The file contains detailed construction plans for the Chambers Creek Trail Bridge Repair project in the Plumas National Forest, Mt. Hough Ranger District. The project involves removing an existing steel truss bridge with lead paint contamination and replacing it with a new prefabricated steel trail bridge. The construction plans include 10 technical sheets covering project control, trail plan and profile, demolition, bridge general layout, foundation details, abutment specifics, and drainage and backfill requirements.
Key technical specifications include a 60-foot bridge span, pedestrian and equestrian loading design, snow load of 310 PSF, seismic parameters from a December 2024 foundation report, and specific requirements for concrete, reinforcing steel, and bridge installation. The project will require careful lead paint containment, helicopter transport of materials, and precise abutment retrofitting. The bridge will have IPE hardwood decking, running boards, and rub rails, with native backfill and drainage systems integrated into the abutment design.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE, PACIFIC SOUTHWEST REGION
PLUMAS NATIONAL FOREST
MT. HOUGH RANGER DISTRICT
PLUMAS COUNTY
CONSTRUCTION PLANS FOR:
CHAMBERS CREEK
TRAIL BRIDGE REPAIR
VICINITY MAP &
ENGINEERS
PLANNERS
SURVEYORS
PROJECT
LOCATION
3/
/2
:3
JU
ST
IN
.L U
M
PK
IN
C
:\D
JA
-P W
W O
R K\
D
JA
-P R
O D
\D M
S4
\7
5.
C
H
AM
BE
R
S C
R
EE
K
TR
AI
L
BR
ID
G E
C O
VE
R
.D W
G
T24N T25N
CHAMBERS CREEK TRAIL
LATITUDE: 39.965435
LONGITUDE: -121.30827
R 6E
R 5E
Crescent City Yreka
Mount Shasta
REDDING
Eureka
Chico
Lake South Tahoe
SACRAMENTOSanta Rosa
Stockton OaklandSAN FRANCISCO
Mammoth Lakes
SAN JOSE
APPROVED:
DATEDEPUTY FOREST SUPERVISOR
PLUMAS NATIONAL FOREST
DATEREGIONAL DIRECTOR OF ENGINEERING
APPROVED:
USFS REGION 5
DATEREGIONAL BRIDGE ENGINEER
USFS REGION 5
RECOMMENDED:
R-1754
REGIONAL APPROVAL:
FOREST APPROVAL:INDEX TO SHEETS
NO. DESCRIPTION
1 COVER
2 SUMMARY OF QUANTITIES AND GENERAL
NOTES
3 PROJECT CONTROL
4 TRAIL PLAN & PROFILE
5 DEMOLITION PLAN
6 BRIDGE GENERAL LAYOUT
7 FOUNDATION PLAN
8 - 9 ABUTMENT DETAILS
10 BACKFILL AND DRAINAGE DETAILS
PROJECT
LOCATION
POTENTIAL
STAGING AREA*
*NOTE: FINAL STAGING AREA WILL BE DETERMINED BY THE CO.
3/14/2025
AQ = ACTUAL QUANTITY, CQ = CONTRACT QUANTITY (SEE SECTION 109.02(B) OF THE STANDARD SPECIFICATIONS)
ITEM NO. ITEM DESCRIPTION
MEASUREMENT
QTY COMMENTS
METHOD UNIT
15101 MOBILIZATION LSQ LUMP SUM ALL
15201 CONSTRUCTION SURVEY AND STAKING, METHOD 1, TOLERANCE A LSQ LUMP SUM ALL
15713 SOIL EROSION AND POLLUTION CONTROL LSQ LUMP SUM ALL
20301 REMOVAL OF EXISTING BRIDGE, DISPOSAL METHOD A AND D LSQ LUMP SUM ALL
21001 TRAIL EXCAVATION AND EMBANKMENT CONSTRUCTION CQ CUBIC YARD 2 IN PLACE QUANTITY, NOT ADJUSTED FOR SHRINK/SWELL. INCLUDES EMBANKMENT MATERIAL BEHIND
BACKWALL AND BETWEEN WINGWALLS AT ABUTMENT 2.
55201 STRUCTURAL CONCRETE, CLASS A(AE), PEDESTAL & BACKWALL
EXTENSION CQ CUBIC YARD 1.5 INCLUDES REINFORCING STEEL AND 2" STD GALVANIZED WEEPHOLE DRAIN PIPE
55701 STRUCTURAL TIMBER AND LUMBER, DOUG FIR-LARCH, NO. 2 OR
BETTER RUNNING BOARDS CQ MBF 0.6
56314 LEAD PAINT CONTAINMENT LSQ LUMP SUM ALL
57101 STEEL PREFABRICATED BRIDGE SUPERSTRUCTURE, DESIGN,
FABRICATE, TRANSPORT, AND INSTALL LSQ LUMP SUM ALL
60501 STANDARD UNDERDRAIN SYSTEM CQ LINEAR FOOT 5 INCLUDES NONWOVEN GEOTEXTILE, COMMERCIALLY SOURCED GRANULAR BACKFILL, AND PERFORATED
PIPE. SEE SHEET 10.
