PART I—THE SCHEDULE
SECTION B-- SCHEDULE OF ITEMS
B.1 SCHEDULE OF ITEMS - (BASE CONSTRUCTION)
| Item |
| Construction Items |
| Qty |
| UNIT |
| Unit Price |
| Total Price |
| 15101 |
| Mobilization |
| 1 |
| Lump Sum |
| $___________ |
| $___________ |
| 15401 |
| Contractor testing |
| 1 |
| Lump Sum |
| $___________ |
| $___________ |
| 15713 |
| Soil Erosion & Pollution Control |
| 1 |
| Lump Sum |
| $___________ |
| $___________ |
| 20402 |
| Roadway excavation and embankment, compaction 204.11.3, tolerance class A |
| 6.72 |
| Mile |
| $___________ |
| $___________ |
| 30106 |
| Subbase, gradation A (Table 703-2), compaction 301.05 |
| 43 |
| CY |
| $___________ |
| $___________ |
| 40601 |
| Fog Seal, SS-1 or SS-1h |
| 35 |
| Ton |
| $___________ |
| $___________ |
| 40704 |
| Chip Seal, Single Course Type 1C, Grading C |
| 62,683 |
| SQYD |
| $___________ |
| $___________ |
| 41802 |
| Asphalt Concrete Pavement Patching Full Depth, Type 2 |
| 818 |
| SQYD |
| $___________ |
| $___________ |
| 842 |
| Brushing and Grubbing |
| 7.62 |
| MILE |
| $___________ |
| $___________ |
| 63501 |
| Temporary traffic control |
| 1 |
| Lump Sum |
| $___________ |
| $___________ |
B.2 SCHEDULE NOTES
* Work items not listed with Pay Items are incidental, i.e. not paid separately, including Saw cut, Asphalt Removal / Hot Mix Asphalt for Cut and Patch Areas, Staking. Estimate of quantities are for contractor convenience, contractor shall be responsible to verify all quantities. Dispose old asphalt from cut areas legally off Forest land. Emulsified Asphalt CRS-2 and 3/8 in. and Aggregate for Chip Seal are incidental to Pay Item 40704, estimated at 55 T and 650 T respectively. Hot Mix Asphalt Pavement Patching use CalTrans 1/2 in. Asphalt Concrete, Type A, PG 64-16, 2 in. compacted included in Pay Item 41802, estimated at 420 T.
* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.
* One award will be made from this solicitation; contractors must submit pricing for all items.
NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price.