically, the LBNF Project (https://lbnf-dune.fnal.gov) provides the infrastructure for the Deep Underground Neutrino Experiment (DUNE), which will consist of two large liquid argon-based neutrino detectors located nearly a mile underground at the Sanford Underground Research Facility (SURF) in Lead, SD. See Figure 1, LBNF/DUNE-US Schematic
The Far Detector & Cryogenics (FDC) subproject of LBNF/DUNE-US installs the cryostats, detectors, cryogenics and supporting infrastructure at the SURF laboratory.
Figure 1, LBNF/DUNE-US Schematic
2. STRUCTURE/COMPONENT DESCRIPTION
The vertical baler is a piece of equipment utilized to process waste consisting of cardboard, plastics, and non-ferrous metals. Two identical balers will be located in the underground caverns and will process this waste by means of compaction, resulting in a wired bale, which will then be transported to the surface for removal.
3. TECHNICAL REQUIREMENTS
The vendor shall provide a vertical baler that meets the following requirements.
• Total Equipment Dimensions (with retracted cylinder) – Must be less than 12’L x 4.4’W x 10.2’H cage dimensions to allow for transport to the underground caverns.
• Total Equipment Weight - <6,000 lbs.
https://lbnf-dune.fnal.gov/
Specification LBNF/DUNE-US FDC
Fermi National Accelerator Laboratory 2
• Motor Horsepower – 10 hp submersible
• Voltage – 3 phase/208,230,480 o Minimal effort shall be required to reconfigure wiring when switching voltage
• Full Load Amps – 32A, 28A, 14A
• Hydraulic Reservoir Capacity - < 50 gal.
• Permanently affixed spill containment pan
• Door hinges shall be on lefthand side of unit, on opposite side of control panel
• Full Bale Switch - Standard
• Bale Volume - < 60 cu. ft.
• Bale Weight - < 1,500 lbs.
• Number of Bale Ties – Minimum of 5
• Cylinder Bore Stroke – 7” x 60”
• Press Force – Minimum of 80,000 lbs.
• Average Cycle Time - < 90 seconds
4. POST-AWARD DELIVERABLES
The Subcontractor shall comply with the following requirements once the subcontract award has been made.
• Customer support to answer any questions that arise relating to installation and/or operation.
• Any and all available Operator’s Manuals for the purchased vertical baler.
5. QUALITY CONTROL
The Subcontractor is responsible for all activities necessary to manage, control, and document work to ensure compliance with the subcontract documents. The Subcontractor’s responsibility includes ensuring adequate Quality Control services are provided for work accomplished on- and off-site by their organization, suppliers, sub-tier subcontractors, technical laboratories, and consultants.
End of Document