62200 TRANSPORTATION OF MATERIALS & EQUIPMENT TO SITE LSQ LUMP SUM ALL
SUMMARY OF ESTIMATED QUANTITIES
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
FOREST SERV I CE
DEPA R TMENT OF AGR I CU LT
UR
E
3/
/2
:5
JU
ST
IN
.L U
M
PK
IN
C
:\D
JA
-P W
W O
R K\
D
JA
-P R
O D
\D M
S4
\7
5.
C
H
AM
BE
R
S C
R
EE
K
TR
AI
L
BR
ID
G E
- D
ES
IG
N
.D W
G
REGION 5
PACIFIC SOUTHWEST REGION
CHAMBERS CREEK
BRIDGE REPAIR
PLUMAS
NATIONAL FOREST
SUMMARY OF
QUANTITIES AND
GENERAL NOTES
Mar-25
A. WRIGHT
J. LUMPKIN
J. ROSKE
7425.02
10 2
MT. HOUGH
RANGER DISTRICT
MATERIAL NOTESGENERAL NOTES
BRIDGE DESIGN: THIS STRUCTURE IS DESIGNED FOR PEDESTRIAN AND EQUESTRIAN LOADING IN ACCORDANCE WITH AASHTO GUIDE SPECIFICATIONS FOR THE DESIGN OF PEDESTRIAN BRIDGES AND AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, 9TH EDITION WITH CURRENT INTERIMS, AND SNOW AND RECREATIONAL LOADS IN
ACCORDANCE WITH THE FOREST SERVICE HANDBOOK.
SNOW LOAD: 310 PSF PER USFS
SEISMIC: SEISMIC PARAMETERS PER FOUNDATION REPORT BY BLACKBURN CONSULTANTS DATE DECEMBER 2024.
SITE CLASS = A
SS = 0.787 G HORIZONTAL RESPONSE SPECTRAL ACCELERATION COEFFICIENT AT 0.2-SEC PERIOD S1 = 0.295 G HORIZONTAL RESPONSE SPECTRAL ACCELERATION COEFFICIENT AT 1-SEC PERIOD
FA = 0.8 SITE FACTOR FOR SHORT-PERIOD RANGE OF ACCELERATION RESPONSE SPECTRUM
FV = 0.8 SITE FACTOR FOR LONG-PERIOD RANGE OF ACCELERATION RESPONSE SPECTRUM
SDS = 0.420 G HORIZONTAL RESPONSE SPECTRAL ACCELERATION COEFFICIENT AT 0.2-S PERIOD MODIFIED BY SHORT-PERIOD SITE FACTOR SMS = 0.630 G ADJUSTED MCE SPECTRAL RESPONSE ACCELERATION COEFFICIENT AT 0.2-S PERIOD MODIFIED BY SHORT-PERIOD SITE FACTOR SM1 = 0.236 G ADJUSTED MCE SPECTRAL RESPONSE ACCELERATION COEFFICIENT AT 1.0-S PERIOD MODIFIED BY LONG-PERIOD SITE FACTOR SD1 = 0.157 G HORIZONTAL RESPONSE SPECTRAL ACCELERATION COEFFICIENT AT 1.0-S PERIOD MODIFIED BY LONG-PERIOD SITE FACTOR
TL = 16 SEC LONG PERIOD TRANSITION PERIOD
PGA = 0.34 G PEAK GROUND ACCELERATION
PGAM = 0.272 G MODIFIED PEAK GROUND ACCELERATION
SPECIFICATIONS: CONSTRUCT THE PROJECT IN COMPLIANCE WITH FEDERAL HIGHWAY ADMINISTRATION STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROAD AND BRIDGES ON FEDERAL HIGHWAY PROJECTS (FP-14) AND APPLICABLE FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS (FSSS).
EROSION CONTROL PLAN: SUBMIT A SOIL EROSION AND SEDIMENT CONTROL PLAN TO THE CONTRACTING OFFICER FOR APPROVAL AT LEAST FOURTEEN (14) DAYS PRIOR TO BEGINNING WORK. SEE SECTION 157 OF THE SUPPLEMENTAL SPECIFICATIONS FOR DETAILS.
DISPOSAL: ALL MATERIALS DESIGNATED FOR REMOVAL BECOME THE PROPERTY OF THE CONTRACTOR AND ARE TO BE DISPOSED OF BY REMOVING FROM THE FOREST IN AN ENVIRONMENTALLY SAFE MANNER IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL REQUIREMENTS.
LEAD CONTAMINATED STEEL DISPOSAL PLAN: DISPOSE OF LEAD CONTAMINATED STEEL ACCORDING TO FP-14 SECTION 203.05(D). SUBMIT A DETAILED DISPOSAL PLAN TO THE CONTRACTING OFFICER FOR APPROVAL AT LEAST FOURTEEN (14) DAYS PRIOR TO BEGINNING WORK.
