RFI Official Responses - 1.pdf
PDF 101 KB Posted
- Attached to
- 127EAW23R0042 - San Marcos Well Drilling
- Solicitation number
- 127EAW23R0042
- Issued by
-
Department of Agriculture Forest Service
About this file
This document contains responses to requests for information regarding solicitation number 127EAW23R0042 for San Marcos Well Drilling from the Department of Agriculture Forest Service. Steel casing 8 inches in diameter is required, and filter pack gravel should be slightly larger than the well screen slots, consisting of well-rounded and sorted grains to reduce drawdown and allow effective development. The site is relatively flat so no grading will be needed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A00001 - RFIs Round 1.pdf | ||
| 1. Statement of Work.pdf | ||
| 3. Contract Drawings.pdf | ||
| 127EAW23R0042 - San Marcos Well Drilling.pdf | ||
| 2. Schedule.docx | DOCX document | |
| 5. Davis-Bacon Act WD # CA20230001.pdf | ||
| 4. Specifications.pdf | ||
| 7. RFI Form.docx | DOCX document | |
| 6. Fire Plan.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR OFFICIAL USE ONLY
REQUEST FOR INFORMATION (RFI) OFFICIAL RESPONSES
127EAW23R0042 - San Marcos Well Drilling
RFI responses will be responded to as necessary in amendment format which will be posted to the solicitation via beta.SAM.gov
Telephone requests for information will not be accepted or returned.
RFI #1 – What is the size of the casing and type of material the casing is to be? ( PVC, Steel, Stainless Steel ).
USFS Response – Steel, 8 inches.
RFI #2 – Is there specific gravel packing required ?
USFS Response – filter pack (gravel pack) should ideally be slightly larger than the size of the slots in the well screen. Filter material must be clean to minimize filter pack collapse and reduce any contaminates being introduced into the well. Well-rounded and sorted grains should be used since they will reduce drawdown, increase water yield, and allow for more effective development of the water well.
RFI #3 – Any site grading that needs to be done to get the necessary equipment on site?
USFS Response – Site is relatively flat. No site grading will be needed.