2. PWS R-11 Engine Replacement.pdf

PDF 88 KB Posted

Attached to
R-11 Engine Replacement
Solicitation number
W50S78-26-Q-A006
Issued by

About this file

Performance Work Statement Summary: R-11 Engine Replacement

This is a Performance Work Statement for the replacement and installation of an engine on an R-11 fuel servicing truck. The contractor shall provide and install a new DT530 engine (531 in³/8.7L displacement, 800 lb-ft torque, Label Number 1887135C1) that is fully compatible with a 2009 International 7400 vehicle (VIN: 1HTWGADT9AJ233826, manufactured September 2009). The contractor must tow the vehicle from 1493 Billy Mitchell Boulevard and perform all engine removal, installation, and operational testing at the contractor's repair facility within a 30-mile radius. The estimated period of performance is 90 calendar days from contract award. The replacement engine must be new and seamlessly integrated with existing vehicle systems without major modifications to support reliable operation under mission-essential conditions. Following engine replacement, the government will conduct a performance check prior to acceptance. A standard one-year/100,000-mile warranty covering parts and labor is required.

The vehicle has been non-operational due to engine failure for approximately 16 months, and this work is necessary to restore mission capability. If the contractor requires on-base access to perform work, coordination with TSgt Malave (210-925-7653, Jonathan.malavevazquez@us.af.mil) is required, and the contractor must comply with all installation access requirements and security procedures. A comprehensive security agreement is mandated if performance occurs on base, including security clearance requirements, employee roster documentation, suitability investigations, security monitor appointment, and compliance with multiple DoD and Air Force security manuals and directives governing classified information handling, physical security, and information security programs.

View the file

Other files

File Type Posted
Questions and Answers - R11 Engine.pdf PDF
R11 - Picture.jpg JPG image
1. SF1449 - Solicitation R11 Engine.pdf PDF
3. SCA Wage Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

FOR

R-11 ENGINE REPLACEMENT

1.0 GENERAL

1.1 Scope

The contractor shall provide and install a replacement engine for an R-11 fuel servicing truck with the following specifications:

• Engine Family: DT530

• Displacement: 531 in³ / 8.7L

• Label Number: 1887135C1

• Torque: 800 lb-ft

The replacement engine must be new and fully compatible with the following vehicle:

• Vehicle: 2009 International 7400

• Manufacturer: Navistar International

• VIN: 1HTWGADT9AJ233826

• Date of Manufacture: September 2009

The contractor shall tow the R-11 truck from the following location:

1493 Billy Mitchell Blvd

The contractor shall provide all labor, equipment, materials, transportation, and supervision necessary to remove the existing engine and install the contractor-provided replacement engine.

1.1.1 Objectives

The objective of this requirement is to replace the engine of the R-11 fuel servicing truck, including complete installation and operational testing.

The replacement engine must be new and must be seamlessly integrated with existing vehicle systems without requiring major modifications. The engine must support reliable and continuous operation under mission-essential conditions.

After engine replacement is accomplished, the government will require a performance check prior to acceptance. Standard 1 year / 100,000 mile warranty must be included for parts and labor.

1.2 Background

This requirement is necessary to restore mission capability of a 2009 International 7400 R- 11 fuel servicing truck that has been non-operational due to engine failure for approximately 16 months.

The vehicle requires towing, engine replacement, repair, and return to operational status.

1.3 Period of Performance (PoP)

The estimated Period of Performance shall be between 90 calendar days from the date of contract award.

1.4 General Information

1.4.1 Place of Performance

All repair and installation services shall be performed at the contractor’s repair facility.

Within a 30-mile radius.

1.4.1.1 Base Access Requirements

If the contractor requires access to the installation to perform work under this requirement, the contractor shall coordinate base access sponsorship with TSgt Malave.

For installation access coordination, contact:

TSgt Malave Phone: 210-925-7653 Jonathan.malavevazquez@us.af.mil

The contractor is responsible for complying with all installation access requirements and security procedures prior to entering the base.