TEMPORARY TRAFFIC CONTROL: SUBMIT A TEMPORARY TRAFFIC CONTROL PLAN TO THE CONTRACTING OFFICER FOR APPROVAL AT LEAST 30 DAYS PRIOR TO
INTENDED USE.
HELICOPTER TRANSPORT: IT IS ASSUMED THAT HELICOPTER TRANSPORT EFFORTS WILL BE NECESSARY FOR THE CONSTRUCTION OF THIS PROJECT. THE STAGING AREA OF MATERIALS AND EQUIPMENT FOR THE HELICOPTER TRANSPORTATION IS ASSUMED TO BE WITHIN ONE MILE OF THE BRIDGE SITE. THE FINAL STAGING SITE IS TO BE COORDINATED WITH CO. SUBMIT A PLAN TO THE CO FOR APPROVAL THAT INCLUDES, AT A MINIMUM, THE FOLLOWING: HELICOPTER SPECIFICATION AND LOAD CAPACITY, CONSTRUCTION MATERIALS AND/OR EQUIPMENT THAT WILL BE HAULED, AND A DETAILED SEQUENCE OF THE TRANSPORTATION OF THE ITEMS. MODIFY PLAN TO FIT CHOSEN METHODS IF CONTRACTOR ELECTS TO USE METHODS OTHER THAN HELICOPTER TRANSPORT.
CONCRETE: USE CLASS A(AE) FOR ALL CAST-IN-PLACE CONCRETE WITH
F'C = 4500 PSI AT 28 DAYS AND AN ENTRAINED AIR CONTENT PER THE
STANDARD SPECIFICATIONS. FINISH ALL ELEMENTS WITH A CLASS 2-
RUBBED FINISH. MAKE ALL CONCRETE IN ACCORDANCE WITH AN
APPROVED MIX DESIGN. CHAMFER ALL EXPOSED EDGES OF CONCRETE
3/4" AND FILLET ALL ACUTE ANGLES 3" UNLESS OTHERWISE NOTED.
REINFORCING STEEL: USE NON-PRESTRESSED REINFORCING OF THE
DEFORMED TYPE CONFORMING TO AASHTO M31 (ASTM A615), GRADE 60.
CONCRETE COVER SHALL BE AS SHOWN; WHERE NOT SHOWN IT SHALL
CONFORM TO AASHTO. CUT AND BEND STEEL IN ACCORDANCE WITH ACI
315. CUT BARS ON-SITE TO ENSURE LENGTHS ARE ADEQUATE FOR
REQUIRED EMBEDMENT INTO EXISTING CONCRETE AND BEDROCK.
CONNECTIONS: ADHESIVE ANCHORS (AA): SIMPSON "SET-3G ADHESIVE"
WITH REINFORCING BARS (CODE REPORT NO. ESR-4057) OR APPROVED
EQUAL.
CP-102
CP-103
CP-105
CP-107
CP-106
603570
35903600
36303640
3680369037003710372037303740375037603770
37803790
37603770
CP-104
POINT TABLE
POINT #
NORTHING
1871567.17
1871478.55
1871510.49
1871509.19
1871537.79
1871453.46
EASTING
6755456.16
6755449.48
6755441.69
6755488.75
6755477.89
6755472.82
ELEVATION
3684.98
3670.30
3658.84
3658.30
3669.77
3677.06
DESCRIPTION
REBAR&CAP
60D NAIL
PAINT X
PAINT X
60D NAIL
60D NAIL
EXISTING
BRIDGE
TO TRAILHEAD
FLOW
PROJECT CONTROL
SCALE: 1" = 60'
CONTROL POINTS
DATE SURVEYED: 10/23/2024
COORDINATE SYSTEM: NAD83, (2011) EPOCH 2017.5, NAVD88, GEOID 18. CALIFORNIA
COORDINATE SYSTEM ZONE 1
EXISTING EDGE OF WATER
MAJOR CONTOUR (10')
MINOR CONTOUR (2')
EXISTING BRIDGE
LEGEND
EXISTING FEATURES
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
FOREST SERV I CE
DEPA R TMENT OF AGR I CU LT
UR
E
3/
/2
:5
JU
ST
IN
.L U
M
PK
IN
C
:\D
JA
-P W
W O
R K\
D
JA
-P R
O D
\D M
S4
\7
5.
C
H
AM
BE
R
S C
R
EE
K
TR
AI
L
BR
ID
G E
- D
ES
IG
N
.D W
G
REGION 5
PACIFIC SOUTHWEST REGION
CHAMBERS CREEK
BRIDGE REPAIR
PLUMAS
NATIONAL FOREST
PROJECT
CONTROL
Mar-25
A. WRIGHT
J. LUMPKIN
J. ROSKE
7425.02
10 3
MT. HOUGH
RANGER DISTRICT
WATERFALL
TO PEAK
N
EXISTING BRIDGE
ABUTMENT, TYP.
