This document is a Schedule of Items for a road repair project in Los Padres National Forest. The solicitation (127EAW25R0009) is a Total Small Business Set Aside construction contract valued between $1,000,000 and $5,000,000 for West Camino Cielo Road Repairs. The schedule details 11 specific construction line items including mobilization, soil erosion control, roadway excavation, subbase preparation, chip sealing, asphalt pavement patching, and temporary traffic control, with estimated quantities for each task.

Key contract details include a requirement for contractors to submit pricing for all items, field verify quantities, and comply with project specifications. The project involves approximately 6.72 miles of roadway work, including 62,683 square yards of chip sealing and 818 square yards of full-depth asphalt pavement patching. Contractors must submit all line item pricing, with no separate payment for bond premiums. Requests for information must be submitted to the Contracting Officer Greg Cunningham by April 2nd, 2025 at 1:00 PM PST, and while no pre-proposal site visit is scheduled, the project locations are publicly accessible.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART I—THE SCHEDULE

SECTION B-- SCHEDULE OF ITEMS

B.1 SCHEDULE OF ITEMS - (BASE CONSTRUCTION)

Item
Construction Items
Qty
UNIT
Unit Price
Total Price
15101
Mobilization
1
Lump Sum
$___________
$___________
15401
Contractor testing
1
Lump Sum
$___________
$___________
15713
Soil Erosion & Pollution Control
1
Lump Sum
$___________
$___________
20402
Roadway excavation and embankment, compaction 204.11.3, tolerance class A
6.72
Mile
$___________
$___________
30106
Subbase, gradation A (Table 703-2), compaction 301.05
43
CY
$___________
$___________
40601
Fog Seal, SS-1 or SS-1h
35
Ton
$___________
$___________
40704
Chip Seal, Single Course Type 1C, Grading C
62,683
SQYD
$___________
$___________
41802
Asphalt Concrete Pavement Patching Full Depth, Type 2
818
SQYD
$___________
$___________
842
Brushing and Grubbing
7.62
MILE
$___________
$___________
63501
Temporary traffic control
1
Lump Sum
$___________
$___________
BASE TOTAL:
$___________

B.2 SCHEDULE NOTES

* Work items not listed with Pay Items are incidental, i.e. not paid separately, including Saw cut, Asphalt Removal / Hot Mix Asphalt for Cut and Patch Areas, Staking. Estimate of quantities are for contractor convenience, contractor shall be responsible to verify all quantities. Dispose old asphalt from cut areas legally off Forest land. Emulsified Asphalt CRS-2 and 3/8 in. and Aggregate for Chip Seal are incidental to Pay Item 40704, estimated at 55 T and 650 T respectively. Hot Mix Asphalt Pavement Patching use CalTrans 1/2 in. Asphalt Concrete, Type A, PG 64-16, 2 in. compacted included in Pay Item 41802, estimated at 420 T.

* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.

* One award will be made from this solicitation; contractors must submit pricing for all items.

NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price.