2. Security Agreement (SA). The contractor shall enter into a security agreement if service performance is on base. This agreement shall outline how the contractor integrates security requirements for service operations with the Air Force to ensure effective and economical operation on the installation. The agreement shall include:

a. Security support provided by the Air Force to the contractor shall include storage containers for classified information/material, use of base destruction facilities, classified reproduction facilities, use of base classified mail services, investigation of security incidents, and the use of security forms and conducting inspections required by DoDM

5220.32 Vol 1, National Industrial Security Program: Industrial Security Procedures for Government Activities, Air Force Policy Directive 16-14, Security Enterprise Governance, and Air Force Manual 16-1406, National Industrial Security Program: Industrial Security Procedures for Government Activities.

b. Security support requiring joint Air Force and contractor coordination includes packaging classified information, mailing and receiving classified materials, implementing emergency procedures for protection of classified information, security checks and internal security controls for protection of classified material and high-value pilferable property.

c. On base, the long-term installation security agreement may take the place of a Standard Practice Procedure (SPP).

2.1 Obtaining and Retrieving Identification Media.

a. DoD Common Access Card (CAC), (AFI 36-3026 Vol 2, Common Access Card), used for contracts for more than six months and requirement exists for access to the government computer systems and software. CAC applications are accomplished by Mission Partner Identity, Credential and Access Management (MP ICAM)

2.2. Security Clearance Requirements. The contractor must possess or obtain an appropriate facility security clearance prior to performing work on a classified government contract. If the contractor does not possess a facility clearance the government will request one. The government assumes costs and conducts investigations for Top Secret, Secret, and Confidential facility security clearances. The contractor shall request personnel security clearances, at the company’s expense, for employees requiring access to classified information within 15 days after receiving a facility clearance or, if the contractor is already cleared, within 15 days after service award. Due to costs involved with security investigations, requests for personnel security clearances shall be kept to the minimum amount employees required to fulfil contract requirements.

2.3. List of Employees. The contractor shall maintain a current list of employees. The list shall include employees’ names, social security number, and level of security clearance.

The list shall be validated and signed by the company Facility Security Officer (FSO) and provided to the contracting officer and Information Protection Office (IP Office) at each performance site 30 days prior to the service start date. Updated listings shall be provided when an employee's status or information changes. A Visit Request for all employees with a security clearance is required to be sent through the Defense Information System for Security (DISS) or successor system and must be updated at least annually. The contractor shall notify the Information Protection Office at each operating location 30 days before on-base performance of the service. The notification shall include:

a. Name, address, and telephone number of company key management representatives.

b. The contract number and contracting agency.

c. The highest level of classified information to which employees require access.

d. The location(s) of service performance and future performance, if known.

e. The date service performance begins.

f. Any change to information previously provided under this paragraph.

2.4. Suitability Investigations. Contractor personnel not requiring access to classified shall successfully complete, as a minimum, a Tier 1 (T1) investigation, before operating government furnished workstations. The contractor shall comply with the DoDM 5200.02, Procedures for the Department of Defense Personnel Security Program and AFI 17-130, Cybersecurity Program Management, requirements. T1 investigation requests are initiated using the Standard Form (SF) 85 and are submitted to the installation Information Protection Office through the using agency’s Security Assistant (SA). T1 investigations are different from the Wants and Warrants checks and are provided by the government at no additional cost to the contractor.

2.5. Security Monitor Appointment. The contractor shall appoint a security representative for the on-based long-term visitor group. The security representative may be in full-time position or an additional duty position. The security representative shall work with the host organization to provide employees with training required by DoDM 5200.01, Information Security Program, AFPD 16-14, Security Enterprise Governance, and AFI 16-1404, Air Force Information Security Program. The contractor shall provide initial and follow-on training to contractor personnel who work in Air Force controlled/restricted areas. Air Force restricted and controlled areas are explained in AFI 31-101, Integrated Defense.

2.6. Additional Security Requirements. In accordance with DoDM 5200.01, Information Security Program and AFMAN 16-1404, the contractor shall comply with local communications squadron policy.

2.7. Freedom of Information Act Program (FOIA). The contractor shall comply with DoD Manual 5400.07_AFMAN33-302, DoD Freedom of Information Act Program, requirements.

2.8. Physical Security. Areas controlled by contractor employees shall comply with AFI 31-101

File details come from the government source that posted it. Updated .