EXISTING CONCRETE
SPREAD FOOTINGS,
TYP
CP-105
CP-106
1+00
PI
: 1
+2 0.
PI: 1
+58.23
PI: 0+51.20
CP-104
0+30 1+00 1+40
C R
EE
K
C H
AM
BE
R S
TRAIL NOTES:
1. PROVIDE TRAIL EMBANKMENT FILL AT BRIDGE
APPROACHES TO MATCH TRAIL GRADE WITH ABUTMENT
BACKWALL ELEVATION. SEE FSSS SECTION 210.
2. MINOR EXCAVATION FOR ABUTMENT RETROFIT IS
INCIDENTAL TO ABUTMENT ITEMS.
3. LEAD PAINT ON EXISTING TRAIL BRIDGE MUST BE
CONTAINED PER FP-14 SECTION 563.05.
PLAN
SCALE IN FEET
0 5 10
CONTOUR INTERVAL = 2'
(PLOT SIZE = 11" x 17")
N
PROFILE
EXISTING BRIDGE
ABUTMENT 1
EXISTING BRIDGE
ABUTMENT 2
REMOVE AND DISPOSE
EXISTING BRIDGE,
SEE SHEET 5
NEW PREFABRICATED
STEEL TRAIL BRIDGE,
SEE SHEET 6
EXISTING
CENTERLINE TRAIL
EXISTING BRIDGE
ABUTMENT 1
EXISTING BRIDGE
ABUTMENT 2
NEW PREFABRICATED
STEEL TRAIL BRIDGE,
SEE SHEET 6
EXISTING GROUND AT
CENTERLINE TRAIL
ABUTMENT RETROFIT,
TYP. SEE SHEET 7
ABUTMENT RETROFIT,
TYP. SEE SHEET 7
EXISTING EDGE OF WATER
MAJOR CONTOUR (10')
MINOR CONTOUR (2')
EXISTING BRIDGE
LEGEND
EXISTING FEATURES
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
FOREST SERV I CE
DEP A R TMENT OF AGR I CU LT
UR
E
3/
/2
:5
JU
ST
IN
.L U
M
PK
IN
C
:\D
JA
-P W
W O
R K\
D
JA
-P R
O D
\D M
S4
\7
5.
C
H
AM
BE
R
S C
R
EE
K
TR
AI
L
BR
ID
G E
- D
ES
IG
N
.D W
G
REGION 5
PACIFIC SOUTHWEST REGION
CHAMBERS CREEK
BRIDGE REPAIR
PLUMAS
NATIONAL FOREST
TRAIL PLAN &
PROFILE
Mar-25
A. WRIGHT
J. LUMPKIN
J. ROSKE
7425.02
10 4
MT. HOUGH
RANGER DISTRICT
BACKFILL BETWEEN WINGWALLS
WITH NATIVE BACKFILL
EXISTING BRIDGE
ABUTMENT 1
EXISTING BRIDGE
ABUTMENT 2
EXISTING STEEL TRUSS TO
BE REMOVED.
EXISTING GROUND AT
CENTERLINE TRAIL
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
FOREST SERV I CE
DEP A R TMENT OF AGR I CU LT
UR
E
3/
/2
:5
JU
ST
IN
.L U
M
PK
IN
C
:\D
JA
-P W
W O
R K\
D
JA
-P R
O D
\D M
S4
\7
5.
C
H
AM
BE
R
S C
R
EE
K
TR
AI
L
BR
ID
G E
- D
ES
IG
N
.D W
G
REGION 5
PACIFIC SOUTHWEST REGION
CHAMBERS CREEK
BRIDGE REPAIR
PLUMAS
NATIONAL FOREST
DEMOLITION PLAN
Mar-25
A. WRIGHT
J. LUMPKIN
J. ROSKE
7425.02
10 5
MT. HOUGH
RANGER DISTRICTEXISTING BRIDGE REMOVAL
NOT TO SCALE
BRIDGE REMOVAL NOTES:
1. EXISTING STEEL TRUSS CONTAINS LEAD PAINT. HAZARDOUS MATERIAL
MUST BE CONTAINED AND DISPOSED OF ACCORDING TO ALL RELEVANT
LOCAL,STATE, AND FEDERAL REGULATIONS.
2. PREPARE A BRIDGE REMOVAL AND DISPOSAL PLAN IN ACCORDANCE WITH
FP-14 SECTION 203 AND SUBMIT TO CO FOR APPROVAL. DESCRIBE THE
STEPS THAT WILL BE TAKEN TO ENSURE THAT LEAD CONTAMINATION
WILL BE CONTAINED THROUGHOUT THE PROCESS, INCLUDING
PRECAUTIONS FOR LIFTING AND HANDLING STEEL ON SITE.
3. TRANSPORT AND DISPOSE OF LEAD PAINT CONTAMINATED STEEL PER
FP-14 SECTION 203.05(D).
