2. Schedule.docx
DOCX document 15 KB Posted
- Attached to
- 127EAW23R0042 - San Marcos Well Drilling
- Solicitation number
- 127EAW23R0042
- Issued by
-
Department of Agriculture Forest Service
About this file
This document contains a schedule of items for a federal construction contract opportunity with the Department of Agriculture Forest Service solicitation number 127EAW23R0042 for San Marcos Well Drilling. The base construction includes items for mobilization, well construction totaling 800 feet, a well house, and waterline construction of 300 feet. Option 1 adds a pressure tank and decommissioning of an old well. Pricing is provided on a unit price basis by construction item. The contractor is required to field verify all quantities and specifications. No further details are included regarding response dates, set asides, or other contract terms.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI Official Responses - 1.pdf | ||
| A00001 - RFIs Round 1.pdf | ||
| 1. Statement of Work.pdf | ||
| 3. Contract Drawings.pdf | ||
| 127EAW23R0042 - San Marcos Well Drilling.pdf | ||
| 5. Davis-Bacon Act WD # CA20230001.pdf | ||
| 4. Specifications.pdf | ||
| 7. RFI Form.docx | DOCX document | |
| 6. Fire Plan.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART I—THE SCHEDULE
SECTION B-- SCHEDULE OF ITEMS
B.1 SCHEDULE OF ITEMS - (BASE CONSTRUCTION)
| Item |
| Construction Items |
| Qty |
| UNIT |
| Unit Price |
| Total Price |
| 1 |
| Mobilization |
| 1 |
| EA |
| $ |
| $ |
| 2 |
| Well Construction |
| 800 |
| FT |
| $ |
| $ |
| 3 |
| Well House Construction |
| 1 |
| EA |
| $ |
| $ |
| 4 |
| Waterline Construction |
| 300 |
| FT |
| $ |
| $ |
| BASE TOTAL: |
| $___________ |
B.1 SCHEDULE OF ITEMS – OPTION 1
| Item |
| Construction Items |
| Qty |
| UNIT |
| Unit Price |
| Total Price |
| 1 |
| Pressure Tank |
| 1 |
| EA |
| $ |
| $ |
| 2 |
| Decommissioning of Old Well |
| 1 |
| EA |
| $ |
| $ |
| OPTION 1 TOTAL: |
| $___________ |
| BASE + OPTION 1 TOTAL: |
| $___________ |
B.2 SCHEDULE NOTES
* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.
NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price.