4. FOR CONTRACTOR INFORMATION: EXISTING BRIDGE STEEL TRUSS
WEIGHS APPROXIMATELY 6600 LBS ACCORDING TO ORIGINAL USFS
CONSTRUCTION DRAWINGS DATED 2-10-1966.
TRUSS TO BE REMOVED
NOT FOR
CONSTRUCTION
CONTRACTOR SUBMITTAL AND
APPROVAL BY CO REQUIRED
PER FP-14 SECTION 203
365036
PLAN
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
FOREST SERV I CE
DEPA R TMENT OF AGR I CU LT
UR
E
3/
/2
:5
JU
ST
IN
.L U
M
PK
IN
C
:\D
JA
-P W
W O
R K\
D
JA
-P R
O D
\D M
S4
\7
5.
C
H
AM
BE
R
S C
R
EE
K
TR
AI
L
BR
ID
G E
- D
ES
IG
N
.D W
G
REGION 5
PACIFIC SOUTHWEST REGION
CHAMBERS CREEK
BRIDGE REPAIR
PLUMAS
NATIONAL FOREST
BRIDGE GENERAL
LAYOUT
Mar-25
A. WRIGHT
J. LUMPKIN
J. ROSKE
7425.02
10 6
MT. HOUGH
RANGER DISTRICT
BRIDGE TYPICAL SECTION
SCALE: 1/2" = 1'-0"
CENTERLINE TRAIL
CENTERLINE STRUCTURE
STEEL TRUSS,
TYP.
3'-0" 3'-0"
6'-0" TRAIL
4' -6
TOE PLATE,
TYP.
RUB RAIL,
TYP.
PROVIDE MODULAR DESIGN W/
DECK ASSEMBLY IN THE FIELD AS
REQUIRED FOR TRANSPORTATION.
EXISTING GROUND AT
CENTERLINE TRAIL
NEW PREFABRICATED
STEEL TRAIL BRIDGE
ELEVATION
SCALE: 1" = 10'
CENTERLINE BRG.
ABUTMENT 2
BRG STA = 1+14.05
BRG EL = 3670.19
4.7'
FREEBOARD
EXISTING CONCRETE
ABUTMENT, TYP.
60'-0"
CL BEARING TO CL BEARING
FIX EXP
Q100= *
HYDRAULIC DATA:
Q2 = 348 CFS
AVG. DEPTH = 5.9'
BANKFULL WIDTH = 27.3'±
Q100 = 1960 CFS
AVG. DEPTH = 11.7'
Q100* = 3663.60' AT UPSTREAM
EDGE OF BRIDGE
CENTERLINE BRG.
ABUTMENT 1
BRG STA = 0+54.05
BRG EL = 3670.19
SCALE IN FEET
0 5 10
CONTOUR INTERVAL = 2'
(PLOT SIZE = 11" x 17")
NC
R
EEK
C H
AM
BER
S
CENTERLINE TRAILNEW PREFABRICATED
STEEL TRAIL BRIDGE
60'-4"
OUT-TO-OUT TRUSS LENGTH
1+00
CP-104
CP-106CP-103
PT: 0+51.20
ABUTMENT RETROFIT,
TYP. SEE SHEET 7
REMOVE AND DISPOSE
EXISTING TRAIL BRIDGE,
SEE SHEET 5
IPE HARDWOOD
DECKING
NATIVE BACKFILL,
SEE SHEET 4
(5) 2X12 S4S
#2 OR BETTER
DOUG FIR-LARCH
RUNNING BOARDS
CP-105
CP-106
1+00
PI
: 1
+2 0.
PI: 0+51.20
CP-104
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
FOREST SERV I CE
DEPA R TMENT OF AGR I CU LT
UR
E
3/
/2
:5
JU
ST
IN
.L U
M
PK
IN
C
:\D
JA
-P W
W O
R K\
D
JA
-P R
O D
\D M
S4
\7
5.
C
H
AM
BE
R
S C
R
EE
K
TR
AI
L
BR
ID
G E
- D
ES
IG
N
.D W
G
REGION 5
PACIFIC SOUTHWEST REGION
CHAMBERS CREEK
BRIDGE REPAIR
PLUMAS
NATIONAL FOREST
FOUNDATION
PLAN
Mar-25
A. WRIGHT
J. LUMPKIN
J. ROSKE
7425.02
10 7
MT. HOUGH
RANGER DISTRICT
SCALE IN FEET
0 5 10
CONTOUR INTERVAL = 2'
(PLOT SIZE = 11" x 17")
N
PLAN
A
BEARING CAP DETAIL
DOWNSTREAM
END
EXISTING
GROUND
UPSTREAM
END
ABUTMENT 1 LT SHOWN
OTHERS SIMILAR
ABUTMENT SECTION
EXISTING
GROUND
DOWNSTREAM
END
UPSTREAM
END
EXISTING CONCRETE
ABUTMENTS, TYP
ST
A
0+
.0
C /L
B R
G . A
BU
T.
60'-0"
CL BEARING TO CL BEARING
ST
A
1+
.0
C /L
B R
G . A
BU
T.
C R
EEK
C H
AM
BER
S
CENTERLINE TRAIL
ABUTMENT 2
SCALE: 1" = 5'
LOOKING AHEAD
ON-LINE
ABUTMENT 1
SCALE: 1" = 5'
LOOKING BACK
ON-LINE
EXISTING CONCRETE
ABUTMENT
CONCRETE PEDESTAL
EXTENSION, TYP.
SEE DETAIL SHEET 8
1'-4"+/-
1'-15 8"+/-
1'-9"1'-9"
1'-11"+/-
EXISTING CONCRETE
ABUTMENT
CONCRETE PEDESTAL
EXTENSION, TYP.
SEE DETAIL SHEET 9
6'-1"+/- 4'-103
4"+/-
1'-9" 1'-9"
1'-11"+/-
4'-6"
1'-11"+/-
A
PREFABRICATED
STEEL TRAIL BRIDGE
EXISTING BRIDGE
ABUTMENT
1. DOWEL INTO EXISTING CONCRETE AND BEDROCK AND ATTACH BARS
WITH ADHESIVE ANCHORS. SEE SHEETS 8 - 9 FOR DETAILS.
2. DIMENSIONS PROVIDED BASED ON ASSUMED BACKWALL HEIGHT OF
1'-11". CAST PEDESTAL EXTENSIONS TO HEIGHT REQUIRED TO SET THE
TOP OF THE BRIDGE DECK EVEN WITH THE TOP OF THE BACKWALL AT
THE END OF THE BRIDGE.
3. THE SUBSTRUCTURE IS DESIGNED FOR THE FOLLOWING PARAMETERS
OUTLINED IN PAGE 7 OF THE GEOTECHNICAL REPORT.
BEARING RESISTANCE FACTOR = 0.45
FACTORED BEARING RESISTANCE = 20,000 PSF
FOUNDATION NOTES
CAP WALL, SEE
DETAIL SHEET 9
ADHESIVE ANCHORS,
TYP.
TOP OF EXISTING
BACKWALL
BEARING LEDGE
CAP
EXISTING BEDROCK
VARIES, SEE DETAIL
THIS SHEET60'-10"
EXISTING BACKWALL TO EXISTING BACKWALL
NEW BEARING
LEDGE CAP
NEW BEARING
LEDGE CAP
NEW BACK
WALL AND CAP
NEW BEARING
LEDGE CAP
NEW BEARING
LEDGE CAP
(2) 1"Ø ANCHOR
BOLTS TYP EA
BEARING, SEE
SHEETS 8 - 9
RUNNING BOARD
DECK
EL 3668.27
BEARING
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
FOREST SERV I CE
DEP AR TMENT OF AGR I CU LT
UR
E
3/
/2
:5
JU
ST
IN
.L U
M
PK
IN
C
:\D
JA
-P W
W O
R K\
D
JA
-P R
O D
\D M
S4
\7
5.
C
H
AM
BE
R
S C
R
EE
K
TR
AI
L
BR
ID
G E
- D
ES
IG
N
.D W
G
REGION 5
PACIFIC SOUTHWEST REGION
CHAMBERS CREEK
BRIDGE REPAIR
PLUMAS
NATIONAL FOREST
ABUTMENT
DETAILS
Mar-25
A. WRIGHT
J. LUMPKIN
J. ROSKE
7425.02
10 8
MT. HOUGH
RANGER DISTRICT
ABUTMENT 1 PLAN
SCALE: 1/2" = 1'-0"
ABUTMENT 1 DOWNSTREAM FOOTING
SCALE: 1/2" = 1'-0"
(2) #5 "U2" BARS AT
12" OC MAX VERT
SPACING. EMBED
INTO (E) CONCRETE
WITH AA (6" EFF
EMBED), TYP.
CONCRETE PEDESTAL
EXTENSION WITH (4) #6
VERT BARS @
CORNERS. EMBED INTO
(E) CONCRETE WITH AA
(12" EFF EMBED)
8"
2"
ABUTMENT 1 ELEVATION
SCALE: 1/2" = 1'-0"
ABUTMENT 1 UPSTREAM FOOTING
SCALE: 1/2" = 1'-0"
(1) #5 "U1" BAR.
EMBED INTO (E)
CONCRETE WITH AA
(6" EFF EMBED)
8"
2"
CONCRETE PEDESTAL
EXTENSION WITH (4) #6
VERT BARS @
CORNERS. EMBED INTO
(E) CONCRETE WITH AA
(12" EFF EMBED)
CONCRETE NOTES:
1. ALL REBAR DIMENSIONS ARE FOR ESTIMATING PURPOSES ONLY. CUT BARS ON SITE TO ENSURE
PROPER FITMENT.
2. EMBED ALL BARS INTO EXISTING CONCRETE WITH ADHESIVE ANCHORS WITH 6" OR 12" EFFECTIVE
EMBEDMENT AS NOTED.
3. PROVIDE 11
2" CLEAR COVER TO REBAR UNLESS DIMENSIONED OTHERWISE.
4. DIMENSIONS TO TOP OF PEDESTAL EXTENSIONS ARE APPROXIMATE. EXTEND CONCRETE PEDESTALS
TO ELEVATION REQUIRED FOR BRIDGE VERTICAL ALIGNMENT WITH EXISTING BACKWALL.
5. ANCHOR PLATE AND BRIDGE BEARING ASSEMBLY BY BRIDGE MANUFACTURER. ANCHOR BOLT
LOCATION DIMENSIONS ARE TYPICAL EACH SIDE AND ASSUMED FOR DETAILING PURPOSES. CONFIRM
ANCHOR BOLT PLACEMENT WITH MANUFACTURER'S DESIGN.
1' -1
5 8" +
1' -4
8" 43
8"43 8" 43
8"
(2) #5 "U2" BARS AT
12" OC MAX VERT
SPACING. EMBED
INTO (E) CONCRETE
WITH AA (6" EFF
EMBED), TYP.
8"
2"
1'-9" 1'-9"
1' -6
1' -6
51 2" 61 2"
6"
(2) 1"Ø ASTM F1554 GR.
105 ANCHOR BOLTS W/
10" EMBED OR (2) 1"Ø
ASTM F1554 GR. 105
ADHESIVE ANCHORS
W/ 10" EFF EMBED
1'-9" 1'-9"
6"
6"
2"
EL 3668.27
BEARING
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
FOREST SERV I CE
DEPA R TMENT OF AGR I CU LT
UR
E
3/
/2
:5
JU
ST
IN
.L U
M
PK
IN
C
:\D
JA
-P W
W O
R K\
D
JA
-P R
O D
\D M
S4
\7
5.
C
H
AM
BE
R
S C
R
EE
K
TR
AI
L
BR
ID
G E
- D
ES
IG
N
.D W
G
REGION 5
PACIFIC SOUTHWEST REGION
CHAMBERS CREEK
BRIDGE REPAIR
PLUMAS
NATIONAL FOREST
ABUTMENT
DETAILS
Mar-25
A. WRIGHT
J. LUMPKIN
J. ROSKE
7425.02
10 9
MT. HOUGH
RANGER DISTRICT
ABUTMENT 2 PLAN
SCALE: 3/8" = 1'-0"
ABUTMENT 2 DOWNSTREAM FOOTING
SCALE: 3/8" = 1'-0"
ABUTMENT 2 ELEVATION
SCALE: 3/8" = 1'-0"
ABUTMENT 2 UPSTREAM FOOTING
SCALE: 3/8" = 1'-0"
CONCRETE PEDESTAL
EXTENSION WITH (4) #6
VERT BARS @
CORNERS. EMBED INTO
(E) CONCRETE WITH AA
(12" EFF EMBED)
8"
6' -1
8"43
8"43 8"
4' -1
03 4" +
(2) #5 "U2" BARS AT 12" OC
MAX VERT SPACING. EMBED
INTO (E) CONCRETE WITH
AA (6" EFF EMBED), TYP.
CONCRETE PEDESTAL
EXTENSION WITH (4) #6
VERT BARS @
CORNERS. EMBED INTO
(E) CONCRETE WITH AA
(12" EFF EMBED)
8"
2"
(2) #5 "U2" BARS AT 12" OC
MAX VERT SPACING. EMBED
INTO (E) CONCRETE WITH
AA (6" EFF EMBED), TYP.
8"
2"
(6) #5 "U1" BARS AT 12" OC
MAX VERT SPACING. EMBED
INTO (E) CONCRETE WITH
AA (6" EFF EMBED)
8"
2"
(5) #5 "U1" BARS AT 12" OC
MAX VERT SPACING. EMBED
INTO (E) CONCRETE WITH
AA (6" EFF EMBED)
8"
2"
0'-6" BACKWALL WITH #5 BARS
AT 12" OC MAX VERT AND
HORIZ. EMBED W/ AA INTO (E)
CONCRETE (6" EFF EMBED)
AND INTO BEDROCK (12" EFF
EMBED)
UNDERDRAIN
PERFORATED PIPE BEHIND
WALL, SEE SHEET 10.
2" Ø STD GALV PIPE
WEEPHOLE DRAIN
0'-6" CAP SLAB WITH #5 BARS AT 12"
OC MAX EACH WAY. EMBED W/ AA
INTO (E) CONCRETE (6" EFF EMBED).
SLAB TO BE CONSTRUCTED AFTER
MATERIAL BACKFILL BEHIND
CONCRETE BACKWALL. SEE SHEET 10.
1'-9" 4'-6" 1'-9"
1' -6
CONCRETE NOTES:
1. ALL REBAR DIMENSIONS ARE FOR ESTIMATING PURPOSES ONLY. CUT BARS ON SITE TO ENSURE PROPER
FITMENT.
2. EMBED ALL BARS INTO EXISTING CONCRETE WITH ADHESIVE ANCHORS WITH 6" OR 12" EFFECTIVE EMBEDMENT
AS NOTED.
3. PROVIDE 11
2" CLEAR COVER TO REBAR UNLESS DIMENSIONED OTHERWISE.
4. DIMENSIONS TO TOP OF PEDESTAL EXTENSIONS ARE APPROXIMATE. EXTEND CONCRETE PEDESTALS TO
ELEVATION REQUIRED FOR BRIDGE VERTICAL ALIGNMENT WITH EXISTING BACKWALL.
5. ANCHOR PLATE AND BRIDGE BEARING ASSEMBLY BY BRIDGE MANUFACTURER. ANCHOR BOLT LOCATION
DIMENSIONS ARE TYPICAL EACH SIDE AND ASSUMED FOR DETAILING PURPOSES. CONFIRM ANCHOR BOLT PLACEMENT WITH MANUFACTURER'S DESIGN. ENSURE SLOTTED BOLT HOLES ARE PROVIDED AT ABUTMENT 2.
1'-11 2"
51 2" 61 2"
6"
NOTE: UNDERDRAIN PERFORATED PIPE
BEHIND WALL NOT SHOWN FOR CLARITY.
SEE SHEET 10 FOR DRAINAGE AND
BACKFILL REQUIRED AT ABUTMENT 2
8'-0"
45 8"
6"
6"
6"
(2) 1"Ø ASTM F1554 GR.
105 ANCHOR BOLTS W/
10" EMBED OR (2) 1"Ø
ASTM F1554 GR. 105
ADHESIVE ANCHORS
W/ 10" EFF EMBED
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
FOREST SERV I CE
DEPA R TMENT OF AGR I CU LT
UR
E
3/
/2
:5
JU
ST
IN
.L U
M
PK
IN
C
:\D
JA
-P W
W O
R K\
D
JA
-P R
O D
\D M
S4
\7
5.
C
H
AM
BE
R
S C
R
EE
K
TR
AI
L
BR
ID
G E
- D
ES
IG
N
.D W
G
REGION 5
PACIFIC SOUTHWEST REGION
CHAMBERS CREEK
BRIDGE REPAIR
PLUMAS
NATIONAL FOREST
BACKFILL AND
DRAINAGE
DETAILS
Mar-25
A. WRIGHT
J. LUMPKIN
J. ROSKE
7425.02
10 10
MT. HOUGH
RANGER DISTRICT
ABUTMENT 2 DRAINAGE AND BACKFILL SECTION
SCALE: 1" = 16'
PEDESTAL EXTENSION,
TYP. SEE SHEET 9
2' -0
" M
AX
-2% MIN
ABUTMENT 2 DRAINAGE AND BACKFILL SECTION
SCALE: 1" = 16'
VERTICAL LAYER 3/4"
GRANULAR BACKFILL,
12" MIN THICKNESS
NATIVE BACKFILL
MATERIAL
4" MINIMUM DIAMETER
PERFORATED PIPE
STD 2" GALVANIZED STEEL
WEEPHOLE PIPE
-2% MIN
NONWOVEN GEOTEXTILE
FILTER FABRIC, MIRAFI
140N OR EQUIVALENT
WRAP PER "FOUNDATION
REPORT"
2' -0
" M
AX
CAP SLAB, SEE SHEET 9 CAP SLAB, SEE SHEET 9
BACKWALL,
SEE SHEET 9
EXISTING GROUND
1'-0" MIN.
EXISTING
ABUTMENT 2, TYP.
CONSTRUCTION JOINT
DRAINAGE AND BACKFILL NOTES:
1) BASED ON "FOUNDATION REPORT: CHAMBERS CREEK BRIDGE REPLACEMENT"
(DECEMBER 2024), PREPARED BY BLACKBURN CONSULTING. REFER TO THIS REPORT
FOR ADDITIONAL INFORMATION.
2) CONCRETE WALL REINFORCEMENT NOT SHOWN FOR CLARITY. SEE SHEET 9 FOR
CONCRETE AND REINFORCEMENT DETAILS.
| Sheets and Views |
| 1 COVER |
| 2 SUMMARY OF QUANTITIES AND GENERAL NOTES |
| 3 PROJECT CONTROL |
| 4 TRAIL PLAN & PROFILE |
| 5 DEMOLITION PLAN |
| 6 BRIDGE GENERAL LAYOUT |
| 7 FOUNDATION PLAN |
| 8 ABUTMENT DETAILS |
| 9 ABUTMENT DETAILS |
| 10 BACKFILL AND DRAINAGE DETAILS |
| 2025-03-25T23:08:13-0700 | |
| CAITLIN OSTOMEL |
| 2025-03-27T14:41:21-0700 | |
| DARRELL PEREIRA |
| 2025-03-27T14:47:54-0700 | |
| LEONARD JOB |